100% found this document useful (6 votes)
10K views1 page

Estimate Guide-Dry Walls

The document provides a list of materials and their costs per square meter for three types of ceiling and wall installations: 1) Ceiling furring which includes double furring, wall angles, C-channels, clips, rivets, hangers, and boards. 2) Drywall partitions which include studs, tracks, rivets, screws, putty, mesh tape, and nails. 3) Acoustic tee runners in two sizes which include main and cross tees, wall angles, clips, hangers, boards, and nails. Quantities for each material are given based on area and other calculations.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (6 votes)
10K views1 page

Estimate Guide-Dry Walls

The document provides a list of materials and their costs per square meter for three types of ceiling and wall installations: 1) Ceiling furring which includes double furring, wall angles, C-channels, clips, rivets, hangers, and boards. 2) Drywall partitions which include studs, tracks, rivets, screws, putty, mesh tape, and nails. 3) Acoustic tee runners in two sizes which include main and cross tees, wall angles, clips, hangers, boards, and nails. Quantities for each material are given based on area and other calculations.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

CEILING FURRING(per sq.meter) 1. Double Furring 2. Wall Angle 3. C-Channel 4. W-Clip 5. Blind Rivets 6. Suspension Clip/Rod Joiner 7.

Steel Angle 8. Hanger Rod #8 9. Screw 10. 4' x 8' Board 11. Putty @ 28kg/pail 12. Mesh Tape @ 250' 13. Screw 0.36 0.27 0.16 1.44 3.00 0.80 0.80 Pcs of steel angle x 9.31 lm/kg Pcs of Boards x 40pcs/board Area/2.88 sq.m Area x .01 Area x .01 Pcs. Of Boards x 40 pcs/bd

DRYWALL PARTITION (per sq. meter) 1. Studs 2. Tracks 3. Blind Rivets 4. Screw 5. Putty @ 28 kg/pail 6. Mesh Tape @ 250' 7. Concrete Nail (1") 0.67 0.44 No. of Studs x 10 No. of Boards x 40 Area x .02 Area x .02 Area x .005

ACOUSTIC TEE RUNNERS 2' x 4'/2'x2' (per sq. meter) 1. Main Tee 12' 0.24 2. Cross Tee 4' 1.80/1.60 3. Wall Angle 0.27 4. Suspension Clip/Rod Joiner 0.8 5. Steel Angle 0.8 6. Hanger Rod #8 Pcs of steel angle x 9.31 lm/kg 7. Boards Area/.72 8. Concrete Nail (1") Area/.005

You might also like