Productivity Sheet Piling S

Sheet piling involves installing interlocking steel sheets into the ground to retain or hold back soil, sand, or water. There are several methods for installing sheet piling including driving them in using impact hammers or vibro hammers, pressing them into place using a silent piler machine, or pre-drilling or pre-augering the soil to facilitate installation. Proper installation techniques involve starting from the ends and working toward the middle, staggering seams between sheets, and using guide beams and corner piles to ensure proper alignment. Factors like soil conditions, sheet pile type and size, and hammer type influence installability and required equipment.

Uploaded by

roldski
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
432 views

Productivity Sheet Piling S

Sheet piling involves installing interlocking steel sheets into the ground to retain or hold back soil, sand, or water. There are several methods for installing sheet piling including driving them in using impact hammers or vibro hammers, pressing them into place using a silent piler machine, or pre-drilling or pre-augering the soil to facilitate installation. Proper installation techniques involve starting from the ends and working toward the middle, staggering seams between sheets, and using guide beams and corner piles to ensure proper alignment. Factors like soil conditions, sheet pile type and size, and hammer type influence installability and required equipment.

Uploaded by

roldski
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 14

Sheet Piling

Page 1 of 14

GENERAL SHEET PILING CONSTRUCTION PRACTICE


(Based on Marina Barrage Project experience) 1) Usually from 2 ends moving towards the middle to avoid pile tilting (creeping); 2) Set a stretch of pile panel, say 10m long; or within natural 2 corner piles; 3-1) On land: within the working stretch, lay guide beam ('I" beam); 3-2) On sea: install king post, "I" cross beam and guide beams ("I" beam). Also install access using "I" beam by the side of guide beam; 4) Drive the 1st layer of sheet piles to the ground level (welding seams shall be staggered during fabrication); 5) Alternate pitching the 2nd tier sheet piles and join them to the 1st tier by welding; 6) Alternate drive the 2nd tier sheet piles; 7) Repeat the procedure 4-6. NOTE: 1) Purpose of alternate driving: - Staggering welding point of neighbouring piles; - Avoid pile tilting (creeping). 2) Corner piles are special made for turning and joint. 3) 12 ton for a pair, 8 ton for single sheet piles. 4) There is relationship among sheet pile depth, soil condition, type of sheet pile used (III, IV, or VI) and type of hammer to be used (hydraulic or vibro, and the weight). Generally, the harder of the soil, the deeper of the penetration, the bigger and thicker size of sheet pile, the more heavy-duty hammer is required. 5) When the depth goes deeper, the resistance from the friction of the sheet pile is getting bigger and this friction prevails the soil resistance. 6) Generally, the bigger size of sheet pile can go deeper. Also, the pipe (eg. dia=600mm) can go deeper than sheet pile. 7) Sheet piles tend to be easy to be extracted later when the vibro is used instead of hydraulic hammer.

SHEET PILE FABRICATION AND TESTING (Based on Marina Barrage Project experience)

http://www.p3planningengineer.com/productivity/sheet%20piling/sheet%20piling.htm

12/11/2012

Sheet Piling

Page 2 of 14

Close view of the sheet pile spicing

Welding of splicing

http://www.p3planningengineer.com/productivity/sheet%20piling/sheet%20piling.htm

12/11/2012

Sheet Piling

Page 3 of 14

MPI test (Magnetic Particle Inspection) for the welding joint

DRIVING-IN METHOD
(Based on Marina Barrage Project experience)

http://www.p3planningengineer.com/productivity/sheet%20piling/sheet%20piling.htm

12/11/2012

Sheet Piling

Page 4 of 14

Impact Hammer Driving: A 7-ton hydraulic hammer

http://www.p3planningengineer.com/productivity/sheet%20piling/sheet%20piling.htm

12/11/2012

Sheet Piling

Page 5 of 14

Vibro-driving: A 12-ton vibro hammer

Vibro-driving: Power pack for vibro hammer

http://www.p3planningengineer.com/productivity/sheet%20piling/sheet%20piling.htm

12/11/2012

Sheet Piling

Page 6 of 14

PRESS-IN METHOD (SILENT PILER)


(Extracted from the Oriental-Arcelor and Giken catalogues (2006))

Press-in principle

http://www.p3planningengineer.com/productivity/sheet%20piling/sheet%20piling.htm

12/11/2012

Sheet Piling

Page 7 of 14

Machine layout plan for typical silent piling

Machine layout elevation for typical silent piling

http://www.p3planningengineer.com/productivity/sheet%20piling/sheet%20piling.htm

12/11/2012

Sheet Piling

Page 8 of 14

Silent piler for sheet piles

Driving Aids in Hard Soil:


- Pre-augering; - Water jet; - Pre-drilling

http://www.p3planningengineer.com/productivity/sheet%20piling/sheet%20piling.htm

12/11/2012

Sheet Piling

Page 9 of 14

Pre-augering

Left: Water jet; Right: Pre-drilling

http://www.p3planningengineer.com/productivity/sheet%20piling/sheet%20piling.htm

12/11/2012

Sheet Piling

Page 10 of 14

DRIVING GUIDE AND CORNER PILES


(Based on Marina Barrage Project experience)

Lay guide beams before installation of sheet piles

http://www.p3planningengineer.com/productivity/sheet%20piling/sheet%20piling.htm

12/11/2012

Sheet Piling

Page 11 of 14

Corner pile

NORMAL DRIVING METHODS


- Pitch and drive; - Panel driving; - Staggered driving; - Combination

Panel Driving Method - A Recommended Driving Method (Extracted from the Oriental-Arcelor (2006))

http://www.p3planningengineer.com/productivity/sheet%20piling/sheet%20piling.htm

12/11/2012

Sheet Piling

Page 12 of 14

----------------------------------------------------------------------------------------------------------

http://www.p3planningengineer.com/productivity/sheet%20piling/sheet%20piling.htm

12/11/2012

Sheet Piling

Page 13 of 14

DRIVABILITY
(Extracted from the Oriental-Arcelor (2006))

http://www.p3planningengineer.com/productivity/sheet%20piling/sheet%20piling.htm

12/11/2012

Sheet Piling

Page 14 of 14

CROSS REFERENCE Land sheet piling production rate Marine sheet piling production rate