0% found this document useful (0 votes)
32 views9 pages

State Load Dispatch Center, Airoli: Daily System Report

The document provides daily system report data for the Maharashtra State Electricity Transmission Company Ltd. (MSETCL) for June 24, 2013. Key details include total daily generation by source which was 215.6 million units for the state. Peak demand for the state was 15,203 MW in the morning at 11:00 hours and 14,256 MW in the evening at 20:00 hours. Frequency levels remained stable between 49.55-50.37 Hz throughout the day.

Uploaded by

Tuku Singh
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views9 pages

State Load Dispatch Center, Airoli: Daily System Report

The document provides daily system report data for the Maharashtra State Electricity Transmission Company Ltd. (MSETCL) for June 24, 2013. Key details include total daily generation by source which was 215.6 million units for the state. Peak demand for the state was 15,203 MW in the morning at 11:00 hours and 14,256 MW in the evening at 20:00 hours. Frequency levels remained stable between 49.55-50.37 Hz throughout the day.

Uploaded by

Tuku Singh
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

Maharashtra State Electricity Transmission

Company Ltd.

State Load Dispatch Center,


Airoli
Daily system Report
for
24/Jun/2013

0 of 8

State Load Dispatch Center,Airoli (MSETCL)


Daily system Report for 24/Jun/2013 MONDAY
GENERATION (MUs)
II
EXCHANGES (MUs)

I
A) MSGENCO

Daily

Monthly

1) Thermal
2) Hydro
3) Gas
Total MSGENCO
B) 1) JSW JAIGAD
2) WPCL
3) ADANI
4) Other CPP / IPP
5) Wind Generation
6) PENCH (MS)
C) TPCL & REL

78.772
5.360
9.723
93.855
19.104
7.724
27.160
6.272
24.992
0.324

1) TPCL Thermal
2) TPCL Hydro
TOTAL TPCL
3) REL Thermal

18.330
6.384
24.714
11.455

E) Central Sector

2056.972
165.481
228.172
2450.625
564.493
190.968
529.070
243.488
453.627
5.444

Daily

1) Gujrat
2) Madhya Pradesh
3) Chattisgarh
4) Maharashtra
5) Goa
6) TAPS 1&2 Injection
7) RGPPL Injection
8) Pench (Excess)

# Total Cent. Sector


F) Other Exchanges
1) With TPCL (Excess)
536.534 G) Bilateral Power *
117.800 1) MSEDCL Bilateral
Include PX
654.334
2)
MUMBAI
Bilateral
272.765
Include PX
3) MUMBAI Schedule

D) STATE
1) Thermal

(A1+C1+C3)

2) Hydro
3) Gas
4) Wind
5) CPP

(A2+B5+C2)
(A3)
(B4)
(B1+B2+B3)

TOTAL STATE

108.557
12.068
9.723
24.992
60.260
215.600

2866.271
288.725
228.172
453.627
1026.109
4862.904

Monthly

16.600
16.814
9.290
61.123
-5.339
3.690
1.336
-0.324

175.628
423.394
225.650
1470.880
-131.662
85.896
73.313
-5.444

103.190

2317.655

-19.166

-402.144

40.964
0.000
16.985
4.140
16.985

852.536
-26.629
351.968
28.871
351.968

263.455

6353.226

36.227

870.314

19.105

458.839

318.787

7682.379

H) ENERGY CATERED (MUs)


1) MSEDCL
2) TPCL
3) REL
TOTAL STATE

DETAILS OF MAHARASHTRA STATE PEAK DEMAND(MW)


PARTICULARS
MSGENCO Thermal
MSGENCO Hydro
MSGENCO Gas
MSGENCO Total Generation
Central Sector Receipt
WIND
CPP / IPP
Exchange with Mumbai
MSEDCL DEMAND MET
Load Shedding
MSEDCL DEMAND
TPCL GENERATION
R-INFRA GENERATION
TPCL+R-INFRA DEMAND
STATE DEMAND MET
STATE DEMAND
Frequency (Hz)

A. Morning Peak at 11
Hrs
3239
556
404
4199
4989
1067
2639
-990
11904
432
12336
1352
525
2867
14771
15203
50.03

B. Evening Peak at 20
Hrs
3369
392
389
4150
4496
1050
2568
-697
11590
90
11680
1356
523
2576
14166
14256
49.96

C. Night Minimum at 3
Hrs
3374
76
403
3853
3734
1040
2435
-664
10398
65
10463
600
399
1663
12061
12126
49.95

FREQUENCY PARTICULARS
MAXIMUM FREQ.

MINIMUM FREQ.

50.37 Hz at 16.05 Hrs 49.55 Hz at 08.40 Hrs

AVERAGE FREQ.

FREQ. BELOW 49.2 Hz

49.99

0 % of Time(min)

* Displayed for information, not added in total. # Total Cent. Sector includes MSEDCL and TPCL bilateral power.

Shift Engineer

Shift Incharge
1 of 8

State Load Dispatch Center,Airoli (MSETCL)


Daily and Progressive Generation,Maximum,Minimum,OLC Details for 24/Jun/2013
Generating
unit

Generation
Daily
(Mus)

Monthly Max
(Mus) (MW)

Min
(MW)

OLC
(MW)

Koradi

Generating
unit
Total

Unit 5
Unit 6
Unit 7

0.00
0.00
3.39

17.31
55.68
54.30

Total

3.39

127.28

Unit 2
Unit 3
Unit 4
Unit 5

0.05
3.29
3.58
3.24

27.91
63.33
62.90
80.42

Total

10.16

234.56

Unit 3
Unit 4
Unit 5
Unit 6
Unit 7

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

Total

0.00

0.00

Unit 1
Unit 2
Unit 3
Unit 4
Unit 5
Unit 6
Unit 7

3.18
3.40
3.64
0.00
5.72
5.40
5.72

79.96
82.81
92.08
48.49
156.95
182.64
180.23

Total

27.07

823.18

Unit 3
Unit 4

4.59
4.71

117.42
108.97

Total

9.30

226.39

Unit 1
Unit 2
Unit 3
Unit 4
Unit 5

3.14
3.12
3.34
0.00
6.62

62.93
80.47
90.61
1.62
133.72

Total

16.22

369.35

Unit 3
Unit 4
Unit 5

4.24
4.17
4.24

98.31
90.74
87.18

Total

12.64

276.22

0
0
170

0
0
120

0
0
140
140

Bhusawal

25
150
190
215

0
130
125
75

0
160
140
0
300

Parli

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0
0

Chandrapur

140
150
181
0
280
245
265

112
130
117
0
195
210
225

150
150
180
0
250
235
250
1215

Paras

214
220

180
181

80
90
107
0
223

2.80

98.03

KDPH
VTRNA
TILLARI
BHTGR/VEER
BHIRA T.R.
RNGR+BHTSA
BHANDARDRA
ELDARY
SMLHY_PTN
GHATGHAR

0.00
0.00
0.24
0.00
0.49
0.00
0.67
0.00
0.07
1.09

1.63
14.78
4.51
0.00
8.62
2.82
3.34
0.00
4.10
27.65

Total

2.56

67.45

1.07
1.80
0.26
0.67
7.71
0.61
0.12
0.29
3.34
5.83
0.73
0.60
1.05
0.91

17.99
34.00
4.65
12.45
134.46
11.42
2.41
5.54
66.07
103.05
14.39
10.22
21.52
15.47

24.99

453.63

MalharPeth
Vankuswadi
ATIT
Kale
Satara
Shirala
K Mahankal
Supa
Vita
Dondaicha
Sakri
Nandurbar
Khandke
Khaparale

19.10
7.72
27.16
6.27

564.49
190.97
529.07
243.49

Total

60.26

1528.02

0.00
3.79
4.84
2.94
1.62
5.14
6.38

0.00
195.80
105.89
69.01
38.47
127.37
117.80

24.71

654.33

1&2

11.46

272.76

Total

11.46

272.76

195
180
195
570

All Units

9.72

228.17

Total

9.72

228.17

437

389

420
420

PENCH (MS)

Pench (MS)

0.32

5.44

Total

0.32

5.44

26

1.67
0.00
1.13

50.55
21.40
26.08

Koyna 12&4 Total

1.67

71.94

300
0
208

35
0
0

0
0
60
0
80
0
28
0
3
250

0
0
0
0
0
0
28
0
3
0

0
0
60
0
80
0
28
0
0
0
168

828
333
1230

730
310
850

735
340
1234
2309

Tata

Trombay 4
Trombay 5
Trombay 6
Trombay 7A
Trombay 7B
Trombay 8
TATA Hydro

0
436
467
126
69
253
459

0
0
148
112
64
186
72

0
0
500
120
60
250
447
1377

REL

528

399

500
500

Cent_Sect

Koyna

Stage 1-2
Stage 4
Stage 3

1090

CPP

Total

Uran

OLC
(MW)

Wind

JSW_JAIGAD
WARDHA
Adani
Other_CPPs

160
160
160
0
350

Min
(MW)

Hydro

420

830
165
161
165

Monthly Max
(Mus) (MW)

Total

Nasik

195
180
193

Daily
(Mus)

210
210

Khaparkheda

150
160
155
0
350

Generation

Share

4893

Total

4893

600
250
240
850

Thermal
Thml+Gas
Hydro
Total
State Total
MS
PG
CL

78.77
88.50
5.36
93.86
215.60

2056.97
2285.14
165.48
2450.62
4862.90

3475
3895
1258
5153
14232

2 of 8

State Load Dispatch Center,Airoli (MSETCL)


Hourly Load Data As on 24/Jun/2013

TIME MSPGCL GEN.


