75% found this document useful (8 votes)
10K views

Pre Concreting Checklist

This document is a pre-concreting inspection check list for a project. It lists the project title, owner, consultant, contractor and details to inspect, including the form work, reinforcement, concreting materials, equipment, and tools. The inspection checks that the setting out is correct, form work is properly installed and supported, reinforcement is the right grade and placed correctly, the concrete meets specifications, and all necessary equipment is available. Space is provided to note any non-compliant items and obtain sign off from the inspector and verifier.

Uploaded by

bill_lee_242
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
75% found this document useful (8 votes)
10K views

Pre Concreting Checklist

This document is a pre-concreting inspection check list for a project. It lists the project title, owner, consultant, contractor and details to inspect, including the form work, reinforcement, concreting materials, equipment, and tools. The inspection checks that the setting out is correct, form work is properly installed and supported, reinforcement is the right grade and placed correctly, the concrete meets specifications, and all necessary equipment is available. Space is provided to note any non-compliant items and obtain sign off from the inspector and verifier.

Uploaded by

bill_lee_242
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

PROJECT TITLE:

WORK TITLE:

PRE-CONCRETING INSPECTION CHECK LIST


DATE LOCATION BUILDING ELEMENT OF STR GRADE OF CONCRETE CONCRETE SUPPLIER START OF INSPECTION FINISH OF INSPECTION OK NO

PROJECT OWNER:

CONSULTANT:

CONTRACTOR:

: : : : : : : :

SUBMITTAL DESCRIPTION No. 1 RFI 2 Shop Drawing 3 Method of Statement 4 Mix Design SETTING OUT DESCRIPTION No. 1 Gridline Position (tolerance 6mm if 3m; tolerance 3mm if < 3m) 2 Structural Finish Level (SFL) 3 Verticality WORKS BELOW LOWEST FLOOR LEVEL DESCRIPTION No. 1 Remove Stagnant Water and Soft Soil 2 Sand or Hardcore 3 Anti Termite Treatment (if needed) 4 Lean Concrete FORM WORK DESCRIPTION No. 1 Free from Cracks, Defects and Rubbish 2 Tight Joint and Gaps (seal if must) 3 Adequate Supported and Propped (rib max 300mm) 5 Dimension (Length, Width & Height) 6 Concrete Level Marked REINFORCEMENT DESCRIPTION No. 1 Correct Grade, Size, Number and Spacing 2 Adequate Lapping, Chairs and Spacer 3 Rebar Securely and Properly Tied in Place 4 Covers as Required 5 Free from Oil, Dust, Soil, and Loose Rust 6 Adequate Starter Bar (if needed) CONCRETING DESCRIPTION No. 1 Correct Grade and from Approved Supplier 2 Placing within 2 Hours from Dispatching (check DO) 3 Sufficient Slump (as per approved mix design) 4 Sufficient Sample 5 MEP Opening/ Embedded (if any) EQUIPMENT & TOOLS DESCRIPTION No. 1 Slump Test Tools (cone, bar, platform & tape meter) 2 Sample Cube Tools (cube, bar, cart, shove, trowel) 3 Crane with Concrete Container or Concrete Pump 4 Concrete Vibrator (with min. 1 stand by) 5 Concreting Recorder (forms & tools) 6 Curing Material (compund/ goni/ carpet) 7 Lighting (for night concreting). INSPECTED BY: VERIFIED BY:

REMARKS

OK

NO

REMARKS

OK

NO

REMARKS

OK

NO

REMARKS

OK

NO

REMARKS

OK

NO

REMARKS

OK

NO

REMARKS

DATE:

DATE: