0% found this document useful (0 votes)
306 views5 pages

Fire Mock Drill Conducted On 26.04.2012

The document summarizes a fire mock drill conducted at the Kothagudem Thermal Power Station. It describes the location of the drill, timeline of events, participating staff, and training provided. The drill was conducted near the ash handling plant and again near fans and hoppers to practice fire response. Staff were trained on operating hoses, nozzles, and firefighting techniques. The mock fires were successfully extinguished on both occasions.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
306 views5 pages

Fire Mock Drill Conducted On 26.04.2012

The document summarizes a fire mock drill conducted at the Kothagudem Thermal Power Station. It describes the location of the drill, timeline of events, participating staff, and training provided. The drill was conducted near the ash handling plant and again near fans and hoppers to practice fire response. Staff were trained on operating hoses, nozzles, and firefighting techniques. The mock fires were successfully extinguished on both occasions.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 5

ANDHRA PRADESH POWER GENERATION CORPORATION LIMITED KOTHAGUDEM THERMAL POWER STATION, STAGE-V

From:To: The Chief Engineer The Chief Engineer, Operation & Maintenance, Generation-I, K.T.P.S., V&VI-Stage, APGENCO, Vidyut Soudha Paloncha 507 115. Hyderabad. Lr.No.CE/O&M/KTPS/V&VI-Stg/Safety/F.No.21/D.No. 148 /2012,Dt: 02.05..2012. Sir, Sub:- KTPS/VI-Stage Safety-Fire Mock Drill conducted on 26.04.2012 at 10:30 Hrs. near Ash handling plant -XI Unit area of KTPS VI-Stage Detailed Report Reg. **** It is to inform that the class A Fire Mock Drill is conducted near Ash handling plant -XI Unit area at 10.30 hrs, KTPS VI-Stage on 26.04.2012 . The following Engineers and staff have been participated in the Fire Mock Drill. Sarva Sri 1. S.Veereddy : SE/E&M-II /KTPS-VI 2. CH.Appaji : DE/safety/KTPS-V&VI 3. K.Suri babu : DE/BOP-I/KTPS-VI 4. Md. Anwar Pasha : ADE/Safety/V Stage 5. S.Nagaiah : ADE/Safety/VI Stage 6. K.Ravi Kumar : ADE/Shift/AHP/ VI Stage 7. P.Seshasai : AAE/Safety/V Stage 8. T.Visweswara rao : AAE/Safety/VI Stage 9. P.M.Kumari ; Sub Engineer /Shift/ AHP/ VI Stage 10. P.G.Mandadi : Chief chemist/ VI Stage 11. B.Rajesh : Jr. Engineer / Techpro 12. E.Venkateswarlu : Contract worker/Santosh construction 13. S.Muthaiah : Contract worker /J.S.Contractor 14. J.Suresh Kumar : Contract worker /J.S.Contractor 15. B.Veera kiran : Contract worker /J.S.Contractor Fire tender Staff:1. B.Ramakrishnareddy : Station Fire Officer 2. M.Penchalaiah : Driver Operator 3. V.Pitchi reddy : F.M(LF Incharge) 4. R.Prasadu : Home Guard 5. J.Laxmi narayana : Home Guard The Fire Mock Drill is conducted on 26.04.2012 near Ash handling plant -XI Unit area of KTPS VI-Stage. is started at 10:30 Hrs and Fire Quenching operations are carried out from 10:36 Hrs. onwards. The Fire is completely Quenched off at 11-00 Hrs. The DE/Safety, ADE/Safety and Fire Tender Staff had given training to the participants regarding operation and fixing of Nozzles, Hoses to Hydrants and Fire quenching Techniques to Staff present to Fire Mock Drill. Encl:- 1 sheet operations and carried out. CS : Cc : Cc : Cc : Cc : Cc : Cc: Sd/- M.Sidhaiah Chief Engineer/O&M K.T.P.S. V& VI -Stage.

to S.E Techl to the Director/Thermal/APGENCO/V.S/Hyderabad. to Chief of Vigilance & Security /APGENCO./V.S/Hyderabad to All Superintending Engineers /KTPS/V&VI-Stage to All HODS /KTPSV&VI-Stage. // FORWARDED BY ORDER // to Security Officer/KTPS/V&VI-Stage. to Deputy. Chief Inspector of Factories/Warangal . to Inspector of Factories/Khammam.
DIVISIONAL ENGINEER SAFETY, KTPS V&VI-Stage.

OPERATIONS CARRIED OUT DURING FIRE MOCK DRILL ON 26.04.2012 AT 10:30 HRS.

Ash handling plant -XI Unit KTPS VI STAGE Time 1. 2. 10:30 Hrs.: Operations Carried out

Fire is observed by Sri E.Venkateswarlu / CL/Santosh construction , while carrying Out Ash handling plant -XI Unit works at area . 10:30 Hrs. : Sri . Sri E.Venkateswarlu / Contract worker/Santosh construction immediately intimated to Sri K.Ravi kumar/ ADE/Shift/AHP/ VI Stage by shouting FIRE-FIRE- FIRE
10:32 Hrs. :

3.

4.

10:33 Hrs. :

5.

10:34 Hrs :

6. 7. 8. 9. 10. 11.

10:35 Hrs.: 10:36 Hrs. : 10:39 Hrs. : 10:50 Hrs. : 10:52 Hrs. :

Sri K.Ravi Kumar / ADE/Shift/AHP/ VI Stage immediately informed over phone to Fire Station and requested to send the Fire Tender immediately for fire quenching operations. Sri K.Ravi Kumar/ ADE/Shift/AHP/ VI Stage and their staff are attended the spot along with Fire hoses and Nozzles from Ash handling plant -XI Unit connected to Hydrant point and started fire quenching operations Sri K.Ravi Kumar/ ADE/Shift/AHP/ VI Stage, immediately telephoned to DE/Shift/UCB, CE/O&M / KTPS/V&VI-Stage & SE / E&M-I, Factory Manager, Safety officer, Security Officer, DE/General and requested to arrange assistance and to witness the fire The Fire Tender Staff along with Fire Tender attended to the spot. The Fire Staff connected the Fire Hoses to Hydrant point and started Fire quenching operations. . The ADE/Safety, and other staff attended to the spot for assisting and witnessing the fire quenching operations. The Fire Staff and other existing staff completely quenched off the fire at Ash handling plant -XI Unit area. The Fire staff Trained the following Staff gathered at near Ash handling plant -XI Unit area in Fire quenching operations.

11:00 Hrs.: After ensuring as no more fire in that area and after giving training to the staff all the staff members including Fire Staff left the spot. Sarva Sri
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. K.Ravi Kumar P.G.Mandadi P.M.Kumari B.Rajesh E.Venkateswarlu B.Veera kiran S.Muthaiah J.Suresh Kumar R.Prasadu J.Laxmi narayana : : : : ; : : : : : ADE/Shift/AHP/ VI Stage Chief chemist/ VI Stage Sub Engineer /Shift/ AHP/ VI Stage Jr. Engineer/ Techpro Contract worker/Santosh construction Contract worker /J.S.Contractor Contract worker /J.S.Contractor Contract worker /J.S.Contractor Home Guard Home Guard Sd/- M.Sidhaiah

Chief Engineer/O&M K.T.P.S., V & VI-Stage.

ANDHRA PRADESH POWER GENERATION CORPORATION LIMITED KOTHAGUDEM THERMAL POWER STATION, STAGE-V&VI
From:To: The Chief Engineer The Chief Engineer, Operation & Maintenance, Generation-I, K.T.P.S., V&VI-Stage, APGENCO, Vidyut Soudha Paloncha 507 115. Hyderabad. Lr.No.CE/O&M/KTPS/V&VI-Stg/Safety/F.No.21/D.No. /2012,Dt: 28.06..2012. Sir, Sub:- KTPS/VI-Stage Safety-Fire Mock Drill conducted on 27.06.2012 at 10:52 Hrs. near between PA&FD Fans and ESP hoppers -XI Unit area of KTPS VI- Stage Detailed Report Reg. ****

It is to inform that the class A Fire Mock Drill is conducted near between PA&FD Fans and ESP hoppers -XI Unit area at 10.52 hrs, KTPS VI-Stage on 27.06.2012 . The following Engineers and staff have been participated in the Fire Mock Drill. Sarva Sri 1. S.Veereddy : SE/E&M-II /KTPS-VI 2. CH.Appaji : DE/safety/KTPS-V&VI 3. K.Vara prasad : DE/shift/UCB/KTPS-VI 4. Md. Anwar Pasha : ADE/Safety/V Stage 5. S.Nagaiah : ADE/Safety/VI Stage 6. B.Adinarayana : ADE/Shift/Boiler/ VI Stage 7. M.Veerabhdra rao : ADE/Shift/UCB/ VI Stage: 8. S.Vidyasagar : ADE/Shift/UCB/ VI Stage 9. B.Nagesh : ADE/SILOI/ VI Stage 10. A.Rangaiah : ADE/BOP-III/ VI Stage 11. P.Seshasai : AAE/Safety/V Stage 12. T.Visweswara rao : AAE/Safety/VI Stage 13. A.Madhu : AE/SILO/VI Stage 14. Ch.Ramesh ; Sub Engineer /Shift/ESP/ VI Stage 15. T.RaMESH : Sub Engineer /General/ VI Stage 16. G.S.Nagendra kumar ; PA/Shift/UCB/VI Stage 17. V.Saravan kumar : Sfety officer/BGR 18. G.Balu : Contract worker/Civil 19. A.Rajendra Prasad : Contract worker/Indwel 20. G.Tata rao : Contract worker/Civil 21. S.Ashok kumar : Contract worker/ P.E.S 22. P.Dastagiri : Contract worker/P.E.S 23. S.Muthaiah : Contract worker /J.S.Contractor 24. J.Suresh Kumar : Contract worker /J.S.Contractor 25. B.Veera kiran : Contract worker /J.S.Contractor Fire tender Staff:1. B.Ramakrishnareddy : Station Fire Officer 2. M.Penchalaiah : Driver Operator 3. Sk.Meera saheeb : F.M(LF Incharge) 4. B.Narendar : Home Guard 5. D.Rajendar : Home Guard The Fire Mock Drill is conducted on 27.06.2012 near between PA&FD Fans and ESP hoppers -XI Unit area of KTPS VI-Stage. is started at 10:52 Hrs and Fire Quenching operations are carried out from 10:58 Hrs. onwards. The Fire is completely Quenched off at 11-22 Hrs. The DE/Safety, ADE/Safety and Fire Tender Staff had given training to the participants regarding operation and fixing of Nozzles, Hoses to Hydrants and Fire quenching Techniques to Staff present to Fire Mock Drill. Encl:- 1 sheet operations and carried out. CS : Cc : Cc : Cc : Cc : Cc : Cc: Chief Engineer/O&M K.T.P.S. V& VI -Stage.

