Understanding and Quantifying Arc Flash Hazards in The Mining Industry
Understanding and Quantifying Arc Flash Hazards in The Mining Industry
6, NOVEMBER/DECEMBER 2011
2437
I. I NTRODUCTION VER THE last 20 years or more, much progress has been made toward protecting workers from electrical arc ash hazards. In the past, this problem was often not well understood or managed, but signicant advances have been made in understanding electrical arcing faults and the potential for injuries, as well as methods to quantify arc ash hazards, reduce or eliminate them, and protect workers. During the period 19922002, there was an overall decrease in the rate of electrical burns for all industries in the U.S., with industries such as construction and transportation exhibiting a signicant decrease [1]. The increasing attention to arc ash hazards in
Manuscript received October 31, 2007; accepted April 22, 2010. Date of publication September 29, 2011; date of current version November 18, 2011. Paper PID-11-02, presented at the 2007 Industry Applications Society Annual Meeting, New Orleans, LA, September 2327, and approved for publication in the IEEE T RANSACTIONS ON I NDUSTRY A PPLICATIONS by the Mining Industry Committee of the IEEE Industry Applications Society. G. T. Homce is with the Ofce of Mine Safety and Health Research, National Institute for Occupational Safety and Health, Centers for Disease Control and Prevention, U.S. Department of Health and Human Services, Pittsburgh, PA 15236 USA (e-mail: [email protected]). J. C. Cawley, retired, was with the Ofce of Mine Safety and Health Research, National Institute for Occupational Safety and Health, Centers for Disease Control and Prevention, U.S. Department of Health and Human Services, Pittsburgh, PA 15236 USA (e-mail: [email protected]). Digital Object Identier 10.1109/TIA.2011.2169170
recent years, including the evolution of NFPA 70E, Standard for Electrical Safety in the Workplace, may well be partially responsible for this trend [2]. Mining has shown no such sustained improvement however, with the nonfatal electrical burn injury rate remaining constant or increasing for seven of ten years over the same period. A recent study at the National Institute for Occupational Safety and Health (NIOSH) Pittsburgh Research Laboratory (now the Ofce of Mine Safety and Health Research) looked at the issue of arc ash burns in the mining industry. To help characterize this problem, this work reviewed 836 injuries identied by the Mine Safety and Health Administration (MSHA) as noncontact electric arc burns, occurring from 1990 to 2001. The bituminous coal sector accounted for 55% of the injuries, followed by crushed stone and by sand and gravel at 21% and 10%, respectively. Underground operations had 42% of the total, mills and plants 26%, and surface mines 22%. Predictably, the victims were most often electricians and mechanics, making up 59% of the group, but preparation plant workers and laborers were also represented. As also may be expected, the most common work activity was electrical maintenance/repair, but in addition to troubleshooting and repair work, a large number of arc ash incidents were caused by normal operation and subsequent failure of equipment such as circuit breakers. In addition to circuit breakers, other electrical system components commonly involved were conductors, nonpowered hand tools, electrical meters, and plugs or connectors. Of the 35% of cases reporting system voltage, 84% were operating at 600 V or less, and another 10% were operating at 1000 V or more. Title 30 Code of Federal Regulations (30 CFR) contains electrical safety regulations for the mining industry [3]. Several sections of 30 CFR require personal protective equipment (PPE) such as voltage-rated gloves for certain tasks and circumstances, but there are no explicit requirements for protecting workers from arc ash hazards. With a lack of guidance on arc ash protection, one potentially effective solution is to apply the requirements found in NFPA 70E, Standard for Electrical Safety in the Workplace. The current revision of this standard contains extensive recommendations for protecting workers not only from electrical shock but also from arc ash injuries. NFPA 70E does not itself carry the force of law, but in industries monitored by the Occupational Safety and Health Administration (enforcing 29 Code of Federal Regulations), it is used as a template against which to judge workplace electrical safety [4]. The scope of NFPA 70E specically excludes certain types of power systems, including those in underground mines and powering mobile surface mining equipment. Many of its concepts and requirements however, particularly those within the
2438
Safety-Related Work Practices sections, can readily be applied to protecting workers in a mining environment. More specically, NFPA 70E offers guidance on topics such as organizing and managing safe electrical work, worker training and qualications, safety programs, job analysis, minimizing work on energized circuits, and using proper planning, procedures, and equipment when working on energized circuits.
