EASA Regulation Structure
EASA Regulation Structure
Title:
Outline
EASA Regulation structure EASA Rulemaking Procedure
Outline
EASA regulation structure EASA Rulemaking Procedure
RMT.0281 (MDM.082)
Outline
EASA regulation structure EASA Rulemaking Procedure
Phase 1: Programming
Decision
Opinion
What to do when?
How to do it?
Inputs to rulemaking
European Aviation Safety Plan
Safety Recommendations
Industry
European Institutions
Rulemaking Proposal
Initial review
Develop Pre-RIA
Initial review
10
2013
Feb Mar Apr May Jun Jul Aug Sep
Continuous process Initial Develop as soon as review Pre-RIA Pre-RIAs are ready
11
2013
Feb Mar Apr May Jun Jul Aug Sep
Continuous process Initial Develop as soon as review Pre-RIA Pre-RIAs are ready
12
2013
Feb Mar Apr May Jun Jul Aug Sep
Continuous process Initial Develop as soon as review Pre-RIA Pre-RIAs are ready
13
Decision Analyse with CRD issue Phase Draft 2:NPA Public Draft Public Final ToR RIA CRD and Consult Edit Rule (RIA) Consult CRD Rule development develop Opinion Draft RIA with CRD
14
Concept Paper
Decision
with CRD
Consult 4-year RAG/ ToR Rule Task making initiation TAG/ GC Programme SSCC
Draft ToR
Opinion
with CRD
15
Analyse Consult 4-year RAG/ ToR issue Rule Task and making initiation TAG/ GC develop Programme SSCC Draft RIA
Decision
with CRD
RIA
Draft Rule
NPA
(RIA)
Opinion
with CRD
16
Analyse Consult 4-year RAG/ ToR issue Rule Task and making initiation TAG/ GC develop Programme SSCC Draft RIA
Decision
with CRD
RIA
Draft Rule
NPA
(RIA)
Opinion
with CRD
The Notice of Proposed Amendment with the RIA to describe and explain the proposal to the public
17
Analyse Consult 4-year RAG/ ToR issue Rule Task and GC making initiation TAG develop Programme SSCC Draft RIA
Decision
RIA
Draft Rule
NPA
(RIA)
Public Consult
with CRD
Opinion
with CRD
http://hub.easa.europa.eu/crt/
18
19
02/ 13
03/ 13
1.op tion
04/ 13
05/ 13
RIA
06/ 13
07 /13
08/ 13
09/ 13
1. NPA
10/ 13
11/ 13
2. NPA
12/ 13
01/ 14
02/ 14
3. NPA
03/ 14
04/ 14
05/ 14
06/ 14
NPA Pub
2-6 months
3-18 months
1-3 months
2-6 months
Decision
with CRD CRD drafting and final review Opinion with CRD
Analyse Consult 4-year RAG/ ToR issue Rule Task and GC making initiation TAG develop Programme SSCC Draft RIA
RIA
Draft Rule
NPA
(RIA)
Public Consult