Daily Program Mayl-2012
Daily Program Mayl-2012
Segment-1A 1 Yard Drainage 2 Lean Concrete 3 Sub-station Building 4 5 6 RTG Track Service Area Cable Trench work
Remarks
Bricks work & Plastering Thai glass work of window. Rebar binding & Shuttering Wall casting of Electric Pit & Reffer DB.
Segment-2A 1 Yard Drainage 2 Manhole & Gully hole 3 Cable Trench work Segment-1 1 Surcharge 2 Yard Drainage Segment-2 1 Surcharge Segment-3 1 Dismantling Segment-4 1 Surcharge Segment-4A 1 Ground Improvement Navy Area 1 Surface drain work 2 Cable Line Installation 3 1 1 1 Main gate Column Work Bracing Interlocking Block Boundary Wall
Surcharge material removing Earth excavation Settlement Record Existing pavement dismantling Settlement Record Sub-grade Preparation
Surcharge material removing in progress. Earth excavation in progress. Settlement Record in progress. Existing pavement dismantling in progress. Settlement Record in progress. Sub-grade Preparation in progress.
Shutter removing Pre-cast bracing casting (10 Nos) Compressive strength test / ILB Rebar binding & Shuttering executed. Compressive strength test / ILB
Open Deep Drain Laboratory / Field Test Bank Protection work 1 Sheet Pile Interlocking Block Production (ILB) ILB Production.
NCT BACK-UP PROJECT, CHITTAGONG Work Program of May 8,2012 S.l. Description No.
Segment-1A 1 Yard Drainage 2 Lean Concrete 3 Sub-station Building 4 5 6 RTG Track Service Area Cable Trench work
Remarks
Bricks work & Plastering Thai glass work of window. Lean mix concrete. Rebar binding & Shuttering Top slab casting
Bricks work & Plastering in progress. Thai glass work of window in progress. Lean mix concrete in progress. Rebar binding & Shuttering in progress Rebar binding & Shuttering executed.
Segment-2A 1 Yard Drainage 2 Manhole & Gully hole 3 Cable Trench work Segment-1 1 Surcharge 2 Yard Drainage Segment-2 1 Surcharge Segment-3 1 Dismantling Segment-4 1 Surcharge Segment-4A 1 Ground Improvement Navy Area 1 Surface drain work 2 Cable Line Installation 3 1 1 Main gate Bracing Interlocking Block Open Deep Drain
Surcharge material removing Earth excavation Settlement Record Existing pavement dismantling Settlement Record Sub-grade Preparation
Surcharge material removing in progress. Earth excavation in progress. Settlement Record in progress. Existing pavement dismantling in progress. Settlement Record in progress. Sub-grade Preparation in progress.
Cable laying
Laboratory / Field Test Bank Protection work 1 Sheet Pile Interlocking Block Production (ILB) ILB Production.
NCT BACK-UP PROJECT, CHITTAGONG Work Program of May 9,2012 S.l. Description No.
Segment-1A 1 Yard Drainage 2 Lean Concrete 3 Sub-station Building 4 5 6 RTG Track Service Area Cable Trench work
Remarks
Bricks work & Plastering Thai glass work of window. Lean mix concrete (18 Mpa) Rebar binding & Shuttering Wall casting
Bricks work & Plastering in progress. Thai glass work of window in progress. Lean mix concrete in progress. Rebar binding & Shuttering in progress Rebar binding & Shuttering executed.
Segment-2A 1 Yard Drainage 2 Manhole & Gully hole 3 Cable Trench work Segment-1 1 Surcharge 2 Yard Drainage Segment-2 1 Surcharge Segment-3 1 Dismantling 2 Ground Improvement Segment-4 1 Surcharge Segment-4A 1 Ground Improvement Navy Area 1 Surface drain work 2 Cable Line Installation 3 1 1 Main gate Bracing Interlocking Block Open Deep Drain Laboratory / Field Test
Surcharge material removing Earth excavation Settlement Record Existing pavement dismantling Sub-grade Preparation Settlement Record Sub-grade Preparation
Surcharge material removing in progress. Earth excavation in progress. Settlement Record in progress. Existing pavement dismantling in progress. Sub-grade Preparation in progress. Settlement Record in progress. Sub-grade Preparation in progress.
Cable laying
Dismantling Work 1 Boundary Wall Dismantling work 2 Existing Road Road cutting & Removal Interlocking Block Production (ILB) ILB Production
NCT BACK-UP PROJECT, CHITTAGONG Work Program of May 10,2012 S.l. Description No.
