Stage 3 Shutdown Start Up Log

The document provides a checklist for shutting down and starting up a power generation unit. It lists activities that need to be monitored and remarks for each step of the shutdown and startup processes. The checklist includes monitoring boiler parameters such as pressure and temperature, ensuring auxiliary systems are available, checking turbine components, and synchronizing the generator to the grid.

Uploaded by

VIBHAV
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
60 views

Stage 3 Shutdown Start Up Log

The document provides a checklist for shutting down and starting up a power generation unit. It lists activities that need to be monitored and remarks for each step of the shutdown and startup processes. The checklist includes monitoring boiler parameters such as pressure and temperature, ensuring auxiliary systems are available, checking turbine components, and synchronizing the generator to the grid.

Uploaded by

VIBHAV
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 21

Stage 3: Unit Shutdown Checklist

Date : __________ Time : ___________ Reason of Tripping: __________________________________________________________ __________________________________________________________ __________________________________________________________ 1. Unit Just Tripped / Stopped First Up acted --- Turbine: !oiler :

!oiler Side
S."o #cti$it% to be &onitored Both PA Fans stopped 1.
2. 3. 4. &. '. ,. -. /. 12. 11. 12. 13. 14.

'e&arks

All Mills Tripped All Feeders Tripped ! spra" #al#es $losed on a%to R! spra" #al#es $losed on a%to All $anners sho( )* + Flame !F* Tri p #al#e is $losed .D* trip #al#e is $losed !F*0.D* )o11le #al#es in $losed $ondition All !ot air gates are in $losed $ondition 3lose Boiler top #al#es B%rner Tilt 4e$ame hori1ontal 3lose the #al#es if the Boiler is not going to 4e lighted %p immediatel" P%t the $ontrol in man%al and $lose P%t the $ontrol in man%al and $lose

1&.

Turbine Side
S."o 1(. 1). #cti$it% to be &onitored
Both the 4%ses %ppl" $hange o#er to station Both the 42256 4rea7ers are open .%4e oil press%re 9

'e&arks

1-. A*P $ame on a%to 8 2-&2 RPM


1/. 22. 21. 22. 23. 24. 2&. 2'. 2,. 2-.

All T%r4ine stop and $ontrol #al#es $losed 3he$7 !P e#a$%ation #al#e open T%r4ine speed is $oasting do(n 3ondenser #a$%%m is )ormal 0 7illed All e:tra$tion #al#es $losed .P! 1;2;3 0 !P! &A ; &B ; 'A ; 'B 0 D0A BFP 3 to 4e 7ept in ser#i$e for maintaining Dr%m .e#el <i#e Trip $ommand to TDBFPs 3he$7 TDBFPs $ame on 4arring speed !P B"pass #al#es in $losed $ondition 3lose the man%al #al#e in !P B"pass spra" line R! press%re sho%ld 4e less than 12 5s$ 3he$7 all the MA. drains are open in$l%ding !P 3asing drain 3he$7 Motorised drain in 3R! line is in open $ondition @*P started at &12 RPM <ate #al#e gearing open at 212 RPM 2 3lose from lo$al =f re>%ired R! $an 4e de ? press%ri1ed

2/.
32. 31. 32. 33.

Time ta7en for T< $ome on 4arring speed from 3222 RPM to 1. Time ta7en to rea$h &42 RPM :
34.

_______________ min%tes _______________ min%tes _______________ min%tes _______________ min%tes

2. Time ta7en to rea$h 212 RPM : 3. Time ta7en to rea$h 122 RPM : 4. Time ta7en to rea$h -& RPM A 6a$%%m 5illed B :

3&. 3'. 3,.

