Indra Nagar Sector4 M2.1195

1. The document is an estimate for repair works at a housing colony in Indira Nagar, Lucknow including dismantling of plaster, cement plastering, concrete work, waterproofing, flooring, door frames, doors, water tanks, pipes, and boundary wall construction. 2. The estimate provides details of the measurements, specifications, rates analysis, and bill of quantities for each work item. 3. The total estimated cost for the repair works is Rs. 162,135.18

Uploaded by

lkovijay
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
57 views13 pages

Indra Nagar Sector4 M2.1195

1. The document is an estimate for repair works at a housing colony in Indira Nagar, Lucknow including dismantling of plaster, cement plastering, concrete work, waterproofing, flooring, door frames, doors, water tanks, pipes, and boundary wall construction. 2. The estimate provides details of the measurements, specifications, rates analysis, and bill of quantities for each work item. 3. The total estimated cost for the repair works is Rs. 162,135.18

Uploaded by

lkovijay
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 13

izfrosnu

: - - M-2-1195 . izkfo/kku%& vkx.ku esa fuEufyf[kr dk;ksZa dk izko/kku fd;k x;k gS %& Dismantling of Plaster 115mm. thick Plaster 240 thick 1:2:4 Flooring 3water proofing on roof by fiber concrete treatment 4PVC door and Flush door 5 water tank 6

njsa%&

;g vkx.ku tuin y[ku gsrq Lohd`r orZeku 'ksM~;wy vkWQ jsV~l ,oa U;wure cktkj njksa ij vk/kkfjr fo'ysf"kr njksa ij xfBr fd;k x;k gSA

fof'kf"V;kWa leLr dk;Z yksd fuekZ.k foHkkx ds foLr`r fof'kf"V;ksa ds vuqq:i lEikfnr djk;s tk;saxsA %& vr% mijksDr dk;Z dk vkx.ku ykxr #0- 1.62 yk[k ek= dh iz'kkldh; vuqeksnu ,oa foRrh; Lohd`fr rFkk /kukoUVu gsrq izLrqr fd;k tk jgk gSA

voj vfHk;Urk vuqj{k.k [k.M yks0fu0fo0] y[ku

lgk;d vfHk;Urk vuqj{k.k [k.M yks0fu0fo0] y[ku

vf/k'kklh vfHk;Urk vuqj{k.k [k.M yks0fu0fo0] y[ku

CHECKING PROFORMA
Preliminary and Detailed Estimate Sl.No Particulars .
(a) (b)
(c)

Compliance

(d) (e)
(f)

1 ReportProper reference have been quoted and attested copies attached with the estimate. In case of revised estimate the amounts of excess has been given Item wise in the comparative statement with detailed reasons. Signatures of A.E., E.E., & S.E. exist. Details of forest land with name of village & chainage. Required certificates are mentioned or not. Name of JE/AE who surveyed the work for preparaion of estimate. 2 SpecificationsDetailed specifications for each item of work are included in the estimate. Signatures of A.E., E.E., & S.E. exist. 3 DesignsThese have been prepared as per standard practices and C.E's instructions. Each design has been signed by E.E. & S.E. in the end, and important designs by C.E. as well. 4 Analysis of RatesAnalysis of non-schedule items are based on the market rates is attached or not. Each analysis have been signed by J.E.,A.E., E.E. & S.E. in the end. 5 Details of measurementsEach page has been signed by J.E.,A.E. & by E.E. in the end of each set. 6 Bill of QuantityEach page has signature of J.E. , A.E. and E.E. at the end of each set. 7 Summary of estimated costThese have been signed by J.E., A.E., E.E. & S.E. 8 PlansThese have been signed by J.E., A.E., E.E. & S.E. 9 GeneralName and designation should exist, below all signature and corrections.

Yes/NA Yes/NA Yes NA Yes Er.Vijay Kumar/ Er.Manjari Verma Yes Yes Yes/NA Yes/NA

(a) (b) (a) (b)

(a) (b)

Yes/NA Yes Yes

Yes Yes Yes/NA Yes Yes

12-

Each page of the design, analysis of rates, details of the measurements, 10 DesignationDivisional Office:- Construction Division No. 1, P.W.D., Lucknow S.No. Name Designation 1 Er. Vijay Kumar Junior Engineer, M.D.-1 (civil), UPPWD, Lucknow. 2 Er. Manjari Verma 3 Er. R.M. Sharma 4 Er. Satyavir Singh Assistant Engineer, M.D.-1 (civil), UPPWD, Lucknow. Junior Engineer(T), M.D.-1 (civil), UPPWD, Lucknow. Executive Engineer, M.D.-1 (civil), UPPWD, Lucknow.