to S.E Techl to the Director/Thermal/APGENCO/V.S/Hyderabad. to Chief of Vigilance & Security /APGENCO./V.S/Hyderabad to All Superintending Engineers /KTPS/V&VI-Stage to All HODS /KTPSV&VI-Stage. to Security Officer/KTPS/V&VI-Stage. to Deputy. Chief Inspector of Factories/Warangal . to Inspector of Factories/Khammam.

OPERATIONS CARRIED OUT DURING FIRE MOCK DRILL ON 27.06.2012 AT 10:52 HRS. Between PA&FD Fans and ESP hoppers -XI Unit KTPS VI STAGE

Time 1. 2.

Operations Carried out

10:52 Hrs.: Fire is observed by Sri Ch.Ramesh ,Sub Engineer /Shift/ESP/VI Stage while carrying Out ESP -XI Unit works at area . 10:52 Hrs. : Sri . Sri Ch.Ramesh ,Sub Engineer /Shift/ESP immediately intimated to Sri B.Adinarayana / ADE/Shift/Boiler/ VI Stage by shouting FIRE-FIRE- FIRE Sri B.Adinarayana / ADE/Boiler/AHP/ VI Stage immediately informed over phone to Fire Station and requested to send the Fire Tender immediately for fire quenching operations. 10:55 Hrs. : Sri B.Adinarayana / ADE/Shift/Boiler/ VI Stage and their staff are attended the spot along with Fire hoses and Nozzles from ESP -XI Unit connected to Hydrant point and started fire quenching operations 10:56 Hrs : Sri B.Adinarayana / ADE/Shift/Boiler/ VI Stage, immediately telephoned to DE/Shift/UCB, CE/O&M / KTPS/V&VI-Stage & SE / E&M-I, Factory Manager, Safety officer, Security Officer, DE/General and requested to arrange assistance and to witness the fire 10:57 Hrs.: The Fire Tender Staff along with Fire Tender attended to the spot. 10:58 Hrs. : The Fire Staff connected the Fire Hoses to Hydrant point and started Fire quenching operations. . 10:39 Hrs. : The ADE/Safety, and other staff attended to the spot for assisting and witnessing the fire quenching operations. 11:01 Hrs. : The Fire Staff and other existing staff completely quenched off the fire at Between PA&FD Fans and ESP hoppers -XI Unit area. 11:12 Hrs. : The Fire staff Trained the following Staff gathered at near Between PA&FD Fans and ESP hoppers -XI Unit area in Fire quenching operations.
10:54 Hrs. :

3.

4.

5.

6. 7. 8. 9. 10. 11.

11:22 Hrs.: After ensuring as no more fire in that area and after giving training to the staff all the staff members including Fire Staff left the spot. Sarva Sri
1. B.Adinarayana 2. M.Veerabhdra rao 3. S.Vidyasagar 4. B.Nagesh 5. A.Rangaiah 6. A.Madhu 7. Ch.Ramesh 8. T.RaMESH 9. G.S.Nagendra kumar 10. V.Saravan kumar 11. G.Balu 12. A.Rajendra Prasad 13. G.Tata rao 14. S.Ashok kumar : : : : : : ; : ; : : : : : ADE/Shift/Boiler/ VI Stage ADE/Shift/UCB/ VI Stage: ADE/Shift/UCB/ VI Stage ADE/SILOI/ VI Stage ADE/BOP-III/ VI Stage AE/SILO/VI Stage Sub Engineer /Shift/ESP/ VI Stage Sub Engineer /General/ VI Stage PA/Shift/UCB/VI Stage Sfety officer/BGR Contract worker/Civil Contract worker/Indwel Contract worker/Civil Contract worker/ P.E.S