3ontin%o%sl" monitor !ot(el le#el 3he$7 Dearator le#el 3lose !P B"pass spra" man%al #al#e

3losing of ma7e %p #al#e ma" 4e re>%ired to $ontain the rise in le#el

#cti$ities a*ter T+ ca&e on barring


S."o #cti$it% to be &onitored
3he$7 !ot(ell le#el team enters the s"stem thro%gh

'e&arks
!ot(el le#el has the tenden$" to rise indefinitel" ? monitor the le#el $ontin%o%sl". a. $lose TDBFPs + a%: steam #al#es 4. $lose !ot(el ma7e %p isolating #al#e

3-.

a. A%: steam to TDBFPs drain 4. eal steam drain

3/. 42. 41. 42. 43. 44. 4&.

top one 3C P%mp top all the 3T Fans (it$h off all D P fields after 22 !rs of Boiler trip =f re>%ired #a$%%m $an 4e 7illed 3he$7 for an" oil lea7ages or fire or smo7e at T%r4ine 4earings 0 !P B"pass 0 eal steam #al#es Monitor the T%r4ine speed 3lose all the man%al isolating #al#es at *il ele#ations D P e#a$%ation sho%ld $ontin%e for 2- hrs of Boiler Trip 3omplete ash handling s"stem $an 4e stopped after 2- !rs of Boiler Trip 3

4'.

=t (as e:perien$ed that small >%antit" of ash left in the hoppers $ho7e the mo%th and gets hardened and $reate f%rther pro4lems in ne:t light %p

4,.

4-. 4/. &2. &1. &2.

M%lsifier s"stem on Transformers $an 4e $he$7ed after $ons%ltation (ith DMD 0 *FF site Mt$ 0 safet" 0 fire (ing *pen the isolators if the %nit (ill 4e sh%t do(n for more than 22 hrs 3hangeo#er PC F 3ontrol Fl%id P%mps

<T 0 EATs $an 4e $he$7ed

Remar7s : _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ ____

Stage 3: Unit Start , Up Checklist


-ate: Ti&e:

.. Just !e*ore &aintenance gi$e clearance *or boiler light up !oiler Side
S."o #cti$it% to be &onitored &3. 3he$7 all the PTC pending
&4.

'e&arks

*ff sites + Fire (ater 0 ash handling s"stem 0 D P all passes 0 et$ + a#aila4le 0 in ser#i$e

&&.

< A one p%mp B 0 T< D3C A t(o p%mpsB are in ser#i$e 3ooling (ater is 3harged for all the a%:iliaries li7e =D ; FD ; PA ; Mills ;

&'.

&,.

.%4e oil s"stem for =D ; FD ; PA ; Mills a%:iliaries is in ser#i$e and filters are $lean 4

&-. &/. '2.

3he$7 AP!s for a$t%al rotation from lo$al F air motor is in normali1ed $ondition $anner air fan is r%nning and header Pr. )ormal ? G 2&2 mm B%rner Tilt !ori1ontal Boiler e:pansion indi$ating rods are in position

'1.

'2. '3. '4. '&. ''. ',.

=nstr%ment F er#i$e air press%res are ade>%ate $raper $on#e"or and $lin7er grinder are a#aila4le for ser#i$e tro%gh seal o#er flo( is *5 D$o hoppers + spool pie$es are repla$ed and normali1ed. Dns%re all the manholes and peep holes of the Boiler are $losed A#aila4le mills are 7ept normali1ed ele$tri$all" and me$hani$all"

&

S."o (/.
'/.

#cti$it% to be &onitored
tart !F* heating and raise the !F* temG1222 3 Dns%re Tra$ing 0 atomi1ing steam in normali1ed $ondition and lines at oil ele#ations are hot. ! ; R! spra" #al#es normali1ed Dns%re !P B"pass spra" man%al #al#e is 7ept $losed Dns%re Pre?$leaned g%ns are p%t in 4oiler ele#ations M ; 3BD ; ! sampling points are normalised 3BD man%al #al#es at Dr%m and DF ele#ation are 7ept open Boiler $orners fire prote$tion s"stem is in ser#i$e 5eep Dr%m le#el man%al #ents and ! header drains open %ffi$ient $hemi$als in the dosing tan7s H .P F !P dosing p%mps are a#aila4le Boiler is lined %p for filling thro%gh fill p%mp All DR6s motori1ed isolating #al#es are in open $ondition Cet?la" p%mp lined %p to 4e r%n along (ith 4oiler fill?p%mp AP! soot 4lo(ing is in lined %p $ondition AP! + oil $arr"o#er pro4e is 7ept after $leaning 0 .ights are glo(ing in $old end side 3AP! isolating #al#es are 7ept open Atomi1ing steam line 0 tra$ing steam are in $harged $ondition tat%s of Prote$tions li7e Dr%m le#el ; Reheater All .R B F (all Blo(ers in retra$ted $ondition + $he$7ed from lo$al

'e&arks

,2. ,1. ,2. ,3. ,4. ,&. ,'. ,,. ,-. ,/. -2. -1. -2. -3. -4. -&. -'. -,. --.