Mum. MSEDCL LOAD
CPP /
CS
CS Mum.S
SR.
TOTAL WIND
NET DEMAND SHEDDI
IPP SHARE RECPT CH.
NO. THM HY GAS
EXCH.
MET
NG

MSEDCL
DEMAND
WITH LS

TPCL + R
STATE FREQ.
-INFRA
DEMAND (Hz)
DEMAND

1 3471

113

399

3983

1054

2553

4014

3973

-531

-719

10854

95

10949

1933

12882

49.95

2 3395

71

402

3868

992

2569

3974

3948

-475

-760

10620

64

10684

1762

12446

50.08

3 3374

76

403

3853

1040

2435

3963

3734

-475

-664

10398

65

10463

1663

12126

49.95

4 3291

71

403

3765

1091

2185

3593

4122

-458

-583

10580

65

10645

1593

12238

50.04

5 3288

116

403

3807

1061

2162

3536

4036

-458

-572

10494

65

10559

1592

12151

49.99

6 3261

331

405

3997

971

2435

3769

3856

-462

-575

10684

118

10802

1693

12495

49.89

7 3284

86

407

3777

951

2599

3955

4067

-471

-561

10849

217

11066

1845

12911

50.01

8 3294

208

410

3912

897

2606

3953

4008

-468

-597

10849

478

11327

2002

13329

49.94

9 3321

254

411

3986

1028

2617

3988

3959

-527

-676

10940

657

11597

2292

13889

49.80

10 3315

605

411

4331

1167

2684

4294

4456

-832

-854

11787

485

12272

2623

14895

49.87

11 3239

556

404

4199

1067

2639

4533

4989

-1065

-990

11904

432

12336

2867

15203

50.03

12 3126

542

401

4069

1169

2687

4593

4622

-1142

-930

11617

521

12138

2917

15055

49.94

13 3152

263

393

3808

1144

2650

4584

4436

-1115

-966

11095

650

11745

2875

14620

49.93

14 3203

81

404

3688

984

2651

4479

4537

-992

-1031

10852

552

11404

2800

14204

49.99

15 3237

71

405

3713

928

2603

4396

4652

-885

-959

10960

443

11403

2731

14134

49.99

16 3230

71

403

3704

1043

2615

4418

4661

-855

-894

11153

381

11534

2685

14219

50.10

17 3182

81

403

3666

1079

2544

4415

4503

-856

-1010

10792

334

11126

2684

13810

50.08

18 3281

71

397

3749

1077

2572

4212

4336

-705

-1051

10706

132

10838

2577

13415

50.08

19 3343

146

395

3884

1089

2554

4100

4510

-639

-885

11175

96

11271

2559

13830

50.08

20 3369

392

389

4150

1050

2568

4380

4496

-780

-697

11590

90

11680

2576

14256

49.96

21 3332

539

410

4281

1091

2581

4577

4471

-710

-756

11691

87

11778

2453

14231

49.96

22 3327

244

411

3982

1020

2397

4522

4395

-714

-871

10947

84

11031

2320

13351

50.04

23 3285

211

417

3913

1052

2181

4505

4333

-714

-812

10687

82

10769

2220

12989

50.03

24 3172

161

437

3770

947

2173

4225

4090

-655

-753

10231

71

10302

2073

12375

50.01

MUs 78.77

5.36

9.72

93.86

100.98 103.19 -16.98 -19.17

263.46

6.26

269.72

55.34

325.05

49.99

24.99 60.26

NOTE : ALL VALUES IN MW


Mumbai Sch./Net Exch is shown with reference to MSETCL System. (+) indicates Mum. to MSETCL and (-) indicates
MSETCL to Mum. Mumbai Schedule is calculated for MSETCL periphery (taking 4% loss for import & 4.85% MSETCL loss

# Without Applying Load Diversity Factor

3 of 8

State Load Dispatch Center,Airoli (MSETCL)


Details of Generating Unit Outages/Trippings for 24/Jun/2013
Position as on 6.30 Hrs of 25/Jun/2013
Name of Generating
Unit

Capacity

Tripped
Date

Trippe
Sync.Date
d Time

Sync.
Time

Expected
Date

Parli Unit 4

210

28/11/2012

02.37

Continued. water shortage.

Cent_Sect Tarapur 2

160

31/12/2012

17.05

Continued. Refuelling work

250

25/01/2013

19.49

Continued.

Parli Unit 3

210

13/02/2013

23.50

Continued. Water Shortage

Parli Unit 5

210

14/02/2013

22.45

Continued. Water Shortage

Parli Unit 7

250

17/02/2013

01.00

Continued. Water Shortage.

Khaparkheda Unit 4

210

01/06/2013

12.31

Continued. Annual Overhaul

Chandrapur Unit 4

210

15/06/2013

13.33

Continued. Annual Overhaul

250

17/06/2013

08.40

Continued.

75

24/06/2013

08.15

230

03/01/2013

13.29

Continued. Gas shortage.

300

19/03/2013

15.50

Continued.

CPP Adani U-2

660

22/04/2013

13.47

Continued. ID fan problem.

Dabhol 1A

230

23/05/2013

12.58

Continued. Gas Shortage

Dabhol 3B

230

28/05/2013

21.58

Continued. Gas shortage.

Dabhol 1X

290

28/05/2013

22.02

Continued. Gas shortage.

Dabhol 1B

230

28/05/2013

22.02

Continued. Gas shortage.

Koyna Unit 11

80

04/06/2013

13.25

Continued. Rotar Fault.

Dabhol 2A

230

06/06/2013

09.10

Continued. Gas Shortage

Dabhol 2X

290

06/06/2013

09.12

Continued. Gas Shortage

Koradi Unit 5

200

10/06/2013

02.52

Continued. Furnace Pressure High

CPP WPCL U-4

135

12/06/2013

03.27

Continued. Turbine Balancing.