II. M INE P OWER S YSTEM A RC F LASH H AZARD A NALYSIS As part of recent NIOSH research examining the problem of arc ash injuries in mining, an example underground bituminous coal mine power system was analyzed to determine the presence and extent of arc ash hazards. The approach used for this analysis is found in NFPA 70E.
A. Arc Flash Hazard Analysis Requirements and Approach The most effective means to protect workers from both shock and arc ash hazards is to de-energize circuits before performing any work on or near exposed conductors. NFPA 70E stresses this point in its coverage of safety-related work practices. This standard, however, also acknowledges that there are some circumstances where tasks must be performed on energized circuits, such as when troubleshooting. Similarly, 30 CFR [75.820(b)] recommends de-energizing mine power system circuits before work but recognizes exceptions for troubleshooting and testing. NFPA 70E article 130.3 requires that, if work must be done on or near energized circuits, an arc ash hazard analysis must be conducted. An arc ash hazard analysis has two components, rst determining the ash protection boundary (FPB) and then determining the ame-resistant clothing and other PPE that is required to protect someone working inside the FPB. Several basic concepts and denitions are key to understanding how arc ash hazards are measured and how this information can be used to help protect personnel. Arc ash hazards are described in terms of energy, and energy is dened as the product of power and time, such as in the unit kilowatthours used to describe electrical energy usage. An arc ash releases energy in several forms, including light energy and mechanical energy, but current analysis methods focus specically on the thermal energy hazard to workers. The term incident energy (IE) is used to describe the thermal energy to which a worker is exposed in an arc ash incident, and it can be dened as the thermal energy impressed on a surface at some specied distance from the source of an arc ash. IE is a function of several parameters that we can measure or calculate for a power system: 1) arcing fault current magnitude, which, depending on system voltage, may be slightly less than the bolted fault current for the same location; 2) duration of the arcing fault, i.e., the time it takes the system to clear the fault; 3) distance from a worker to the arc; 4) other factors such as conductor spacing, connement in an enclosure, and system grounding.
The most commonly used units for IE are calories per square centimeter (cal/cm2 ) and joules per square centimeter (J/cm2 ).1 Another important term is FPB, which is dened as the distance from an arc ash source within which an unprotected person has a 50% chance of receiving a second-degree burn (a curable burn).2 An IE of 1.2 cal/cm2 (5 J/cm2 ) on unprotected skin is the generally accepted threshold for a 50% chance of sustaining a second-degree burn [5]. Arc-rated clothing has an arc thermal performance value (ATPV) designation, which is the IE in calories per square centimeter (joules per square centimeter) for which the garment can limit heat transfer to the wearer to 1.2 cal/cm2 (5 J/cm2 ).3 NFPA 70E outlines two acceptable approaches for conducting an arc ash hazard analysis. One approach employs general guidelines and tables found in that standard [articles 130.3(A) and (B), table 130.7(C)(9)(a), and table 130.7(C)(10)], which can be used to determine FPBs and PPE requirements without doing a comprehensive power system analysis. Take, for example, the task of removing a starter bucket from a motor control center on a 480-V power system branch on which a fault of 50 kA will clear in six cycles or less. General guidelines assign this situation a FPB of 4 ft (122 cm), and as shown in Fig. 1, Hazard/Risk Category (HRC) 3 PPE is required for the job. HRC is a hazard severity classication system detailed in NFPA 70E that species minimum arc ash PPE based on IE ranges. The HRC system is summarized in Fig. 2. The simplied approach found in NFPA 70E, however, may not be applicable to some maintenance tasks or on power systems with available fault currents or fault clearing times outside certain limits. Additionally, these simplied methods may yield unacceptably conservative PPE requirements. Another approach is to perform more comprehensive arc ash hazard calculations involving detailed power system parameters. This approach can accurately quantify arc ash hazards on a wide range of power systems, but such an analysis can be very time consuming and costly to perform. Currently, one of the most common methods used to perform a comprehensive arc ash hazard analysis is IEEE standard 1584-2004a, IEEE Guide for Performing Arc-Flash Hazard Calculations [6]. Commercially available power system analysis software packages often use IEEE 1584 to assess arc ash hazards. For the NIOSH research described in this paper, an example mine power system was assessed for arc ash hazards through a comprehensive detailed analysis, using commercially available power system analysis software applying IEEE standard 1584 techniques.