'

T+ Side
S."o 1.
2. 3. 4. &. '. ,. -. /. 12. 11. 12. 13. 14. 1&. 1'. 1,. 1-. 1/. 22. 21.

#cti$it% to be &onitored
T< on 4arring and T%r4ine l%4e oil press%re is *.5. =f ne$essar" .%4e oil filter 3hange o#er and stand 4" got $leaned < 0 T< D3C and AR3C p%mps are in ser#i$e (ith P!D. Boiler 0 T< D3C tan7 le#els + *5 M*T 0 FRF 0 BFPs + oil le#els are *5 All $oolers li7e M*T ; 3.F. ; BFPs ; <as ; D:$iter ; Primar" (ater ; eal oil in $harged $ondition Primar" (ater al7al"ser is in ser#i$e F $ond%$ti#it" normal Both The 3C passes are in $harged $ondition T(o 3C p%mps are in ser#i$e All the a#aila4le 3T Fans are p%t in ser#i$e <o#erning ra$7 is in normali1ed $ondition (ith D!3 isolating #al#es in open $ondition *n D!3 $onsole + Pl%nger $oil s%ppl" *) 0 .oad $ontroller *) 3he$7 all the man%al isolating #al#es pro#ided in the t%r4ine side drains are in open $ondition A#aila4le BFPs are 7ept normali1ed T%r4ine top and $ontrol #al#es + gagging is in remo#ed $ondition A 3.F. #al#es are normali1ed B M*T 0 TDBFP A 0 B H 3ontrol Fl%id H * T #apor e:ha%sters are in ser#i$e 3he$7 all the T< 4earings ret%rn oil flo( 0 #a$%%m *.5. All DM Ma7e %p p%mps a#aila4le in$l%ding 3 T p%mps Both 3PEs are in ser#i$e Darth (it$hes +<T ; EATs are in open $ondition <T ; EAT $oolers are on a%to

'e&arks
..* Pr 9

S."o ...
23. 24. 2&. 2'. 2,. 2-. 2/. 32. 31. 32. 33.

#cti$it% to be &onitored
%ppl" to all the B%ses !T 0 .T is a#aila4le .P dosing p%mps read" to 4e r%n along (ith BFP %ffi$ient 3*2 3"linders are $onne$ted to manifold <enerator 3asing !"drogen press%re is ade>%ate + 3.2 5s$ Fire prote$tion s"stems for transformers and $a4le galleries is in ser#i$e .ist of Prote$tions 7ept 4"passed Critten $learan$e from PP 0 RM 0 3F= 0 TM 0 A!M 0 DM in $omm%ni$ation register Boiler 0 T< PF= $he$7s as per .M= $ompleted 3he$7 M*T 0 FRF Tan7 .e#els

'e&arks

3. !oiler light Up to S%nchroni0ation


S."o #cti$it% To be 1onitored 1. AP! oot 4lo(ing is in progress
2. 3. 4. &. '.

'e&arks

3AP! is 7ept in ser#i$e Air and Fl%e gas o%t let temperat%res of AP!s are normal D$o re$ir$%lation 6al#es *pen 3he$7 for oil falling in slag 4ath Dr%m metal temperat%res Top 0 Bottom Dearator Pegging steam $harged + after an" BFP is 7ept in ser#i$e F Press%re and Temperat%res are *5 +3.& 5s$ F G122Deg 3he$7 T%r4ine speed (hile $harging !P 0 .P B"?pass 3he$7 ? .oad referen$e sho%ld 4e at '3 MC as per logi$ on a%to (hile rolling thro%gh ATR 5eep PRMa: A load limiter B at G 2&2MC 3BD is 7ept open 3he$7 !ot(ell ; Dearator ;Dr%m le#els ; !F* 0 ! D press%res !P 0 .P dosing done as per re>%irement Rate of rise of parameters M T 0 !R! (ith in limits + 2& 0 12 Deg 3 per min. Both the #a$%%m p%mps are in ser#i$e 3he$7 for an" oil lea7ages or fire or smo7e at T%r4ine 4earings 0 !P B"pass 0 eal steam #al#es *pen !P B"pass spra" man%al #al#e A at Dr%m press%re G 12 5s$ B 0 4efore I%st ta7ing mill in ser#i$e eal air fan too7 tart along (ith PA Fan and dis$harge Press%re ade>%ate D P fields are p%t in ser#i$e after =st mill is p%t in ser#i$e <RP ?? all rela"s are a#aila4le H D3 s%ppl" *5 <RP + generator prote$tions normali1ed H <RP rela"s reset /

,.

