0% found this document useful (0 votes)
129 views

Softwen Project

The document outlines the deliverables, grading, and deadlines for a software documentation project, including chapter outlines, system specifications, and defense requirements. Key deliverables include project proposals, documentation chapters, specifications, and a running software system. Students will be graded on partial deliverables, documentation, presentation, and a software demonstration defense.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
129 views

Softwen Project

The document outlines the deliverables, grading, and deadlines for a software documentation project, including chapter outlines, system specifications, and defense requirements. Key deliverables include project proposals, documentation chapters, specifications, and a running software system. Students will be graded on partial deliverables, documentation, presentation, and a software demonstration defense.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Documentation Outline: Types: 1. Payroll 2. Library 3. Enrollment 4. Accounting 5. Patient information and billing 6. Others DELIVERABLES: 1.

Project proposal 2. Chapter 1 & 2 3. Chapter 3 & 4 4. Chapter 5 to 7 5. Chapter 8 6. Process specifications and data specification 7. Screen/Interface specification 8. Program/Module specification 9. Chapter 10 DEFENCE DELIVERABLES 1. Project Documentation 2. Running System/Software DEFENCE: Final Documentation GRADING SYSTEM: Partial deliverables Defense -Documentation -Presentation -Mini Software Defense 10/01/13, 10/03/13, 10/08/13, 10/11/13 10/17/13 SUBJECT GRADE: DATES 7/09/13 7/18/13 7/25/13 8/01/13 8/15/13 8/22/13 8/29/13 9/05/13 9/12/13 9/26/13

30% 70% (40%) (20%) (40%)


100%

- Lecture grade -Project grade

60% 40%

NOTE: 1. Groupings (2 to 4 members) 2. Partial deliverables are due on or before 5:00pm of the specified deadline. 3. Defense deliverables are due on before 1:00pm of the specified deadline.

Documentation Outline: a. Late deliverables 1:01pm to 6pm will be 10points deduction. b. Deliverables submitted from 6:01pm onwards will not be accepted and would mean a FAILED grade for the project. 4. Non-appearance on defense, with in 20MINS = FAILED. 5. Running System must be in executable format (installer) placed on a CD. 6. Final documentation - ON OR BEFORE 6PM on specified deadline.

Documentation Outline: Title page Table of contents List of tables List of figures List of appendices Acknowledgement

1.0 Introduction

1.1 background of the study 1.2 statement of the problem 1.3 objectives of the study 1.3.1 General Objectives 1.3.2 Specific Objectives 1.4 Significance of the study
2.0 Methodology of the study (SE Paradigm) 3.0 Data Gathering Procedures and Outputs (Define requirement of the software) 4.0 Documentation of the current system 5.0 Software/project estimation

5.1 Schedule of the activity 5.2 Cost Estimation


6.0 Requirement analysis Specification (Model system requirement)

6.1 Process Specification/Modeling 6.2 Data/specification/modeling


7.0 Software design specification

7.1 7.2 7.3 7.4

Process specification Data specification Screen/interface specification Program/Module Specification

8.0 Software Implementation

8.1 Programming Consideration Issues and Tools 8.2 System Requirements Specification 8.2.1 Hardware Requirements 8.2.2 Software Requirements

Documentation Outline:

8.2.3 Human Resource Requirements 8.3 Software Testing 8.3.1 Testing Activities 8.3.2 Test Codes 8.4 Installation Process
9.0 Software Maintenance Plan Appendices Bibliography Resource Person

You might also like