cal = 4.184 J, and 1 J = 1 W s. term ash protection boundary was changed to arc ash protection boundary in the 2009 edition of NFPA 70E. This paper retains the earlier version, in use at the time it was written. 3 The arc rating of clothing may designate break-open threshold energy (EBT ) instead of ATPV. This indicates that the break-open of the re-resistant material (exposing skin or underlying layers), rather than heat transfer through the material, limits the protection afforded by the clothing. See ASTM 150602a for more information on ATPV and EBT .
11 2 The
HOMCE AND CAWLEY: UNDERSTANDING AND QUANTIFYING ARC FLASH HAZARDS IN THE MINING INDUSTRY
2439
Fig. 1.
Excerpt from NFPA 70E table 130.7(C)(9)(a), showing the arc ash HRC for removing a starter bucket from a 480-V motor control center.
Fig. 2. Summary of arc ash HRCs, based on NFPA 70E table 130.7(C)(11) and article 130.7(C)(5).
B. Example Mine for an Arc Flash Hazard Analysis MSHA data for 1993 through 2002 show that, for all U.S. mining operations, 55% of noncontact electric arc (ash) burns occurred in the bituminous coal mining sector. Of the arc ash injuries in coal mining, 61% were in underground bituminous coal operations producing between 250 thousand and 5 million short tons (227 thousand and 4.54 million metric tons) per year, with almost half of these in operations producing between 250 thousand and 1 million short tons (227 thousand and 907 thousand metric tons) per year. Based on these data, a mine producing approximately 500 thousand short tons (454 thousand metric tons) per year was used to represent a small underground coal mine for a mine power system arc ash hazard analysis. Using a 500-thousand-short-ton (454 thousand metric tons)per-year target, an example mine and the necessary electrical power system were designed. The mine has shaft and slope access to an 8000 ft 8000 ft (2438 m 2438 m) reserve with 6-ft (183 cm) seam height. The operation has two continuous mining sections employing room and pillar development and
Fig. 3. Layout of the example underground coal mine used for arc ash hazard analysis.
full retreat. Shuttle cars are used for face haulage, and beltlines are used for main haulage. Additional details are listed in Appendix I. Fig. 3 shows the mines general layout. C. Arc Flash Hazard Analysis Method and Software The arc ash hazard analysis for the example underground bituminous coal mine was done using a commercially available power system analysis software package. The software applies IEEE standard 1584-2004a to determine IEs to which workers could be exposed during three-phase power system arcing faults. Quantifying IE allows determination of the FPB and necessary PPE when working inside this boundary. IEEE 1584 employs an empirically derived model for systems between 208 V and 15 kV with bolted fault currents between 700 A and 106 kA and uses a separate theoretical model for systems above 15 kV. Other limitations apply to the use of these models and are outlined in detail in the standard. Note that the standard
2440
focuses only on the IE hazard presented by an arc ash and does not consider hazards from molten metal, projectiles, pressure waves, or toxic by-products. Although IEEE 1584 deals primarily with the development and use of the empirical and theoretical models needed for determining arc ash hazards, it presents them within the framework of a nine-step analysis process. 1) Compile detailed power system information for power sources, conductors, transformers, loads, and circuit protection devices. 2) Identify system modes of operation that provide maximum and minimum three-phase fault currents. 3) Calculate the three-phase bolted fault current and X/R ratio for each point of interest on the system. 4) Calculate the arcing fault current for each point, and determine the current passing through the associated protective device(s). 5) Determine the duration of the arcing fault for each point, based on protective device characteristics and settings. 