-. /. 12. 11. 12. 13. 14. 1&. 1'.

1,.

1-. 1/. 22. 21.

22. 23. 24. 2&.

)ote do(n D0A ; !ot(el le#els )ote do(n $ondenser 6a$%%m 5eep all the T%r4ine side drains open 4efore starting T%r4ine rolling Roll one TDBFP and 7eep it r%nning in re$ir$%lation

12

S."o #cti$it% To be 1onitored .(. Both =D F FD Fans in ser#i$e


2,. 2-. 2/. 32. 31. 32. 33. 34. 3&. 3'. 3,.

'e&arks

<ate #al#e gearing sho%ld $lose at T%r4ine speed G 242 RPM All @*Ps sho%ld stop at T%r4ine speed G &42RPM !P e#a$%ation #al#e sho%ld $lose at T%r4ine speed G 2-&2 RPM Critten $learan$e from 3hemist for T%r4ine rolling Both sets of fans to 4e in ser#i$e 4efore s"n$hronisation 3he$7 seal air fan too7 start on a%to along (ith PA Fan and dis$harge header press%re G 12&2mm 3he$7 !P B"pass 0 seal steam area for an" oil spillage 0 Fire 3he$7 seal air fan too7 start along (ith PA fan and dis$harge press%re ade>%ate

D3 @*P has to 4e stopped man%all" at T%r4ine speed G &42 RPM

Press%re 9

11

2. Unit Just S%nchronised S."o 1.


2. 3. 4. &. '. ,. -. /. 12. 11. 12. 13. 14. 1&.

#cti$it% To be 1onitored
<T Fans are r%nning + $he$7 lo$all" and see for an" $ooler tro%4le alarm in <enerator alarm .6 D:$itation is on AET* and at Enit" Po(er Fa$tor =n$rease load set point A if re>%ired B 3lose all MA. drains 3lose the se$ond 42256 4rea7er. Carn a4o%t the do%4tf%l mills (hi$h ma" in$rease the temperat%res rapidl" All the heaters .P! 2 ; 3 ; D0A and e:tra$tion #al#e to TDBFPs are $harged )ote do(n D0A ; !ot(el le#els )ote do(n $ondenser 6a$%%m 5eep the 3R! header drain open for some more time. All the T%r4ine side drains are $losed 6entilation #al#e $losed on a%to + Dlse $lose it man%all" 3lose !P 0 .P 4"pass after $he$7ing R! prote$tion in the s$heme.

'e&arks

3. Checklist be*ore crossing .45 o* the 6oad


S."o 1.
2. 3. 4. &. '. ,. -. /. 12. 11.

#cti$it% To be 1onitored

'e&arks

!P T%r4ine top 0 Bottom temperat%re differen$e 8 12Deg =P Front 0 Rear ??top 0 4ottom temp differen$e less than 12 Deg eal steam and lea7 off $ontrollers on a%to All .P!s are in $harged $ondition tart se$ond TDBFP rolling and p%t in ser#i$e 3he$7 Margins G 12Deg al(a"s 3he$7 !P D:ha%st temperat%re 3he$7 R! press%re 3orresponding (ith the load %ppl" $hange o#er from station to EATs. Bet(een 1&2MC to 2&2 MC 3harge !P! at load G 142 MC 12

12. 13. 14.

(. Just !e*ore 7il Support is 8ithdrawn 9: (4 5 o* the 6oad;


S."o #cti$it% To be 1onitored All the flame s$anners sensing flame 1.
2. 3. 4. &. '. ,. -. /. 12. 11. 12. 13. 14. 1&. 1'. 1,.

