Question 1: When positive material identification (PMI) testing is required, portable X-ray fluorescence spectrometer: a. is an effective technique to detect all common alloying elements. b. is the most effective technique to detect carbon (C). c. can be used to detect elements lighter than sulfur (S). d. cannot be used to detect elements lighter than sulfur (S).
c. 12 MPY 0.012 in/yr (0.30 mm/yr) d. 6 MPY 0.006 in/yr (0.15 mm/yr)
Degradation types
Question 9: Piping components identified by PMI as not meeting the original piping specifications: a. Would be targeted for replacement. b. Must be scheduled for replacement at the next opportunity. c. Should be immediately reported to jurisdictional authorities. d. Must be replaced promptly.
Question 11: When the owner/user chooses to conduct a RBI assessment it must be a systematic evaluation in accordance with: a. API 579 b. API 580 c. API 570 d. API 581
Question 15: Whose responsibility is it to determine the extent of a retroactive material verification program needed for existing piping systems? a. Authorized piping inspector. b. Jurisdiction. c. Corrosion specialist. d. Owner-user.
Question 16: The owner-user shall specify industry qualified UT Shear Wave Examiners when: a. Trying to detect and size flaws for Fitness-for-Service evaluation. b. Conducting guided wave ultrasonic measurements for external corrosion on buried piping. c. The accuracy of longitudinal wave thickness measurements is in question. d. Validating that higher-term corrosion rates are to be used in remaining life calculations.
Question 21: Fitness-for-Service assessment is a methodology for flaw assessment in order to determine: a. The likelihood that a piping component will be acceptable for high temperature service. b. If a piping system has the integrity for continued service. c. The risk that a piping system will be thinner than the corrosion allowance. d. The consequence of a sudden brittle fracture at low temperatures.
b. An inspector who passes the EPRI Time-of-Flight Diffraction Examination. c. A person who has passed the API 570 Examination for authorized inspector certification. d. An NDE technician with ANSI Level II Certification in Ultrasonic Shear Wave examination.
Question 26: The difference between long-term and short-term corrosion rate calculations is that: a. The long-term corrosion rate results in a more accurate remaining life. b. The short-term corrosion rate uses "T previous" in the calculation c. The long-term corrosion rate uses "T minimum" in calculating remaining life. d. The short-term corrosion rate results in a more accurate remaining life.
Question 29: What is the long-term corrosion rate of a carbon steel piping system that was installed in 1983 with a nominal thickness of 0.395" (10 mm)? Before it was started up the measured thickness was 0.375" (9.5 mm). The previous measurement in 1993 was 0.295" (7.5 mm) and the last measurement was 0.255" (6.5 mm) in 2003. a. 12 MPY 3.010 in/yr (0.30 mm/yr) b. 4 MPY 0.008 in/yr (0.10 mm/yr) c. 6 MPY 0.006 in/yr (0.15 mm/yr) d. 2 MPY 0.007 in/yr (0.05 mm/yr)
Question 31: PMI Test procedures should cover: a. Qualification requrements for PMI personnel. b. Basis for action for resolving non-conformance. c. Percentage of sampling tests required. d. Test instrument ID or serial number.
d. Any physical test of a material to confirm that it is consistent with the alloy specification.
Question 38: When risk-based inspection (RBI) is chosen to assess the likelihood of a pressure vessel failure, the likelihood assessment must be based on all forms of degradation that could reasonably be expected to affect a vessel in any particular service. The likelihood of failure assessment should be: A. Repeated each time process changes are made that could significantly affect degradation rates or cause premature failure of the vessel. B. Repeated each time process changes are made regardless whether the process changes could affect degradation rates or cause premature failure of the vessel. C. Repeated once every 5 years regardless whether the process changes could affect degradation rates or cause premature failure of the vessel. D. Repeated once every 20 years regardless whether the process changes could affect degradation rates or cause premature failure of the vessel.