6) Identify equipment voltage/class for each point to determine typical conductor spacing. 7) Select working distance (normally assumed as the distance from conductors to a workers face or torso). 8) Determine the IE to which a worker would be exposed, at each point. 9) Determine the FPB at each point [normally considered to be the distance at which the IE is 1.2 cal/cm2 (5 J/cm2 )]. It is beyond the scope of this paper to describe in detail each of the steps listed above, or the actual use of the power system analysis software, but a number of key points are listed in Appendix II to help guide the reader interested in conducting similar ash hazard analyses. D. Arc Flash Hazard Analysis Results Using the example mine and procedures just described, an arc ash analysis was performed to examine specic locations on a mine power system where an arcing fault could be initiated during maintenance or routine operation of equipment. Three cases are presented in the following. In the initial modeling of the power system, circuit protection devices were sized and adjusted to provide equipment protection and optimum system selectivity (coordination of devices for good continuity of operation). For each case, trials were run with and without motor contributions to the fault current, and the condition creating the more severe arc ash hazard was used. Because IE is a function of available fault current, time, and distance from the arc, a lower fault current can be counteracted by the associated increase in fault clearing time and can produce a higher energy. The results for each case list IE, FPB, and HRC. Each case rst lists the potential arc ash hazard for the power system in its original conguration. Then, some condition or sizing of a circuit protection device is changed to illustrate the effect on the arc ash hazard. Case 2 includes an evaluation using the NFPA 70E simplied method described earlier, as a comparison to the results obtained from the detailed analysis using IEEE 1584. 1) 7200-V Switch HouseCase 1: This case considers an arcing fault on the input conductors of the rst 7200-V distrib-
Fig. 4. One-line diagram for the 7200-V distribution switch house in analysis case 1.
ution switch house downstream of the mine power borehole. Fig. 4 shows the switch house one-line diagram. The fault is cleared by 50/51 electronic relays and a vacuum breaker upstream at the mine substation output.4 FPB = 81 in (206 cm). IE = 2.6 cal/cm2 (10.9 J/cm2 ) at 36-in (91 cm) working distance (36 in (91 cm) is the default working distance for 5- and 15-kV class switchgear in IEEE 1584). HRC 1. For this situation, 36 in (91 cm) may not be a realistic working distance; therefore, the analysis was run again with a working distance of 18 in (46 cm). IE = 5.2 cal/cm2 (21.8 J/cm2 ) at 18 in (46 cm). HRC 2. This doubled the IE, increasing the HRC by one level. Fig. 5 shows an electrical hazard warning label appropriate for the above switch house. This label was automatically generated by the software used for the analysis and includes information for arc ash and electrical shock protection. 2) Slope Bottom Load Center 600-V OutputCase 2: This case considers an arcing fault on the secondary of a load center two-winding 750-kVA transformer, upstream of the main 600-V bus circuit breaker in that load center. This case is shown in Fig. 6 (Fault A). The fault is cleared by 8250-V 65-A currentlimiting fuses at the transformer primary in the load center. FPB = 95 in (241 cm). IE = 18.2 cal/cm2 (76.2 J/cm2 ) at 18-in (46 cm) working distance. HRC 3.
4 50 and 51 are IEEE device identication numbers for instantaneous and time delay overcurrent relays, respectively.
HOMCE AND CAWLEY: UNDERSTANDING AND QUANTIFYING ARC FLASH HAZARDS IN THE MINING INDUSTRY
2441
Fig. 5. Electrical hazard warning label generated by the power system analysis software, for the 7200-V switch house in case 1.
Fig. 6. One-line diagram for the slope bottom load center 600-V output in analysis case 2.
