Safety - Permit To Dig: PART A: To Be Completed For ALL Operations Involving Breaking Ground
Safety - Permit To Dig: PART A: To Be Completed For ALL Operations Involving Breaking Ground
Project Name:
Permit Number
PART A: To be completed for ALL operations involving breaking ground Are there known/charted services in the location? (Tick)
If there are no services indicated (within the proposed are of dig) on an statutory drawings or topographical GPR survey, and the area has been CAT scanned and proved clear, then mechanical excavation can proceed, persons to be kept clear of machine bucket at all times Go to part B Have all known services been traced and marked out on the ground?
Yes
No
If Electricity, gas or unknown services are present then trial holes MUST be dug using safe techniques (No breakers or mechanical equipment) and marked on the drawings to prove exact depth, location and direction. Have trial holes been done prior to this permit?
Yes
No
All known/charted services must be shown on the attached sketch(s) or relevant survey drawing, clearly stating the trial hole locations where required (Gas, Electricity, Unknown) Additional comments and notes:
(Specify details of equipment to be used to safely expose and identify any service
PART A: Completed by Authorised Person If Electricity and or gas are located in the area then a nominated supervisor MUST be in place until the service is safely located by hand. Supervision?
Yes
No
If electricity or Gas is found to be encased in concrete the service MUST be diverted or isolated before commencing with the excavation works. If the service is not diverted or isolated then confirmation to proceed with mechanical methods MUST be received from the most senior manager on site. Authorised Person: _______________________________________ Date: _________________ Supervisor: _____________________________________________ Date: _________________ A copy of this permit must be kept with the supervisor of the activity at the workface
Page 1 of 4
A J Burgess 2010
Have all known/charted services, been safely located, Yes exposed and identified by trial holes? Has Electricity and or Gas been identified as present Yes in the area of dig or within 500mm of? If Yes, they MUST be fully exposed safely before commencing with mechanical means. Notes/Comments:
No Services Identified No No
Yes
Excavation by mechanical means may only proceed if: If known services within the immediate area of the proposed dig have been fully exposed by safe techniques under direct supervision OR There are no identified services shown on the survey drawing and nothing has been located with a CAT & Genny within 500mm either side of the proposed excavation line. PART B: Approval to Proceed Signed: _________________________________________________ Date: ____________________ Valid from: ________________________________ Valid until: _______________________________ PART B: Accepted by (Supervisor) Signed: _________________________________________________ Date: ____________________ Confirming that contents of permit have been understood and the following operatives briefed on control measures
The excavation has been completed and left in a safe condition/superseded by another permit
Work must be suspended if services are damaged and reported immediately to Management A copy of this permit must be kept with the machine operator involved in the proposed activity.
Page 2 of 4
A J Burgess 2010
Page 3 of 4
A J Burgess 2010
Page 4 of 4
A J Burgess 2010