Segment-1A 1 Yard Drainage 2 Lean Concrete(Yard) 3 Sub-station Building 4 RTG Track 5 Service Area 6 Cable Trench work 7 RMG Track Segment-2A 1 Yard Drainage 2 Manhole & Gully hole 3 Cable Trench work Segment-1 1 Surcharge 2 Yard Drainage Segment-2 1 Surcharge Segment-3 1 Dismantling 2 Ground Improvement Segment-4 1 Surcharge Segment-4A 1 Ground Improvement Navy Area 1 Surface drain work 2 Cable Line Installation 3 1 1 Main gate Bracing Interlocking Block Compressive strength test / ILB Compressive strength test / ILB Dismantling work in progress. Road cutting & Removal in progress. Open Deep Drain Laboratory / Field Test Dismantling Work 1 Boundary Wall Dismantling work 2 Existing Road Road cutting & Removal Interlocking Block Production (ILB) ILB Production
Remarks
Bricks work & Plastering Thai glass work of window. Lean mix concrete (18 Mpa) Concrete Pouring (02 Nos block) Wall casting Concrete Pouring (02 Nos span) Pipe laying & CC casting Wall casting of 01 Nos Gully hole.
Bricks work & Plastering in progress. Thai glass work of window in progress. Lean mix concrete in progress. Rebar binding & Shuttering executed. Rebar binding & Shuttering executed.
Surcharge material removing Earth excavation Settlement Record Existing pavement dismantling Sub-grade Preparation Settlement Record Sub-grade Preparation
Surcharge material removing in progress. Earth excavation in progress. Settlement Record in progress. Existing pavement dismantling in progress. Sub-grade Preparation in progress. Settlement Record in progress. Sub-grade Preparation in progress.
Cable laying
NCT BACK-UP PROJECT, CHITTAGONG Work Program of May 11,2012 S.l. Description No.
Segment-1A 1 Yard Drainage 2 Lean Concrete(Yard) 3 Sub-station Building 4 RTG Track 5 Service Area 6 Cable Trench work 7 RMG Track Segment-2A 1 Yard Drainage 2 Manhole & Gully hole 3 Cable Trench work Segment-1 1 Surcharge 2 Yard Drainage Segment-2 1 Surcharge Segment-3 1 Dismantling 2 Ground Improvement Segment-4 1 Surcharge Segment-4A 1 Ground Improvement Navy Area 1 Surface drain work 2 Cable Line Installation 3 1 1 Main gate Bracing Interlocking Block Compressive strength test / ILB Compressive strength test / ILB Dismantling work in progress. Road cutting & Removal in progress. ILB Production in progress (11200 Nos) Open Deep Drain Laboratory / Field Test Dismantling Work 1 Boundary Wall Dismantling work 2 Existing Road Road cutting & Removal Interlocking Block Production (ILB) 1 ILB Production
Remarks
Bricks work & Plastering Rebar binding & Shuttering work. Rebar binding & Shuttering work. Concrete Pouring (02 Nos span) Pipe laying & CC casting
Bricks work & Plastering in progress. Lean mix concrete executed. Wall casting executed Rebar binding & Shuttering executed. Pipe laying & CC casting in progress Wall casting of 01 No Gully hole.
Surcharge material removing Earth excavation Settlement Record Existing pavement dismantling Sub-grade Preparation Settlement Record Sub-grade Preparation
Surcharge material removing in progress. Earth excavation in progress. Settlement Record in progress. Existing pavement dismantling in progress. Sub-grade Preparation in progress. Settlement Record in progress. Sub-grade Preparation in progress.
NCT BACK-UP PROJECT, CHITTAGONG Work Program of May 19,2012 S.l. Description No.
Segment-1A 1 Sub-base work 2 Lean Concrete(Yard) 3 Sub-station Building 4 RTG Track 5 Service Area 6 Cable Trench work 7 RMG Track Segment-2A 1 Yard Drainage 2 Manhole & Gully hole 3 Cable Trench work Segment-1 1 Yard Drainage Segment-2 1 Surcharge Segment-3 1 Dismantling
Remarks
RCC pipe laying in progress. Settlement Record in progress. Existing pavement dismantling in progress. Sub-grade Preparation in progress. Settlement Record in progress. Sub-grade Preparation in progress.
2 Ground Improvement Sub-grade Preparation Segment-4 1 Surcharge Settlement Record Segment-4A 1 Ground Improvement Sub-grade Preparation Navy Area 1 Surface drain work 2 Cable Line Installation 3 1 1 Navy Boundary wall Bracing Interlocking Block Compressive strength test / ILB Navy boundary wall dismantling. Open Deep Drain Laboratory / Field Test
Dismantling Work 1 Boundary Wall 2 Existing Road Road cutting & Removal Interlocking Block Production (ILB) 1 ILB Production
Road cutting & Removal in progress. ILB Production in progress (10460 Nos)