A signicant arc ash hazard exists at this location and should be reduced if possible. Note that the current-limiting capability of the fuses involved does not mitigate the arc ash hazard because the fault current is not high enough to cause the fuses to open in their current-limiting range (a current-limiting clearing time of one-half cycle or less). Current-limiting fuses, however, can help reduce an arc ash hazard when high IE is due to high available fault current. Reducing the ampere rating of the fuses, clearing this fault will help to limit the hazard, although there will be some loss of selectivity in overall system protection, and nuisance tripping may become a problem. The analysis was run again with the
fuse size reduced from 65 to 50 A (for the model of the fuse specied for this transformer, a wide range of current ratings have the same physical size and conguration). FPB = 55 in (140 cm). IE = 7.5 cal/cm2 (31.4 J/cm2 ) at 18-in (46 cm) working distance. HRC 2. The smaller fuse size cuts the IE by over 50% due to a shorter clearing time, and the HRC drops one level. If additional loss of selectivity and nuisance tripping can be tolerated, the hazard can be reduced even further by installing 40-A fuses, with the following results. FPB = 34 in (86 cm). IE = 3.3 cal/cm2 (13.8 J/cm2 ) at 18-in (46 cm) working distance. HRC 1. If, for some reason, 80-A fuses are installed at the transformer primary at this location, analysis reveals the following (80 A is larger than needed for this application). FPB = 161 in (409 cm). IE = 43.7 cal/cm2 (182.8 J/cm2 ) at 18-in (46 cm) working distance. Exceeds HRC 4. The potential IE exceeds 40 cal/cm2 (167 J/cm2 ), and any unprotected worker within approximately 13 ft (396 cm) of the arc could be seriously injured. At levels above 40 cal/cm2 (167 J/cm2 ), NFPA 70E recommends that under no circumstances should work be performed on the circuit while energized, due to the extreme hazard. Prohibiting live work, however, does not completely eliminate the risk since many arcing faults are caused by electrical equipment failure during normal operation. If the arcing fault in this load center occurs just downstream of the main circuit breaker protecting the 600-V bus (Fault B in Fig. 6), the fault is cleared by that circuit breaker instead of the transformer fuses. FPB = 16 in (41 cm). IE = 1 cal/cm2 (4.2 J/cm2 ) at 18-in (46 cm) working distance. HRC 0. Because of the reduced clearing time, the IE is quite low and requires minimal protection as listed in Fig. 2. As a comparison of analysis approaches, the preceding situation (where the arc ash occurs just downstream of the 600-V circuit breaker) was re-evaluated using simplied methods employing guidelines and tables in NFPA 70E instead of detailed IEEE 1584 calculations. If the task being performed on the circuit is voltage measurement or other energized work, NFPA 70E article 130.3(A) and table 130.7(C)(9)(a) specify the following. FPB = 48 in (122 cm). IE is not quantied in this method. HRC 2, with addition of HRC 3 head/face protection.5
5 The 2009 edition of NFPA 70E allows the use of an arc-rated face shield worn with an arc-rated balaclava (sock hood) in lieu of HRC 3 head/face protection (a full switching suit hood) in this situation.
2442
Fig. 7. One-line diagram for the 2 North load center 600-V output in analysis case 3.
The FPB and protective equipment requirements generated by this approach are very conservative compared to those indicated by a detailed analysis. 3) 2 North Load Center 600-V OutputCase 3: Here, an arcing fault occurs on the 600-V secondary of a load center three-winding 1250-kVA transformer, upstream of the main 600-V bus breaker in that load center. The one-line diagram for this case is shown in Fig. 7. The load center transformer is protected by 8250-V 80-A current-limiting fuses at its primary, but due to necessary coordination compromises in the original power system design, the fault is cleared by 50/51 relays and a vacuum breaker at a 7200-V switch house approximately 2000 ft (610 m) upstream. FPB = 175 in (445 cm). IE = 50.1 cal/cm2 (209.6 J/cm2 ) at 18-in (46 cm) working distance. Exceeds HRC 4. Although the combined capacity of this three-winding transformer suggests that 80-A fuses are required, their use and the associated adjustment of the upstream relays create an unacceptably high arc ash hazard at the 600-V secondary. An arcing fault at this point could potentially injure unprotected workers over 14 ft (427 cm) away. As was described in case 2, reducing the fuse size may be a practical solution for mitigating an arc ash hazard if eld experience shows that it will not cause unacceptable nuisance tripping. For the 2 North load center with the fuse ratings reduced from 80 to 65 A, the fuses now clear the fault. FPB = 160 in (406 cm).