Question 39: Which of the following techniques is specifically cited by API RP 577 as having special limitations due to concerns for incomplete fusion? A. GMAW - Globular transfer B. GMAW - Arc transfer C. GMAW - Spray transfer D. GMAW - Short circuiting transfer
Question 40: The results of the visual inspection should be documented to facilitate: A. Follow-up inspection B. Removal of insulation C. Retire of piping D. Corrosion rates
Question 41: An acceptable flow rate for welding on an in-service liquid hydrocarbon piping system is: A. 5.0 ft/sec (1.52 m/s) B. 0 ft/sec ( 0 m/s) C. 7.5 ft/sec (2.78 m/s) D. 2.5 ft/sec ( 0.76 m/s)
Question 42: How do you evaluate the effects of fire damage on a piping system? A. B. C. D. Utilizing API 570 Piping Inspection code. Utilizing API 574 Inspection Practices for Piping Components. Utilizing API 579 Fitness-for-Service. Utilizing API 578 Material Verification programs.
Question 43: "T required", in the remaining life of a piping system, is equal to the required thickness at the location being measured A. Plus the amount of metal loss calculated from the corrosion rate in the next run. B. Before the corrosion allowance and manufacturer's tolerance are added. C. Including the corrosion allowance for the next operating run. D. Plus twice the amount of metal loss calculated for the next operating run.
Question 44: What is the level of examination in a Material Verification program? A. The percentage of welds to be radiographed. B. The ASNT level of cerification of the examiners. C. The size of the lots to be examined by PMI. D. The specified percentage of the number of components to be examined. Question 45: When an inspector discovers some field welds that were made by an unqualified welder, what does API 577 recommend as the first action of the inspector? A. Require all improper weldments to be removed B. Test welder to requalify C. Perform 100% NDE of all improper weldments D.Quarantine all improper weldments
Question 46: API 578, Material Verification program for new and existing alloy piping systems covers: A. Pipe shoes. B. Dummy (support) legs. C. Valves. D. All of the above.
Question 47: External visual inspection intervals can be established by using: A. API RP 580 B. API RP 574 C. API RP 651 D. API RP 578 Question 48: Piping system corrosion rates shall be calculated on: A. Always on a short-term basis. B. Preferably on a long-term basis. C. Circuit averaging basis. D. Either a short-term or long-term basis
Question 49: To evaluate blisters and laminations a fitness-for-service assessment should be performed in accordance with: A. API 579 Section 6 B. API 579 Section 5 C. API 579 Section 8 D. API 579 Section 7
Question 50: In a Positive Material Identification program, a material non-conformance is a test result that: A. Is not consistent with the specified alloy. B. Indicates that the material is corroding faster than design expectations. C. Indicates that the material was incorrectly specified. D. Is not consistent with the selected alloy, except for materials found to be higher alloy. Question 51: Inspection intervals for potentially corrosive injection mix points can also be established by: A. API RP 580 B. API RP 574 C. API RP 578 D. API RP 651 Question 52: The API 578 Material Verification Program is for: A. Determining if the alloy piping system has been correctly specified. B. PMI of nozzles and flanges on pressure vessels. C. New and existing alloy piping systems. D. All new and existing B31.3 piping systems. Question 53: During welding operations the inspector should confirm that: A. The welding parameters are supported by the WPS and WPQ B. The WPS and WPQ are qualified for the work. C. The inspection dossier is accurate and complete. D. The NDE examiner and NDE procedures are acceptable for the work. Question 54: The primary purpose for preheating carbon and low alloy steel prior to welding is to: A. Reduce the chance for delayed cracking B. Reduce shrinkage stress C. Eliminate moisture from the weld area D. Meet the requirements of the applicable fabrication code
Question 55: The "as-built" standard for an aboveground storage tank component is: A. The Seventh Edition of API 650 (August 1996). B. The standard that was in effect at the date of the installation of the component. C. The standard that was in effect when API 653 was first published in 1993. D. The current applicable standard. Question 56: The API 578 Material Verification Program is for: A. All new and existing B31.3 piping systems. B. New and existing alloy piping systems. C. Determining if the alloy piping system has been correctly specified. D. PMI of nozzles and flanges on pressure vessels. Question 57: Fluids that will rapidly vaporize are those with atmospheric boiling temperatures below: A. 60 F (15.5 C) B. 70 F (21.1 C) C. 50 F ( 10 C) D. 55 F (12.7 C)