This document provides an estimated cost breakdown for the proposed construction of an office shed and working shed at Pudussery West Village in Palakkad District, Kerala, India. The total estimated cost is Rs. 430000 (approx. $5700 USD). The cost estimate includes items like excavation, masonry, brickwork, doors, flooring, roofing, electrical work, painting, and unforeseen costs. The office shed is estimated to cost Rs. 280000 and the working shed Rs. 150000.

Uploaded by

MahaManthra
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
93 views

Estimate

This document provides an estimated cost breakdown for the proposed construction of an office shed and working shed at Pudussery West Village in Palakkad District, Kerala, India. The total estimated cost is Rs. 430000 (approx. $5700 USD). The cost estimate includes items like excavation, masonry, brickwork, doors, flooring, roofing, electrical work, painting, and unforeseen costs. The office shed is estimated to cost Rs. 280000 and the working shed Rs. 150000.

Uploaded by

MahaManthra
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

ABSTRACT AND DETAILED ESTIMATED COST OF THE PROPOSED CONSTRUCTION OF A

WORKING SHED CUM FFICE SHED AT

PUDUSSERY WEST VILLAGE RS. NO 218 WARD NO 24


IN

BLOCK NO 36, PUDUSSERY PANCHAYATH Owner Mahalingam, S/o Subhayyan Surabhi Nagar, Pudussery, Palakkad OFFICE SHED SL Description of work Amount No 1 2 Site Cleaning & Leveling Earth work excavation in hard soil lift up to 1.5 m with initial lead 50m etc complete No mts

PALAKKAD DISTRICT

Length Breadth Height mts mts L.S

Quantity

1000.00

19.74

0.75

0.75

11.10

Say 12 m3 @ Rs. 100/m3 3. RR Masonry in CM 1:8 for foundation and basements including all charges of material & labour charges etc complete 1st Footing Basement 1 1 19.74 19.74 0.75 0.45 0.75 0.45 11.10 3.99 15.09

1200.00

Say 15 m3 @ Rs. 1200/m3 4 Brick work M.C.M. 1:6 for superstructure using 1st class country burnt bricks with all charges of material & labour

18000.00

19.74

0.24

2.70

12.80

Deduction Door - D Window 2 2 1.00 1.00 0.24 0.24 2.10 1.35 1.00 0.65 1.65 Deduction = 12.80 1.65 = 11.15 Net total less deduction Say 12.00 m3 @ Rs. 2700/m3 5. Supplying and fixing of doors Using country wood frames Wooden paneled shutters including All charges Door 2 7500 Window 2 5500 32400.00

15000.00 11000.00 26000.00

Flooring with CC 1:4:8 using 40 mm broken stone with mortar finish in CM 1:5 20 mm thick including all cost of materials labor charges curing etc Room 1 1 Room 2 1

2.40 2.70

2.70 2.70

6.48 7.29 13.77

Say 14 m3 @ Rs 800/m3 7 Roofing with A/C roofing Sheet supporting with MS Pipe fabrication including all Cost of materials and labour Charges etc complete

11200.00

7.02

3.78

26.53 16200.00 7000.00 5000.00 3000.00

Say 27 m2 @ Rs 600/m2 8 9 10 Electrical installation and fittings White washing and painting Unforeseen items if any Total

150000.00

WORKING SHED 1. Earth work 1 60 0.75 0.75 33.75 9180.00

Say as 34 m2 @ Rs. 270/ m2 2 RR Masonry in CM 1:8 for foundation and basements including all charges of material & labour charges etc complete RR Masonry 1 1

60 60

0.75 0.50

0.75 0.50

33.75 15.00 48.75

Say as 49 m2 @ Rs. 1200/ m2 3. Bed concrete with solid rubble Stone with CC 1:4:8 using 40mm Broken stone including all costs of Materials and labour charges etc Complete 1

58800.00

20.00

10.00

200 48000.00

Say 200 m2 @ Rs. 2400/10m2 4 Roofing with GI roofing Sheet supporting with MS Pipe fabrication including all Cost of materials and labour Charges etc complete Say 240m2 @ Rs 600/m2 5 6 Electrical installation and fittings Unforeseen items if any Total Total Office shed Working shed Total

14400.00 15000.00 5020.00 280000.00

150000.00 280000.00 430000.00