0% found this document useful (0 votes)
831 views

Boq

The document is an itemized list and cost estimate for renovations including tiling, plastering, painting and other finishes for both the ground floor and first floor of a building. It includes removing and replacing existing materials, providing new materials, and labor costs for various areas of the building being renovated. The costs are broken down into line items with quantities, units, rates and totals provided for each task and material.

Uploaded by

Dilon Fernando
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
831 views

Boq

The document is an itemized list and cost estimate for renovations including tiling, plastering, painting and other finishes for both the ground floor and first floor of a building. It includes removing and replacing existing materials, providing new materials, and labor costs for various areas of the building being renovated. The costs are broken down into line items with quantities, units, rates and totals provided for each task and material.

Uploaded by

Dilon Fernando
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 5

Ref.

NO
1

Description of Items Tiling Tiling in the ground floor living area ( Labour wages )

Unit

Quanti ty

Rate (Rs)

Amount(R s)

1.1

1.1.1 1.1.2 1.1.3 1.1.4 1.1.5 1.1.6 1.1.6. 1 1.1.6. 2 1.1.6. 3 1.1.6. 4 1.2

Removing existing tiling and underneath layers Placing bottom concrete layer Placing tiling bed Tiling Skirting Material for Tiling Tiles cement Sand " metal for bottom concrete Tiling in the ground floor car porch area( Labour wages ) Removing existing tiling and underneath layers Placing bottom concrete layer Placing tiling bed Tiling Skirting Material for Tiling Tiles

ft2 ft2 ft2 ft2 ft

no bag cube cube

1.2.1 1.2.2 1.2.3 1.2.4 1.2.5 1.2.6 1.2.6. 1

ft2 ft2 ft2 ft2 ft

no

1.2.6. 2 1.2.6. 3 1.2.6 .4

cement Sand " metal for bottom concrete Tiling in the first floor bed room area ( Labour wages )

bag cube cube

1.3

1.3.1 1.3.2 1.3.3 1.3.4 1.3.5 1.3.5 .1 1.3.5 .2 1.3.5 .3 2

Removing existing tiling and underneath layers Placing tiling bed Tiling Skirting Material for Tiling Tiles cement Sand Plastering Plastering of the cracked walls in the Ground floor Car porch area(Labour wages ) removing existing plaster, plastering new layer, rough finishing included

ft2 ft2 ft2 ft

no bag cube

2.1

2.1.1 Wall 1 2.1.2 Wall 2 Plastering of the cracked walls in the Ground floor Living area(Labour wages ) removing existing plaster, plastering new layer, smooth finishing included

ft2 ft2

2.2

2.2.1 Wall 1 2.2.2 Wall 2 2.2.3 Wall 3 2.2.4 Wall 4 2.2.5 Wall 5 Plastering of the cracked walls in the First floor Balcony area(Labour wages) removing existing plaster, plastering new layer, rough finishing included

ft2 ft2 ft2 ft2 ft2

2.3

2.3.1 Wall 1 2.3.2 Wall 2 2.3.3 Wall 3 Plastering of the cracked walls in the First floor Bed room area( Labour wages ) removing existing plaster, plastering new layer, smooth finishing included

ft2 ft2 ft2

2.4

2.4.1 Wall 1 2.4.2 Wall 2 2.4.3 Wall 3 2.4.4 Wall 4 2.4.5 Wall 5 2.4.6 Wall 6 Plastering of the cracked walls in the First floor Living area( Labour wages) removing existing plaster, plastering new layer, smooth finishing included

ft2 ft2 ft2 ft2 ft2 ft2

2.5

2.5.1 Wall 1 2.5.2 Wall 2 2.5.3 Wall 3

ft2 ft2 ft2

2.5.4 Wall 4 2.5.5 Wall 5 2.5.6 Wall 6 2.5.7 Wall 7 Plastering of the cracked walls in the First floor store room area( Labour wages ) removing existing plaster, plastering new layer, smooth finishing included

ft2 ft2 ft2 ft2

2.6

2.6.1 Wall 1 2.6.2 Wall 2 2.7 Material for Plastering

ft2 ft2

2.7.1 cement 2.7.2 Sand 2.7.3 Steel mesh 3 3.1 Finishes & Painting Rectified walls in ground floor(Labour wages )

bag cube ft

3.1.1 External Walls 3.1.2 Internal Walls 3.2 Rectified walls in first floor ( Labour wages )

ft2 ft2

3.2.1 External Walls 3.2.2 Internal Walls 3.3 3.3.1 Material for Finishes & Painting Wall Putty

ft2 ft2

bucke t bucke t bucke t

3.3.2 Filler 3.3.3 Interior Paint

3.3.4 Exterior Paint 4 4.1 Other expenses Transportation

bucke t