Migration Manual
Migration Manual
Initiation
Preparation
Implementation
Initiation Phase
a. If 1. has Finance, Procurement, Inventory and/or HR: Contact IFS for pre-engineering session for migration (2/3 days, depending on the number of modules) Analyze interfaces local systems with local IFS & assess future need Checklist interfaces Connectivity check a. Test connectivity between Charlotte and Hong Kong server and share results with Global server selection test b. Check connectivity compliancy to IFS requirements. If requirements are not met, share results with Connectivity compliancy test Install project organization Project organization proposal
Details
IT manager to execute initiation phase No cost estimate and no project timeline available yet Time line: 2 weeks Costs: Internal FTE
Output
Overview of modules to be migrated Decision on CMMS to be implemented or not Pre-engineering session(s) planned and contracted Interfaces analyzed Project organization installed Designated server assigned (Hong Kong or Charlotte) Connectivity assessment report with required actions
Initiation
Preparation
Implementation
Preparation
1. Prepare Pre-engineering session a. Read the user manuals on APMT Control Request user id at: b. Read Finance -, HR - and Procurement Solution Definition Documents (SDD) on APMT Control c. Collect local reports d. Collect document layouts 2. Execute pre-engineering session a. Demo b. Impact Terminal in the Box c. Interface requirements d. How to set up IFS accounting rules e. Expectations high level implementation plan f. IFS contribution versus local contribution during project 3. Formalize project plan a. Result IFS pre-engineering b. Master data migration c. Interface requirements d. Connectivity issues 4. Get approval from local management
Details
Project organization to execute preparation phase Open balance data migration Old local IFS data remains on local instance for auditing purposes. If CMMS is also implemented, preparation should be coordinated with CMMS project (Roll Out CMMS.ppt). Time line: 3 weeks Costs: app. 12,000 USD (excl. travel)
Output
Local Solution Definition Document (SDD) Approved and finalized project plan, including ownership per activity Approved and signed service request IFS Overall terminal migration budget (Connectivity charges, local interfaces, (IFS) consultancy costs) Projection CENAPTM charges (Entry fee & Running costs)
Initiation
Preparation
Implementation
Implementation
1. Implement project plan a. Super user training b. Solution implementation i. Order connectivity upgrade if required ii. Application configurations (SDD) iii. Interface lifting (SDD) iv. Data migration (SDD) c. End user training & Customer Solution Test d. Deployment / Cut over e. Go Live
Details
Project organization to execute implementation phase If CMMS is also implemented, implementation of CMMS should be locally coordinated with the migration project (Roll Out CMMS.ppt). Time line: 3 months Costs: To be fine tuned during/after pre-engineering session
Output
Live system
Yes Yes No No
Finance Finance
Requires supplier invoice matching Requires purchasing if subcontracted labor is used but requires customer order & invoicing Requires purchasing (although you can do manual receipts or count to increase stock), invoicing of container repair requires Finance.
No No
Under developme nt
No
HR; Finance
II - Checklist Interfaces
Description (examples) Needed after migration? Business critical? Frequency One/two update way interface Data format Band width Business owner Business Requirement new situation. Accepted delay None / Minutes / Hours / Days None / Minutes / Hours / Days None / Minutes / Hours / Days None / Minutes / Hours / Days None / Minutes / Hours / Days None / Minutes / Hours / Days None / Minutes / Hours / Days None / Minutes / Hours / Days
Fuelomat
Yes / No
Yes / No
Yes / No
Banking
Yes / No
Etc.
Yes / No
Etc.
Yes / No
Etc.
Yes / No
Etc.
Yes / No
Bandwidth QoS