Partial Discharge Monitoring On Rotating Machines Using A Modular Instrument Approach
Partial Discharge Monitoring On Rotating Machines Using A Modular Instrument Approach
Detlev W. Gross Power Diagnostix Systems GmbH Bruesseler Ring 95a, 52074 Aachen, Germany [email protected]
Power Diagnostix www.pdix.com
JJ Walker Walmet Technologies (Pty) Ltd 47 Kei Street East, Three Rivers, Vereeniging, South Africa [email protected]
1
16 x 64
4
Symmetrical Electrode Configuration - Multiple Voids of different Sizes -Void and Surface Discharge
Power Diagnostix www.pdix.com
LH Marthinusen Rotating Machines Conference, 2008
Asymmetrical Electrode Configuration - Predominantly in the negative Half Cycle - Often typical triangular Pattern - Slot Discharge versus Load Variation
Power Diagnostix www.pdix.com
LH Marthinusen Rotating Machines Conference, 2008
Symmetrical Electrode Configuration - Similar Pattern for both Half Cycles - Often typical triangular Pattern - Cross-coupling of adjacent Phase
Power Diagnostix www.pdix.com
LH Marthinusen Rotating Machines Conference, 2008
Non-symmetrical Electrode Configuration - Predominantly in the positive Half Cycles - Hydro Generator (Pump Storage) - Insulation De-Composites (White Powder)
Power Diagnostix www.pdix.com
LH Marthinusen Rotating Machines Conference, 2008
Defect Mechanism with global Vacuum Impregnation - Thermal Stress causes Cracks - Initial State: Surface Discharge - Discharge Level: 10-50nC - Gap Grows
Power Diagnostix www.pdix.com
LH Marthinusen Rotating Machines Conference, 2008
10
Cont
- Discharge to the Pressure Finger - Final Stage: Floating Potential - Strong Streamer Discharge > 100nC
Power Diagnostix www.pdix.com
LH Marthinusen Rotating Machines Conference, 2008
11
Case Study
B A
Defect Mechanism with global Vacuum Impregnation - Initial Stage: A (Inception Voltage ~ 2kV) - Final Stage: B (Inception Voltage ~ 5kV) - Strong Streamer Discharge > 100nC
Power Diagnostix www.pdix.com
LH Marthinusen Rotating Machines Conference, 2008
12
13
14
15
16
17
Gas Turbine, Seabank, Bristol, UK 32MVA Hydro Pipe Turbine, Vienna, Austria
18
19
G1
G2
G3
G4
Independent Scanning Local Storage Remote Mirror Storage External FTP Access
20
G1
G2
G3
G4
Site 1
Site 2
21
22
23
ICMpilot Software
monitor pilot monitor ICM ICM ICM S/W S/W - remote trending phase-resolved measurement acquiredpattern data
Power Diagnostix www.pdix.com
LH Marthinusen Rotating Machines Conference, 2008
24
25
Thank You!