Bhusawal Unit 2

210

15/06/2013

23.07

24/06/2013

22.07

Bottom Ash Hopper leakage

CPP JSW (J) U2

300

17/06/2013

00.03

24/06/2013

20.07

Withdrawn

CPP VIPL

300

20/06/2013

03.30

500

21/06/2013

00.45

Uran Unit 8

108

21/06/2013

10.15

Koradi Unit 6

210

21/06/2013

11.00

CPP INDIABULLS

270

23/06/2013

05.23

Koyna ST-IV 1

250

23/06/2013

08.00

24/06/2013

08.00

Installation of UPS system

Koyna ST-IV 2

250

23/06/2013

08.00

24/06/2013

08.00

Installation of UPS system

Reason of Outage

PLANNED OUTAGE

Parli Unit 6

Koyna ST - IV 4
Koyna Unit 2

24/06/2013

18.20

Water Shortage/AOH from


06.03.2013

26/06/2013

Spherecial valve servomotor


oil and water leakages.
P. M. Work.

FORCED OUTAGE
Dabhol 2B
CPP VIPL

Tata Trombay 5

Withdrawn Due to Water


Shortage, No PPA.

Continued. CHP Problem.


24/06/2013

11.21

E/O, attending hydorgen


leakages (4 days).

Continued. Gas Shortage.


25/06/2013

07.06

Bunkering problem.

Continued. Oil shortage

4 of 8

State Load Dispatch Center,Airoli (MSETCL)


Details of Generating Unit Outages/Trippings for 24/Jun/2013
Position as on 6.30 Hrs of 25/Jun/2013
Name of Generating
Unit

Capacity

Tripped
Date

Trippe
Sync.Date
d Time

Sync.
Time

Expected
Date

Koyna ST - IV 3

250

23/06/2013

08.00

24/06/2013

08.00

Installation of UPS system

Bhusawal Unit 2

210

24/06/2013

22.11

25/06/2013

00.06

Flame Failure.

Reason of Outage

5 of 8

State Load Dispatch Center,Airoli (MSETCL)


Details of Line outages/Trippings for 24/Jun/2013
Position as on 6.30 Hrs of 25/Jun/2013

Name of Line

Tripped
Date

Tripped Synchronise Synchronise


Time
d Date
d Time

Reason of Outage

InterState
Voltage Level :

400KV

Outage Type

HAND TRIPPED

Parli (PGCIL)-Bhadravati-II 02/06/2013

19.24

Continued.

Over Voltage

Kolhapur - Mapusa - I

06/06/2013

16.44

Continued.

Over Voltage

Chandrapur-Bhadravti - I

09/06/2013

16.16

Continued.

Over Voltage

Kolhapur-Solapur (PG) II

13/06/2013

17.07

Continued.

Over Voltage.

Seoni-Wardha-II 765KV.

14/06/2013

10.54

Continued.

Over Voltage

Dabhol - NewKoyna - II

22/06/2013

11.54

Continued.

To attend Breaker Timing problem

Parli (PGCIL)-Bhadravati-II 23/06/2013

16.17

Continued.

Over Voltage

Dhule - S'Sarovar- II

24/06/2013

00.54

10.33

Over Voltage

Lamboti - Solapur (PGCIL) 24/06/2013

21.00

Continued.

Over Voltage.

Dhule-Sar'Sarovar - I

22.06

Continued.

Over Voltage.

Voltage Level :

24/06/2013

24/06/2013

400KV

Outage Type

Koradi-Satpur

14/06/2013

02.02

Karad - Solapur (PGCIL)

23/06/2013

18.01

Parli - Solapur (PGCIL) - I

24/06/2013

18.03

Akola - Wardha - I

25/06/2013

01.22

24/06/2013
25/06/2013

TRIPPED

Continued.

Over Voltage.

07.24

Over Voltage

Continued.

Over Voltage.

06.03

Over Voltage.