IE = 43.0 cal/cm2 (179.9 J/cm2 ) at 18-in (46 cm) working distance. Exceeds HRC 4. As can be seen from these results, however, the reduction in clearing time is not sufcient to reduce the arc ash hazard to a manageable level. Reducing the fuse size to 50 A gives the following results. FPB = 88 in (224 cm). IE = 16.3 cal/cm2 (68.2 J/cm2 ) at 18-in (46 cm) working distance. HRC 3. The arc ash hazard is still signicant, but energized work is possible with proper precautions and protective equipment. Another solution to the extreme arc ash hazard at the 2 North load center is the replacement of the three-winding transformer with 2 two-winding transformers, each with properly sized fuses at their primaries (separate 600- and 995-V output transformers). This approach, of course, would involve a complete redesign of the load center and so would often not be feasible on an existing system. Even for a new load center, the additional cost and space required for multiple transformers may be difcult to accommodate. If implemented however, the use of smaller fuses possible with two separate transformers would help reduce IE. In the 2 North load center, for example, an individual 7200- to 600-V 500-kVA transformer would require a 40-A fuse, resulting in the following potential arc ash hazard. FPB = 57 in (145 cm). IE = 7.9 cal/cm2 (33.0 J/cm2 ) at 18-in (46 cm) working distance. HRC 2. E. Important Points From the Arc Flash Hazard Analysis Results The arc ash hazard analysis performed on the example mine illustrates a number of important points, both about arc ash hazards on mine power systems and for such analyses in general. 1) Arc ash analyses must consider all likely power system congurations and modes of operation, since the highest available fault current for a given point often does not deliver the highest IE. 2) For analysis of an existing power system, it is essential that information such as cable sizes and lengths, load characteristics, and protective device characteristics and adjustments be complete and accurate. 3) Coordination of power system circuit protection devices for optimum selectivity does not necessarily prevent or reduce arc ash hazards on the system. 4) Numerous locations on a typical mine power system can present arc ash hazards, with some locations having the potential for extremely dangerous arcing faults. 5) Arc ash hazards can be reduced in many cases by proper selection or adjustment of circuit protection devices such as fuses, although some loss of selectivity may be necessary.
HOMCE AND CAWLEY: UNDERSTANDING AND QUANTIFYING ARC FLASH HAZARDS IN THE MINING INDUSTRY
2443
6) The secondaries of three-winding transformers in load centers can present arc ash hazard levels too dangerous to allow energized work under any circumstances (exceeding HRC 4). 7) Some hazards may require re-engineering the power system or specic components to reduce potential IE to a manageable level, such as using multiple transformers instead of a single three-winding transformer in a load center. 8) Notwithstanding the simplied guidelines and tables found in NFPA 70E, voltage level, available power, or equipment type cannot be used as reliable indications of potential arc ash hazards; rather, a comprehensive analysis must be performed to positively identify and quantify these hazards. 9) The use of current-limiting fuses does not, in itself, always help to reduce or eliminate arc ash hazards, since the fault current in question may be below that necessary for the fuse to operate in its current-limiting range. 10) Equipment should be labeled to clearly communicate electrical hazards to workers. 11) Arc ash analyses should use realistic working distances for electrical equipment in a mining environment. 12) The extent and severity of arc ash hazards on mine power systems reinforce the importance of avoiding work on energized circuits except when absolutely necessary. 