Extra Work Model

This document is a job card summarizing extra works for demolishing and rebuilding foundations at a plant in Kharafi National, Kuwait. It provides details of the work including descriptions of labor and materials, estimated costs, actual costs according to time sheets and invoices, and approvals from the subcontractor and Saipem representatives. The total estimated cost was 6,653.34 KWD and the total actual cost according to the job card data was 6,500.77 KWD.

Uploaded by

kathalyogi
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
121 views

Extra Work Model

This document is a job card summarizing extra works for demolishing and rebuilding foundations at a plant in Kharafi National, Kuwait. It provides details of the work including descriptions of labor and materials, estimated costs, actual costs according to time sheets and invoices, and approvals from the subcontractor and Saipem representatives. The total estimated cost was 6,653.34 KWD and the total actual cost according to the job card data was 6,500.77 KWD.

Uploaded by

kathalyogi
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

LAVORI EXTRA ( EXTRA WORKS ) Tipo ( 1 ) ( Type ) Classe di costo

( code )

BUILDING EXTRA WORKS


( NO ) Saipem Impianto ( Plant ) Contratto
KN ( contract ) ( Time )

DATA N0 01 Sheet 01 ( DATE ) COMMESSA ( JOB ) Termine esecuzione 7-Sep-11 032092

Time work & Material supply ( Request by ) Name Impresa


( Subcontractor )

Richiedente

BS - 171

Kharafi National

45283 Non

Date

1-Sep-11 Non

To

7-Sep-11 Non-confor. Non

Disciplina

Civil (Bldg)

Codice

CA

Backcharge

Assicurazione

Descrizione dei lavori ( Description of works )

Control Building, for foundation F1(16No's), F2 (2No's) & F3(1 No) demolising and casting of foundation as of revision in drawing.

Motivazione dei lavori ( Reasons )

Control Building, for foundation F1(16No's), F2 (2No's) & F3(1 No) demolising and casting of foundation as of revision in drawing. SAIPEM revised the drawing

PREVENTIVO
( ESTIMATION )
MANO D'OPERA ( MANPOWER ) QUALIFICA
( TRADE )

RIF.
( REF )

ORE
( HOURS )

PREZZO
( PRICE )

IMPORTO
( TOTAL )

MATERIALI E MEZZI D'OPERA (MATERIALS AND EQUIPMENT) DESCRIZIONE RIF. ORE PREZZO IMPORTO
( DESCRIPTION ) ( REF ) ( Qty ) ( PRICE ) ( TOTAL )

Forman Chargehand Carpenter Mason Concrete finisher Helper/labourer

URP SW 2 9 URP SW 2 10 URP SW 2 13 URP SW 2 14 URP SW 2 15 URP SW 2 16

65 60 60 40 50 64

4.18 3.98 1.57 1.65 1.89 1.26

271.70 Material 238.80 Material uplift 15% 94.20 66.00 94.50 80.64

A3.01 A3.02

5050.00

5050.00 757.50

Subtotal

845.84

Subtotal

5,807.50

Totale KWD

6,653.34

ANNOTAZIONI
( NOTES ) none

( 1 ) Economia ( Time Work ) - Prezzi Unitari ( Unit Prices ) - Forfait ( Lump Sum )

Firma del richiedente


( Signature of applicant ) .

Per Saipem
( Saipem Reps ) . KWD

Importo previsto
( Total estimated ) 6,653.34

L' Impresa
( Subcontractor )

CONSUNTIVO ( JOB CARD DATA ) Control Building, for foundation F1(16No's), F2 (2No's) & F3(1 No) demolising and casting of foundation as of revision in drawing. SAIPEM revised the drawing
MANO D'OPERA ( MANPOWER ) QUALIFICA ( TRADE ) Forman Chargehand Carpenter Mason Concrete finisher Helper/labourer RIF. ( REF ) URP SW 2 9 URP SW 2 10 URP SW 2 13 URP SW 2 14 URP SW 2 15 URP SW 2 16 ORE ( HOURS ) 52 54 60 40 35 64 PREZZO ( PRICE ) 4.18 3.98 1.57 1.65 1.89 1.26 IMPORTO ( TOTAL )

DATE

12-Oct-08

to

25-Oct-08

MATERIALI E MEZZI D'OPERA (MATERIALS AND EQUIPMENT) DESCRIZIONE ( DESCRIPTION ) RIF. ( REF ) A3.01 A3.02 ORE ( Qty ) 1 PREZZO ( PRICE ) 5010.00 IMPORTO ( TOTAL ) 5010.00 751.50

217.36 Material 214.92 Material uplift 15% 94.20 66.00 66.15 80.64

Total KWD

739.27

Total KWD

5,761.50

N ( NO )

Data ( Date )

N ( NO )

Data ( Date )

N ( NO )

Data ( Date )

Man power Equipment & Material


Total amount job card data

KWD KWD KWD

739.27

5,761.50

6,500.77

L' Impresa
(Subcontractor)

Importo complessivo
(Total amount)

Firma del Richiedente


(Signature of applicant)

per SAIPEM
(SAIPEM Reps)

KWD 6,500.77