IntraState
Voltage Level :

400KV

400/220 KV 500 MVA ICT07/06/2013


I @ Deepnagar
400/220KV 315MVA ICT24/06/2013
III at Karad.
Voltage Level :
220KV
Main CB of 220/100kV 200
22/05/2013
MVA ICTIII @ Padgha
KDPH-Wankuswadi
24/06/2013

07.59

Outage Type PLANNED OUTAGE


ICT charged through Tie Bay due to
Continued. higher Tan Delta Values of HV side R
Phase Bus-II CT
Maint. Work.( @ 21.05 Hrs,HV Side
Continued.
Kept on Humming).
Outage Type PLANNED OUTAGE
Repl.of A bus,B bus isolator under
Continued.
JICA scheme.ICT on TBC.
Continued. Replacement of Bus Side Isolator.

17.03
13.35

10.46

Pophali - KDPH

24/06/2013

08.00

Continued.

Replacement of Bus Side Isolator.

Main Bus @ KDPH


220/132KV 200 MVA ICTII @ Amravati
Main Bus - I @
Aurangabad
Mumewadi-Mudshingi

24/06/2013

08.00

Continued.

Replacement of Bus Side Isolator.

24/06/2013

09.50

24/06/2013

11.41

Quarterly Maintenance Work of ICT.

24/06/2013

10.55

24/06/2013

17.24

Half Yearly Maintenance.

24/06/2013

14.00

24/06/2013

14.45

Shifting of PT From PT-II to PT-I.

Karad-Mudsingi-IV

24/06/2013

14.00

24/06/2013

14.45

Shifting of PT From PT-II to PT-I.

Voltage Level :

100KV

Outage Type

PLANNED OUTAGE

Vasai - Padgha

20/06/2013

09.05

Continued.

Raising the height of tower.

Kolshet-Vasai

20/06/2013

09.33

Continued.

Raising the height of tower.

Voltage Level :
400KV
400/220 KV 100 MVA
12/07/2012
Spare Unit @ Koradi
400/220 KV 105 MVA
Spare ICT Unit @
02/02/2013
Bhusawal - II
Dabhol - Nagothane - I
06/06/2013

Outage Type

HAND TRIPPED

07.11

Continued.

Main Buchholz prot.operated

10.17

Continued.

Low Oil Pressure Alarm Received.

21.21

Continued.

Over Voltage

Bhusawal- Aurangabad

07/06/2013

14.34

Continued.

Over Voltage

Deepnagar-Aurangabad-II

16/06/2013

10.46

Continued.

Over Voltage
6 of 8

State Load Dispatch Center,Airoli (MSETCL)


Details of Line outages/Trippings for 24/Jun/2013
Position as on 6.30 Hrs of 25/Jun/2013

Name of Line

Tripped
Date

Tripped Synchronise Synchronise


Time
d Date
d Time

Khadka - Deepnagar - II

22/06/2013

09.46

Kolhapur-Karad -I

22/06/2013

21.20

Karad - Newkoyna - I

23/06/2013

16.36

Chandrapur - Parli - III


Akola - Indiabull
(Nandgaonpeth)
Karad - Kolhapur - I

24/06/2013

00.50

24/06/2013

03.33

24/06/2013

Chandrapur - Parli - III


Akola - Indiabull
(Nandgaonpeth)
Lonikand- Koyna Stage IV
Dhule - Babhaleshwar - I
Voltage Level :

Reason of Outage

Continued.

Over Voltage

08.37

Over Voltage

Continued.

Over Voltage

24/06/2013

08.41

Over Voltage

24/06/2013

08.38

Over Voltage

17.09

Continued.

Over Voltage.

24/06/2013

21.56

Continued.

Over Voltage.

24/06/2013

21.58

06.14

Over Voltage.

24/06/2013

22.00

Continued.

Over Voltage.

25/06/2013

01.37

06.32

Over Voltage.

24/06/2013

25/06/2013

25/06/2013

220KV

Chikhali - Jalna - II

27/05/2013

17.23

Hinjewadi-II - Infosys

15/06/2013

16.02

Voltage Level :
400KV
400/11.5KV 90 MVA STN
25/09/2012
T/F III @ 400KV C'PUR
Karad - Kolhapur - II
21/06/2013

15.38
21.23

Outage Type HAND TRIPPED


To avoid over loading by taking line in
Continued.
grid.
New D/C line with Bays and 1 number
Continued.
T/F Bay at Infosys
Outage Type TRIPPED
Differential protection operated
Continued.
Declared Faulty by Genco.
Continued. Over Voltage.