13) It is important that personnel carrying out arc ash hazard analyses thoroughly understand the process and methods involved, in order to accurately assess hazards, as well as recognize suspect results. III. S UMMARY Electrical arc ash incidents were the most common cause of nonfatal electrical injuries in the U.S. mining industry from 1996 to 2005. These incidents often occur during electrical maintenance and repair work and involve electricians and mechanics, but they can also be the result of unexpected failure of electrical equipment such as circuit breakers during normal operation and endanger other workers as well. Arc ash hazards are an issue that has not yet been effectively addressed in the mining industry, but intervention strategies and techniques developed in other industries over the last two decades can be applied to help solve this problem. NFPA 70E, Standard for Electrical Safety in the Workplace, is the most comprehensive and widely used source for recommendations on this topic. As part of a NIOSH study of arc ash hazards in mining, a comprehensive arc ash hazard analysis as proscribed by NFPA 70E was performed on the power system for a small underground bituminous coal mine. The study revealed that such a power system has many locations that can endanger personnel, ranging from some requiring minimal protective arc ash rated clothing and equipment to those that dictate major system changes or redesign to manage the ash hazard. The analysis results conrm that the mining industry needs to aggressively address the problem of electrical arc ash injuries. Prevention efforts must include better management of electrical work, including minimizing work on energized circuits, use of safe
procedures for maintenance and repair work, and use of proper protective clothing and equipment, as well as consideration of arc ash hazards in power system design and maintenance, and improved employee education and training. Additionally, arc ash incidents occurring during normal operation of power system components point to a need to improve the design, installation, and maintenance of such components, as well as include arc ash hazard awareness as part of electrical safety education for all employees. A PPENDIX I E XAMPLE M INE AND M INE P OWER S YSTEM D ESIGN D ETAIL 1) There is one continuous miner per section. 2) The total mine production is estimated at 575 thousand raw short tons (522 thousand metric tons) per year, based on continuous mining production estimates from existing mines in southwestern Pennsylvania using two 8-h production shifts/day, ve production days per week, and an average development/retreat ratio of 2/1. 3) The power system model places both continuous miner sections near their maximum distance from the power borehole, 4000 to 5000 ft (1219 to 1524 m). 4) The maximum haulage beltline length is 2000 ft (607 m). 5) The maximum grade of the seam is 2.5%. 6) Rubber-tired/battery-powered equipment is used for supply and personnel transport. 7) The mine has a large underground equipment maintenance shop. 8) All underground loads are supplied by a single substation and radial distribution system (surface facilities are on their own separate substation). 9) The power system conforms to current 30 CFR requirements. 10) The utility bus is assumed to be 1000 MVA at X/R = 10. 11) High voltage distribution is 7200 Vac nominal, continuous miners are 950 Vac nameplate, and all other equipment is 550 Vac nameplate except for 460-Vac loads in the underground shop. 12) Cables were sized using a load factor method, all motor efciencies = 0.93, and the demand factor outby the East Mains at 1 North intersection = 0.8. 13) Transformers are all deltawye with high-resistance grounded secondaries (15-A limit). 14) Transformer taps are set to give 5% voltage drop at all loads, based on a load ow study. 15) High voltage distribution is protected by 50/51 electronic relays and vacuum circuit breakers. 16) E -rated current-limiting fuses protect the load center transformer primaries. 17) Molded-case circuit breakers protect utilization voltage portable power cables. A PPENDIX II E XAMPLE M INE P OWER S YSTEM M ODELING D ETAIL 1) It is assumed that any line-to-line fault will almost immediately escalate to involve all three phases as air
2444
2)
3)
4)
5)
6) 7)
8)