Signature

Summarey of Estimated Cost


: - - M-2-1195 .
Sl. No.
1 2 3

Particulars
As per Billof Quantity. Add Labour Cess 1% Add Contingency Charges 2%

Amount
157412.80 1574.13 3148.26

Total = Rs.

162135.18

Junior Engineer Maint. Division No. 1(Civil) P.W.D. Lucknow

Assistant Engineer Maint. Division No. 1(Civil) P.W.D. Lucknow

Executive Engineer Maint. Division No.-1(Civil) P.W.D. Lucknow

fo"k; lwph
dz0la0 1 2 3 4 5 6 7 8 9 10 en dk fooj.k 'kh"kZd i`"B tkap izi= fo"k; lwph izfrosnu lUnHkZ fof'kf"V;kW nj fo'ys"k.k ekiksa dk fooj.k ,oa ek=kvksa dk ns;d ykxr dk lkjka'k ekufp= 7 9 10
--------

i`"B la[;k 1 2 3 4 5 6

fof'kf"V;kW
leLr dk;Z yksd fuekZ.k foHkkx dh foLr`r fof'kf"V;ksa ,oe~ izeq[k vfHk;Urk] yks0fu0fo0 ds uohure ifji=ksa ds vuq:i lEikfnr djk;s tk;saxsA

voj vfHk;Urk lgk;d vfHk;Urk flfoy vf/k'kklh vfHk;Urk vuqj{k.k [k.M ua0&1 flfoy jktHkou] y[ku vuqj{k.k [k.M ua0&1 flfoy yks0fu0fo0] y[ku yks0fu0fo0] y[ku

DETAILS OF MEASUREMENTS AND BILL OF QUANTITY


: . - - M-2-1195
MEASUREMENT L. B. UNIT H. QTY. RATE

Sl. No. ITEM OF WORK 1 Dismantling existing plaster, including racking out joints of brick work including disposal of refuge as directed by Engineer-in-charge with in a distance of 60 metres (SI.No. 706+707)

N0.

1 1 1 1 1 1 1 1 2 15 mm Cement plaster in single coat on rough side of single or half brick wall for interior plastering upto floor two level including internal rounded angles chamfers, and rounded angles not exceeding 80 mm. in girth and finished even and smooth.( 1 Cement :4 coarse sand ) 1 1 1 1 1 1 1 1

1 1 1 2 2 2 2 2

8.40 4.40 2.80 6.50 2.80 2.20 2.50 13.50

3.40 2.40 0.70 2.80 2.70 2.00 2.30 3.00 Total=

28.56 10.56 1.96 36.40 15.12 8.80 11.50 81.00 193.90

Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm

37.00

1 1 1 2 2 2 2 2

8.40 4.40 2.80 6.50 2.80 2.20 2.50 13.50

3.40 2.40 0.70 2.80 2.70 2.00 2.30 3.00 Total=

28.56 10.56 1.96 36.40 15.12 8.80 11.50 81.00 193.90

Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm

144.00

3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-all work upto plinth level 1:4:8 (1 cement:4 fine sand:8 graded brick aggregate 40mm nominal size) 1 1 1 1 1 1 5.50 3.20 6.25 4.80 3.00 1.60 0.10 0.10 0.10 Total= 2.64 0.96 1.00 4.60 Cum Cum Cum Cum 3161.00

Sl. No. ITEM OF WORK 4 Providing and laying water proofing on lime
concrete roof by way of ferro concrete method detail as under:(a) Removing of bitu-felt, 25mm cement concrete/20mm cement mortar/25mm loose lime concrete & gola etc. (b) Making up with 25mm thick cement concrete 1:2:4 (12.5 mm stone aggregate) admixed with concrete bond101/chembond/warrior-W-4, or equivalent polymer based bonding materials, one kg per bag of cement. (c) applying doncrete-A&B/Roof coat-AR/ Supercrete-SB (IS: 13435, Part-3), or equivalent polymer based coating (coating (two pack system) @ 400gm/sqm, second layer @ 600gm/sqm by brush. (d) Protective layer of 20mm thick cement: coarse sand (1:4) with power loom (G.I.) chicken mesh and admixed with concrete bond-101/chembond/warriorWarrior-W-4, or equivalent polymer based bonding materials one kg per bag of cement, finishing the surface with neat cement and making of 9300 X 300)mm square. The entire treatment will be taken up to 30cm on parapet wall.

N0.

