3. Time Table
Students are supposed to complete their project work within a period of 6 months i.e. two quarters from the date of admission. Activity Admission to Project Course Submission of Project Proposal Approval of Project Work Project Work starts First reporting Second reporting Third reporting Printing of Report Submission of Report End Examination of Project Work Date After completing all the theory courses of the degree programmes(BSC(BIS) or BCA) Within one month from admission to project work. Within 15 days from submission of project proposal Immediately after approval of project proposal At the end of 3rd month from start At the end of 4th month from start At the end of 5th month from start After 3rd reporting and on approval of the guide and the coordinator of the study centre. On or Before 15 days of End Examination Will be announced by the University
Person giving guidance in industry or business world is known External Guide Teacher responsible to guide the student at the SC is known Internal Guide Every project will have two guides : Internal Guide and External Guide Student should report the progress of his project work to the internal guide three times during the tenure of project work. At the end of the project, student should prepare written document of his work in the form of Project Report.
Duration (for 1 group) 20 minutes Presentation Viva 15 minutes Demonstration 15 minutes Report checking 10 minutes Students shall be given 30 minutes time to make preparations of their presentation and demonstration in the lab(students are advised to carry out preparation on the previous day) Project Work carries Total 300 Marks * Project Report * Presentation(PowerPoint based) * Viva * Demonstration 100 marks 80 marks 60 marks 60 marks
9. Preliminary pages
* * * * * * Cover Page Title page Approval Page (completion certificate) Acknowledgements Synopsis Table of contents
11. Bibliography
* List of references * Appendices(program listing, forms of exiting system if any, user manual etc.)
* * * *
the degree for which the thesis is submitted the name of the school which has offered the program the name of the university the date (month and year) of submission.
15. Synopsis
* It should preferably be a single page (150 words max) * The synopsis should be a summary or condensation of the project.
16. Acknowledgement
* The acknowledgment should not be more than one page. * The student may acknowledge financial support, permission to use copy-righted materials, trademarks, service marks, personal assistance etc.
* * * * * *
System Functional Specification Off-line or On-line Help feature Quality parameters/procedures Encryption/Security features Future Directions Results / conclusion
20. Paper
* To insure durability, permanency, and opacity, project report should be printed on A4 size white bond paper
22. Margins
* Every page of the report, including all appendices, all notes, and the bibliography must have a LEFT and RIGHT margins of 1 inches (to allow room for binding) and TOP and BOTTOM margins of 1 inch. * Nothing should appear in LEFT and RIGHT margins. This means that all page numbers, text, tables, parts of illustrations, etc., must not appear in the margin area.
25. Binding
* The project report must be clothbound (hardcover binding) and must be in light gray or black color. Spiral binding is NOT allowed. * The outside cover of the project report must follow the format described earlier and the lettering must be printed in gold letters.
26. Sample Title Page Title of the Project A project Submitted to the School of Computer Science of Yashwantrao Chavan Maharashtra Open University, Nashik, in Partial Fulfillment of the Requirements for the Degree of Bachelor of Science (Information Technology) by Name of the Students Year
Certificate of Evaluation
This is to certify that the undersigned have assessed and evaluated the Project Work titled submitted by the following students.
1) 2) 3) The project Report has been (accepted / rejected) for the partial fulfillment of BSc(BIS) / BCA programme.
Certificate of Completion
This is to certify that the team of the following students of BSc(BIS)/BCA have completed the Project Work titled . under my guidance and supervision. The project report has been written according to the guidelines given by the Yashwantrao Chavan Maharashtra Open University. 1) 2) 3)
Signature of the Study Centre Coordinator Name of the Study Centre Coordinator