Karad-Jaigad I

23/06/2013

03.02

Continued.

Over Voltage

Jejuri-Koyna STG-IV

23/06/2013

16.30

Continued.

Over Voltage

New Koyna - Dabhol - I

24/06/2013

01.27

24/06/2013

07.22

Over Voltage

Dabhol-Nagothane-II

24/06/2013

01.45

24/06/2013

05.54

Over Voltage

Lonikand- Koyna Stage IV

24/06/2013

02.54

Continued.

Over Voltage

Koradi - II - Indiabull

24/06/2013

21.58

22.27

Over Voltage.

Koradi - II - Indiabull

25/06/2013

00.49

Continued.

Over Voltage.

Voltage Level :
220KV
220/100 KV,200MVA ICT I at Padgha
220/132 KV 100 MVA ICT
- I at Balapur
Bus Section-III @ Nasik
GCR
Voltage Level :
132KV
132/11KV 16 MVA T/F @
Deepnagar

24/06/2013

Outage Type

TRIPPED

07/06/2013

17.48

Continued.

Diff.Protection

14/06/2013

06.28

Continued.

DC Earth Leakage.

20/06/2013

02.49

Continued.

R-Ph Bus section III CT Burst.

Outage Type
04/06/2013

01.34

Continued.

TRIPPED

Bursting of H V Y Ph. Bushing.

7 of 8

State Load Dispatch Center,Airoli (MSETCL)


Details of On Line Capacity for 25/Jun/2013
Generating unit
Koradi
Unit 5
Unit 6
Unit 7
Bhusawal
Unit 2
Unit 3
Unit 4
Unit 5
Parli
Unit 3
Unit 4
Unit 5
Unit 6
Unit 7
Chandrapur
Unit 1
Unit 2
Unit 3
Unit 4
Unit 5
Unit 6
Unit 7
Paras
Unit 3
Unit 4
Khaparkheda
Unit 1
Unit 2
Unit 3
Unit 4
Unit 5
Nasik
Unit 3
Unit 4
Unit 5
Uran
All Units
PENCH (MS)
Pench (MS)
Koyna
Stage 1-2
Stage 4
Stage 3
Hydro
KDPH
VTRNA

Derated Capacity
(MW)

OLC (MW)

Generating unit

200
210
210
620

0
0
160
160

210
210
500
500
1420

130
140
188

210
210
210
250
250
1130

0
0
0
0
0
0

210
210
210
210
500
500
500
2340

110
110
75
0
300
225
230
1050

250
250
500

250
250
500

458

TILLARI
BHTGR/VEER
BHIRA T.R.
RNGR+BHTSA
BHANDARDRA
ELDARY
SMLHY_PTN
GHATGHAR
Wind
MalharPeth
Vankuswadi
ATIT
Kale
Satara
Shirala
K Mahankal
Supa
Vita
Dondaicha
Sakri
Nandurbar
Khandke
Khaparale
CPP
JSW_JAIGAD
WARDHA
Adani
Other_CPPs

210
210
210
210
500
1340

100
140
140
0
250
630

Tata
Trombay 4
Trombay 5
Trombay 6
Trombay 7A
Trombay 7B
Trombay 8
TATA Hydro

210
210
210
630

195
180
195
570

REL
1&2

852
852

420
420

Cent_Sect
Share

Derated Capacity
(MW)

OLC (MW)

60
21
80
20
45
23
12
250
611

60
0
80
0
28
0
0
0
168

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1200
405
1320
300
3225

872
330
1234

150
500
500
120
60
250
444
2024

0
500
500
120
60
250
447
1877

500
500

500
500

3455
3455

4406
4406

2436

53
53
600
1000
320
1920

600
250
240
1090

40
60

0
0
20620

8 of 8

14265

You might also like