MEASUREMENT L. B.

UNIT H. QTY. RATE

1 1

1 1

8.40 4.40

5.90 2.40 Total=

49.56 10.56 60.12

Sqm Sqm Sqm 1007.00

40mm. thick Cement concret flooring 1:2:4 (1 cement, 2 coarse sand,4 Stone aggregate of size 20 mm nominal size ) laid in one layer finished with floating coat of neat cement and curing complete and including supply of all materials,labour T & P etc.required for proper completion of work 1 1 1 1 1 1 5.50 3.20 6.25 4.80 3.00 1.60 Total= 26.40 9.60 10.00 46.00 Sqm Sqm Sqm Sqm

ver

325.00

Mild steel or iron work in heavy sizes such as trusses, built up gates, door frames, record racks, roof work, gates etc. wrought to required from including drilling holes, revetting or welding where necessary and also including supply of steel, bolts, nuts etc. & their fixing required for proper completion of the work. (SI.No. 503) for door frame Toilet Door

2 1 2 2

2 2 2 1

2.00 1.10 2.00 0.75 Total= 19.70m @ 3.50kg/m

Weight for Angle 40x40x6mm

8.00 2.20 8.00 1.50 19.70 68.95

Mtr Mtr Mtr. Mtr. Mtr Kg

71.00

Sl. No. ITEM OF WORK 7 24 mm thick factory made PVC door shutters
made of styles and rails of a uPVC hollow section of size 59x24 mm and wall thickness 2 mm ( 0.2 mm) with inbuilt edging on both sides. The styles and rails mitred and joint at the corners by means of M.S. galvanised/plastic brackets of size 75x220 mm having wall thickness 1.0 mm and stainless steel screws. The styles of the shutter reinforced by inserting galvanised M.S. tube of size 20x20 mm and 1 mm ( 0.1 mm) wall thickness. The lock rail made up of 'H' section, a uPVC hollow section of size 100x24 mm and 2 mm ( 0.2 mm) wall thickness, fixed to the shutter styles by means of plastic/galvanised M.S. 'U' cleats. The shutter frame filled with a uPVC multi-chambered single panel of size not less than 620 mm, having over all thickness of 20 mm and 1 mm ( 0.1 mm) wall thickness. The panels filled vertically and tie bar at two places by inserting horizontally 6 mm galvanised M.S. rod and fastened with nuts and washers, complete as per manufacturer's specification and direction of Engineer-incharge. (For W.C. and bathroom door shutter). ( Item No.- DSR- 2012- 9.118.1)

N0.

MEASUREMENT L. B.

UNIT H. QTY. RATE

Toilet Door 8 Supply and fixing of 32mm thick flush door /window commercial quality confirming to IS 2202 part -I (1983) including fixing of wooden cleats and stoppers and including fixing and adjustment of hinges bolts, locks, handle springs fittings with necessary screw to be supplied departmentally. SI.No. 470(A)

0.75

2.00

3.00

Sqm 2918.88

1
9 Supply and hoisting of low density polythene seamless one piece moulded tank and placing the same in proper position including all taxes labour and T&P etc. for proper completion of the work.

1.00

2.00

4.00

Sqm 1269.00

1
10 Providing and fixing G.I. Pipes complete with G.I. fittings and clamps, i/c making good the walls etc. concealed pipe, including cutting chases and making good the wall :15 mm dia nominal bore

500

500.00

ltr

7.00

1
11 First Class brick work in 1:4 (1 cement: 4

20.00

20.00

Mtr

206.00

part of coarse sand 2.25 FM) mortar in super structure including supply of all materials, labour, T&P etc. required for proper completion of the work. wall of one brick thick For Boundry wall

1 1

1 2

2.00 0.45

0.23 0.45

1.50 1.50 Total=

0.69 0.61 1.30

Cum Cum Cum 4576.00

G. Total =

ANTITY

AMOUNT

7174.30

27921.60

14540.60

AMOUNT

60540.84

14950.00

4895.45

AMOUNT

8756.65

5076.00

3500.00

4120.00

5937.36

157412.80

o`Rr dk uke : [k.M dk uke sssys[kk kh"kZd dk;Z dk uke

39okW o`Rr] yksd fuekZ.k foHkkx] y[kuA

vuqj{k.k [k.M ua0&1flfoy yksd fuekZ.k foH 8443 fMikftVA


- 04 - M-2-1191 .

vuqekfur ykxr

:0 1.04 yk[k

k foHkkx] y[kuA

y yksd fuekZ.k foHkkx] y[kuA

- 04 .