'e&arks

D P is $harged and in ser#i$e AP! oot 4lo(ing stopped 3AP! is isolated Mill reIe$ts $leaning is in progress Bottom ash is normal 3BD sili$a 0 DPR are monitored 3he$7 all the le#el $ontrollers li7e Dr%m ; !*TCD. 0 Dearator ; PC ; 3F ; ..* ; <as temp are on a%to All the !P heaters are in ser#i$e Mills and =D fan .%4e oil press%res are *.5. Both TDBFPs are in ser#i$e and on a%to a4o#e 2&2 MC
Fill )ormal .og sheet after oil s%pport (ithdra(n

Cater (all soot Blo(ing G ,&J load 3he$7 Margins G 2&Deg al(a"s 3he$7 all prote$tions are p%t in ser#i$e

Remar7s: _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____

<ara&eters to be sub&itted *or 7'T 'eport


13

.)o Parameter 1. 2. 3. 4. &. '. ,. -. /. 12. 11. 12. 13. 14. 1&. 1'. 1,. 1-. 1/. 22. 21. 22. 23. 24. 2&. 2'. 2,. Dr%m Press%re M press%re Dr%m metal temperat%re M T 0 !R! !R! steam press%re ! spra" R! spra" Total air flo( *il g%ns in ser#i$e Mills 0 3oal flo( Boiler ili$a 3ondenser 6a$%%m T< 4arring peed T%r4ine A:ial shift !PT DD =PT DD .PT DD !PT AD =PT AD !PT $asing temp Top 0 Bottom =PT Front $asing Temp T0B =PT rear $asing Temp T0B !PT rotor temp =PT rotor temp Ma: T< 4earing temp Ma: T< shaft 6i4ration Ma: T< Bearing 6i4

Before Boiler .ight Ep

After 3harging !P 0 .P B"pass

At oa7ing peed of 3'2 RPM

At 322RPM or @%st After s"n$hr.

Timings of Different A$ti#ities A An" dela" (ith reasons to 4e mentionedB


.)o 1 2 A$ti#it" Boiler .ight Ep *il <%n pro4lems AB 1 AB 2
14

Timing 0 remar7s

AB 3 AB 4 3D 1 3D 2 3D 3 3D 4 3oal Mills A B 3 3 D D F 4 & ' , / 12 11 !P 0 .P B"pass 3garging oa7ing at 3'2 RPM oa7ing at 3222 RPM "n$hronisation *il s%pport Cith? dra(n All prote$tions normalised ; if 4"passed 4efore F%ll .oad 3BD 3losed

!oiler Filling = >%drotest Checklist


9 <rechecks be*ore >%drotest ;

Date : __________ Time : ___________


S."o
1. 2.

#cti$it% to be &onitored
3learan$e a#aila4le from BMD? PP All persons are remo#ed from inside the 1&

'e&arks

3. 4. &. '. ,. -. /. 12. 11. 12. 13. 14. 1&.

Boiler A 1st and 2nd passesB All persons are remo#ed from Bottom ash0D$o hopper area Boiler fill p%mp a#aila4le Dr%m and Bottom Ring header manhole doors 4o:ed %p !"drastep 0 Dr%m le#el transmitters are in normali1ed $ondition. T< on 4arring + prefera4l" .o$al 4ig dial press%re ga%ges are fitted at Dr%m le#el A .! 0 R! B E3B dr%m press%re 0 M press%re indi$ations are a#aila4le Boiler sh%toff #al#es and their =B6s $losed ! DR6 man%al #al#es $losed. ! DR6 $ontrol s(it$hes in E3B are 7ept in *ff position 3BD #al#es at $ontrol station A'&M. B in $losed $ondition. DBD #al#es $losed <C3 p%mps Motor $a#it" fl%shing and filling done M 03R! 0 !R! header drains open on t%r4ine side. 3 T le#elG &m

1'

S."o
1'. 1,. 1-.

#cti$it% to be &onitored
BFP ? ! spra" man%al #al#es $losed BFP ? R! spra" man%al #al#es $losed !P 4"pass spra" man%al #al#e $losed 3C $harged; D3C and AR3C s"stem in ser#i$e. At least one 3DP in ser#i$e or A3 seal (ater p%mp in ser#i$e for pro#iding seal (ater to BFP main p%mps Boiler feed p%mp a#aila4le + prefera4l" MDBFP .P dosing s"stem a#aila4le and p%t in ser#i$e as soon as starting of MDBFP. Feed (ater s"stem $harged %pto FR De aerator filled and le#el normal Cet la" p%mp a#aila4le BFP 3 re$ir$%lation #al#e air #al#e to 4e

'e&arks

1/.

