0% found this document useful (0 votes)
20 views

PM Report.18th Marcht

The daily report summarizes the status of various work items on the NCT Back-up Project as of March 19, 2011. It includes updates on dredging and sand procurement, installation of PVD points, production of interlocking blocks, relocation of railway lines and electric lines, WASA pipe relocation, electrical work, drain work, and comments from a site visit by BRTC, BUET and CPA officials. It notes work completed on several items and work planned for the coming days, and identifies one action needed from the head office to accelerate drainage pipe production by providing more molds.

Uploaded by

Mahibul Hasan
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views

PM Report.18th Marcht

The daily report summarizes the status of various work items on the NCT Back-up Project as of March 19, 2011. It includes updates on dredging and sand procurement, installation of PVD points, production of interlocking blocks, relocation of railway lines and electric lines, WASA pipe relocation, electrical work, drain work, and comments from a site visit by BRTC, BUET and CPA officials. It notes work completed on several items and work planned for the coming days, and identifies one action needed from the head office to accelerate drainage pipe production by providing more molds.

Uploaded by

Mahibul Hasan
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

Daily Report of NCT Back-up Project March 19, 2011

ISSUE NUMBER 001: DREDGING AND SAND PROCUREMENT STATUS: Hopefully today will get new Dredger. WORK DONE: New pipe line installation completed. PBL got the permission of Dredging from CPA. WORK TOBE DONE IN COMING DAYS: Hopefully dredge filling will commence from tomorrow. ACTION NEEDED FROM HEAD OFFICE:

ISSUE NUMBER 002: PVD DRIVING STATUS: PVD Installation on progress. WORK DONE: p to !"th #arch"$!!% total PVD point & !'()$ Nos. WORK TOBE DONE IN COMING DAYS: ACTION NEEDED FROM HEAD OFFICE:

ISSUE NUMBER 003: INTERLOCKING BLOCK PRODUCTION STATUS: Production on !'th #arch"$!!*+(,$ Nos WORK DONE: WORK TOBE DONE IN COMING DAYSACTION NEEDED FROM HEAD OFFICE:

ISSUE NUMBER 004a: RAILWAY RELOCATION STATUS: Administrati.e Permission on Progress. WORK DONE: WORK TOBE DONE IN COMING DAYS: ACTION NEEDED FROM HEAD OFFICE:

Daily Report of NCT Back-up Project March 19, 2011


ISSUE NUMBER 004b: ELECTRIC HT LINE RELOCATION STATUS: Drawing appro.al and Administrati.e permission on progress. WORK DONE: WORK TOBE DONE IN COMING DAYS: ACTION NEEDED FROM HEAD OFFICE: ISSUE NUMBER 004 : WASA RELOCATION STATUS: Administrati.e permission on progress. WORK DONE: /e0uired pipes for relocation gathered on site. Pipe sample has sent to B 12 for 2est. WORK TOBE DONE IN COMING DAYS: ACTION NEEDED FROM HEAD OFFICE:

ISSUE NUMBER 00!: ELECTRICAL WORK ON THE NCT PRO"ECT STATUS: WORK DONE: WORK TOBE DONE IN COMING DAYS: ACTION NEEDED FROM HEAD OFFICE:

ISSUE NUMBER 00#: DRAIN WORK STATUS: Drain wor3 on progress in 4oth side 5western and south side6 Drain wor3 may 4e stopped due to indecision of alignment of property line. WORK DONE: WORK TOBE DONE IN COMING DAYS: ACTION NEEDED FROM HEAD OFFICE:

"

Daily Report of NCT Back-up Project March 19, 2011


ISSUE NUMBER 00$: COMMENTS FROM BRTC% BUET&CPA !)th #arch B/2C% B 12 team .isited to the site- Prof.Dr.Iasin Prof.Dr.7hariful. 8e su4mit se.eral issues to B/2C team and they pro.ided their decision!6 8e informed them that in purpose of 7urcharge material% we want to use ($$ mm sand at 4ottom and soil% de4ris material for remaining 99$$mm.But they are not agree a4out the matter. "6 2hey are also disagreeing with our plan% where we wanted to preloading at a small portion. 2hey clearly said% preloading will 4e for a segment at a time. +6 A4out Interloc3ing Bloc3% we appeal to consider a correction factor as per British 7tandard. 2hey note the matter and said that soon they will notify us. 96 At the case of Drainage pipe 2est% they informed us that% re0uired strength did not found. ISSUES NUMBER 00': RCC D(a)*a+, P)-, STATUS: Production of Drainage pipe on progress. WORK DONE: WORK TOBE DONE IN COMING DAYS: ACTION NEEDED FROM HEAD OFFICE: 2o accelerate production of /CC Drainage pipe% we need more mould 5!$$$mm : +$$mm dia.6