ionizes across them; therefore, only three-phase faults are considered in the analysis (this is a general assumption in IEEE 1584).6 The analysis modeled faults both without motor fault current contributions and with one-cycle contributions for all motors 50 hp (37.3 kW) or larger. All mine power and trailing cable data were entered manually, using typical mining cable characteristics as published in the Mining Cable Engineering Handbook, by Anaconda Company (1977).7 A number of power system characteristics were set at the software default values, such as transformer inrush equal to 12 the full load current for 0.1 s, cable damage temperatures of 90 C continuous and 250 C maximum, and motor starting current at full voltage equal to 5.9 the full load current for 10 s. The arc ash maximum duration was set at the software default of 1000 s (this feature allows the software user to account for a workers reaction to move away from the arc ash; therefore, a very large value such as 1000 s assumes that a worker will not react to move away prior to the fault being cleared). Fault current tolerances were set to 15% and +0% (these values are recommended in IEEE 1584). The energy accumulation threshold was set at 70%, to enable a software feature that checks for miscoordination of protective devices (the concept of energy accumulation accounts for multiple parallel sources of fault current that have different clearing times and so contribute different amounts to the overall IE during an arcing fault). The vacuum breaker opening time was set to 0.300 s. ACKNOWLEDGMENT
[3] Title 30-Code of Federal Regulations2006 (30 CFR), U.S. GPO, Available in electronic format from www.gpoaccess.gov/nara or in print from the Government Printing Ofce at 888-293-6498. [4] Title 29-Code of Federal Regulations2006 (29 CFR), U.S. GPO, Available in electronic format from www.gpoaccess.gov/nara or in print from the Government Printing Ofce at 888-293-6498. [5] D. R. Doan and R. A. Sweigart, A summary of arc ash energy calculations, IEEE Trans. Ind. Appl., vol. 39, no. 4, pp. 12001204, Jul./Aug. 2003. [6] IEEE Guide for Performing Arc Flash Hazard Calculations, IEEE Std. 1584-2004a, 2004.
Gerald T. Homce received the B.S. degree in mining engineering and the M.S. degree in mining engineering with minor in electrical engineering from The Pennsylvania State University, University Park. He is currently a Lead Electrical Engineer with the Ofce of Mine Safety and Health Research, National Institute for Occupational Safety and Health, Centers for Disease Control and Prevention, U.S. Department of Health and Human Services, Pittsburgh, PA. His research has addressed electrical safety topics such as overhead electrical power line hazards, electrical arc ash injuries, and characterizing occupational electrical accidents. He has also been involved with research on communications and personnel tracking technology for mining. Mr. Homce is a Registered Professional Engineer, a Licensed Mine Foreman, and a member of the Society for Mining, Metallurgy and Exploration.
The ndings and conclusions in this report are those of the authors and do not necessarily represent the views of the National Institute for Occupational Safety and Health. R EFERENCES
[1] J. C. Cawley and G. T. Homce, Trends in electrical injury, 19922002, presented at the IEEE-PCIC Conf., Philadelphia, PA, Sep. 2006, Paper PCIC- PH-083. [2] Standard for Electrical Safety in the Workplace, NFPA Std. 70E-2004, 2004.
James C. Cawley (M82SM83) received the B.S.E.E. degree from The Pennsylvania State University, University Park, and the M.B.A. degree from the University of Pittsburgh, Pittsburgh, PA. He is an Engineering Consultant specializing in electrical injury surveillance and statistics. He retired from the Pittsburgh Research Laboratory, National Institute for Occupational Safety and Health, Centers for Disease Control and Prevention, U.S. Department of Health and Human Services, Pittsburgh, as a Senior Electrical Research Engineer. His work there included electrical accident surveillance, investigations into accidental overhead power line contact by cranes and trucks, and the application of arc ash safety protection to underground mines. Prior to that, he was with the U.S. Bureau of Mines in the areas of electrical safety, intrinsic safety, and explosion proof electrical enclosures. Mr. Cawley is a Registered Professional Engineer in the Commonwealth of Pennsylvania.
6 It should be noted that electrical power systems in U.S. coal mines have unique design features, required by 30 CFR, that help reduce the potential for dangerous arcing faults. High-resistance grounding limits the current available at a ground fault until ground fault protection de-energizes the circuit involved, greatly reducing the chance of escalation to a three-phase fault. In addition, grounded shielding in large portable power cables reduces the chance of a highenergy fault in the event of cable damage. 7 Use of product or company names does not imply endorsement by the authors, NIOSH, or the federal government.