Control of Documents (IMS)
Control of Documents (IMS)
Document ID: P-MR-01 /Rev. 00 /Rev. Date: 01-Jun-2009 /Page 1 of 11 Prepared By Approved By Name, Date, Sign Name, Date, Sign
IMS Procedures
4.0
Process KPIs #
No of NCs, complaints, attributed to use of current document No of instance where improper document used Time taken
Input
Need for Document And Data, External Standards
Output To define a procedure for review, approval and distribution of documents to ensure that no document is used inadvertently.
Approved Documents with Proper Identification at point of use
Customer
Users
Key Resource
1. 2. 3. 4. 5. Master copy Controlled copy uncontrolled copy obsolete copy Stamps
Method
Procedure for document & data control
The responsibility, source, frequency for data collection against targeted objectives (KPIs), required for analysis & improvement are documented at refer document here.
Document ID: P-MR-01 /Rev. 00 /Rev. Date: 01-Jun-2009 /Page 2 of 11 Prepared By Approved By Name, Date, Sign Name, Date, Sign
IMS Procedures
Take prior / verbal approval and note changes on Existing doc. (if available) for corrections & record it , create new document
Prepare Document
Corrective action
Customer Feedback
Distribution of controlled copy Hard or soft (MR must for all doc.) Remove Obsolete copy
DTR Action
IMS Procedures
5.1 Control of documents Sr. Document type No. 1 IMS Manual 2 Quality Policy, SHE Policy 3 Operation Procedures 4 Work instruction 5 Formats, Registers, Logbooks 6 Technical Documents/ Specifications/ Quality Plans Sr. No. 5.1 5.2 Activity
Responsi bility MR
The Integrated management system documentation is having 5 levels Document Identification: IMS Policy Displayed At All Prominent Places In Organization is identified by issue status and date Level 1 : Vision & Guidelines Considering Vision 2020, IMSU Guidelines, External documents (Standards, Laws relevant to IMSPL) Level 2 : IMS Manual This is the apex level document describing the IMS policy, objectives and broad guidelines describing how each of the elements of ISO 9001:2008,ISO 14001:2004 and OHSAS 18001:2007 IMS are complied with. IMS Manual is one single document and is called IMS manual. IMS Manual also contains three apendix, which are referred in the IMS manual. Appendix are treated as Level 2 documents for document control purposes. Identification method : IMS Manual/ RRRevision Number / Revision Date / Page Number Level 3 : IMS Procedure Manual This is the detailed quality procedure manual, which is consistent with the requirements of the ISO 9001:2008,ISO 14001:2004 and OHSAS 18001:2007 standards. These documents describe the procedures in step by step sequence in detail, the responsible person and also
Document ID: P-MR-01 /Rev. 00 /Rev. Date: 01-Jun-2009 /Page 4 of 11 Prepared By Approved By Name, Date, Sign Name, Date, Sign
IMS Procedures
Identification method : Procedure No./ Revision No./ Revision Date Level 4 : Work Instructions / Specifications / Master list / Plans and or Calendars This contains detail of standard operating procedures, work instructions, specifications, master list for activities, which are described in IMS procedures. These documents are prepared for providing instructions for carrying out a specific work or task. The numbering system in this level is as follows: AA- XX-YY
AA: Document Code: for IMS XX : Department Code = EN, HR, MK, MR, PD, PR, QA, ST. YY : Serial Number = 01, 02, etc
Document Codes: WI = Work instructions (SOPs) PS = Product Specifications / Purchase Specification PL = Plans and or Calendars M = Master list AI = Aspect Impact RA = Risk Assessment Department Codes : Given in section 5.3 below Identification method : Document No./ Revision No./ Revision Date Level 5 : Forms / Registers / Logbooks This level consists of Forms / Registers / Logbooks where all data are recorded as a supporting document to level 1, 2 and 3. These forms demonstrates the functioning of the quality management system The numbering system in this level is same as level 4 with following for document code:
Document ID: P-MR-01 /Rev. 00 /Rev. Date: 01-Jun-2009 /Page 5 of 11 Prepared By Approved By Name, Date, Sign Name, Date, Sign
IMS Procedures
5.3
MR / HOD
IMS Procedures
5.5
MR
IMS Procedures
5.6
5.7
IT system administrat or
5.8
HOD-IT
HOD-IT
HOD-IT HODs
IMS Procedures
5.9
5.10
Usersoffice HOD-IT
5.11
5.12
5.13
I)
II) III)
IMS Procedures
IV)
Types Of Procedure
Document No.
IMSPL/Proc/MR/02
Types Of Documents
Document No.
Level 3, IMS Procedure Manual Master List of Documents, Level 4, Work Instructions, Technical documents, Reference charts Master List of Documents, Level 5, Forms / Formats / Files Master list of management programs (EMP/SMP) Distribution List IMS Manual and Procedures Distribution List Level 4 documents Master List : Documents of external origin Master List : IMS records Master List : Trained internal auditors Master List : First Aiders Master List : Fire Fighters Master List : Emergency team members Master List : First aid box locations Master List : Assembly points Master List : Fire points Master List : Installed systems (Hardware-Software) and users (in Soft Copy) EDP Guidelines
P-TOC
Types Of Documents
Document No.
IMSPL/F/IT/01 IMSPL/F/IT/02
IMS Procedures
Rev No
Rev Date
Amendment Summary
--
Document ID: P-MR-01 /Rev. 00 /Rev. Date: 01-Jun-2009 /Page 11 of 11 Prepared By Approved By Name, Date, Sign Name, Date, Sign