0% found this document useful (3 votes)
2K views

An Intro To Operations Management Questions

This document contains homework questions about two case studies: a taco truck and Sarah's Organic Soap Company. For the taco truck case, students are asked to calculate the process capacity if batch size is 4 orders and determine the optimal batch size. For the soap company case, students are asked to calculate the total setup time for one production run and determine how much "regular" soap should be produced before switching scents. The document provides relevant details about the processes at each company to answer the questions.

Uploaded by

jigar_3008
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (3 votes)
2K views

An Intro To Operations Management Questions

This document contains homework questions about two case studies: a taco truck and Sarah's Organic Soap Company. For the taco truck case, students are asked to calculate the process capacity if batch size is 4 orders and determine the optimal batch size. For the soap company case, students are asked to calculate the total setup time for one production run and determine how much "regular" soap should be produced before switching scents. The document provides relevant details about the processes at each company to answer the questions.

Uploaded by

jigar_3008
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Module

3 Homework Questions Please submit your answers to these homework questions via the Coursera website. Taco Truck A food truck serves customers during lunch hour by taking orders and making fresh tacos. There is only one choice during lunch hour, since the objective is to maximize the number of customers served. The taco cooking works in this manner. First, a batch of orders is cooked on a grill by one person. The cooking depends upon the number of orders in the batch and takes a little more time if more orders are in a batch. The time taken to cook just one order is 10 minutes. For each additional order, it takes one minute more. Thus, cooking two orders in a batch takes 11 minutes, cooking three orders takes 12 minutes, and so on. The other person in the process is accepting payments. It takes 2 minutes to receive the payment (one payment for each order). Assume each order corresponds to one taco. TT1. What is the process capacity if Taco Trucks batch size is 4 orders (in orders per minute)? TT2. Calculate the batch size (in orders) at Taco Truck that will maximize the overall flow rate without causing the customers to wait unnecessarily. Sarahs Organic Soap Company Sarahs Organic Soap Company makes four kinds of organic liquid soap: regular, lavender, citrus, and tea tree. Demand for the four scents are 150, 120, 75, and 50 kilograms per hour, respectively. Sarahs production process can produce any soap at the rate of 450 kgs per hour, but 1.5 hours are needed to switch between scents. During those switchover times, the process doesnt produce any soap. Sarah wants to choose a production schedule that (i) cycles repeatedly through the four scents, (ii) meets the required demand, and (iii) minimizes the amount of inventory held. SOSC1. How much total set-up time (in hours) will Sarah incur in one production run (production cycle)? SOSC2. How many kgs of regular soap should Sarah produce before switching over to another scent?

Pooling P1. Which of the following actions will provide you with the biggest pooling benefits? a. Pooling two negatively correlated demand streams b. Pooling two independent demand streams c. Pooling two positively correlated demand streams

You might also like