.ine %p D3C for BFP .%4 oil; (or7ing oil; BP me$h. seal and MDBFP motor $oolers

22.

21. 22. 23. 24. 2&.

3harged from feed (ater side and seal (ater line %p for main p%mp.

2'.

7ept $losed. This (ill ens%re re$ir$%lation #al#e to remain in open $ondition thro%gh o%t the test.

1,

!oiler Filling = >%dro test 9>%dro Test <rocedure;


S."o 1. ..
3. 4. &. '. ,. -. /. 12. 11. 12.

#cti$it% to be &onitored
3lose Boiler master drain to =BD tan7 *pen ! fill0drain header indi#id%al #al#es in 3D ele#ation 3lose ! fill0drain header final drain #al#e to =BD tan7. .ine %p BR!; D3* and ! filling #al#es R! filling #al#e al(a"s remain in $losed $ondition + remain it in $lose $ondition. Dr%m #ents open ! man%al #ent #al#es; start %p #ents open. tart 4oiler fill p%mp and $lose re$ir$%lation 3lose Dr%m #ents after thoro%gh #enting 3lose ! man%al #ents after thoro%gh #enting 3lose ! start %p #ents after thoro%gh #enting Afrom E3BB top 4oiler fill p%mp and $lose 4oiler fill #al#e. tart MDBFP and Press%ri1e 4oiler slo(l" K & 5s$ per min%te AMa:B Press%ri1e 4oiler %pto re>%ired test press%re A 2125s$B slo(l" Red%$e BFP dis$harge press%re to 122 5s$ 0 Trip MDBFP ?? as per re>%irement + and note do(n press%re drop

'e&arks

Dns%re 3%rrent is 82-2 Amps 4" throttling dis$harge #al#e. )ormall" ta7es 42 Min to 1 hr.

Allo( 4oiler press%ri1ation %pto , 5 3.

13.

14.

1&.

5eep R03 #al#e f%ll open !old at 122 ? 142 5 3 dr%m press%re till BMD?PP gags all Dr%m and ! safet" #al#es. !old at this press%re for the time d%ration as per re>%irement A generall" 2 min%tesB After 1 min:_______________ After 2 min:_______________ After 3 min:_______________ After 4 min:_______________ After & min:_______________ After 12 min:_______________

1'.

Boiler $an 4e de ? press%ri1ed 4" opening drains in sampling station.

1-

Defe$ts d%ring ATR Rolling tep 1. 2. 3. 4. &. '. ,. -. /. 12. 11. 12. 13. 14. 1&. 1'. 1,. 1-. 1/. 22. 21. 22. 23. 24. 3riteria )%m4ers Remar7s

Ma: haft and Bearing Pedestal 6i4rations d%ring Rolling


haft 0 Bearing Pedestal Ma: rea$hed T%r4ine peed

1/

*4ser#ations 0 Defe$ts 0 $ope for impro#ement d%ring tart %p till f%ll load
_____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ ___ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ ___ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ ___ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ ___

F%ll .oad =mportant Parameters for *RT .)o 1. Time F date 22 Parameter Design 6al%e A$t%al

2. 3. 4. &. '. ,. -. /. 12. 11. 12. 13. 14. 1&. 1'. 1,. 1-. 1/. 22. 21.

.oad M6AR Dr%m Press%re Throttle team Press%re =st tage Press%re 3ondenser #a$%%m 0 Ba$7 Press%re M T !R! Feed Cater *0. temp at !P! *0. F D$o =0. M Flo( FC Flo( ! pra" R! pra" Fl%e <as temperat%re =0. F *0. of AP! A F B Fl%e <as temperat%re =0. F *0. of PAP! A F B 3C =nlet 3C o%tlet <enerator tator 3%rrent

&22 MC 2 1-- 5s$ 1,2 5s$ 1&1.,2 5s$ ,' MM &3, 23 &3, 23 2&3., 23 1&42.2 1&42.2 2 2 133 23 133 23 32.2 23 42.-' 23 1'.2 5A