Daily Program May-2011
Daily Program May-2011
Remarks
Open Drain (Western end) Concrete pouring of 1st lift PVD 300mm sand Blanket 150 mm Local sand lay Segment 1 Pre-cast Pile PVD driving at Segment-2A Coarse sand dumping at Segment-2A (part) Target Quantity =30 truck Top soil Removal for Sub grade Preparation. Welding & Shuttering work for Pre-cast Pile.
Due to Friday Driving work Performed Coarse sand dumping at Segment-2A (part) in progress Actually layed=14 truck Top soil Removing in progress Welding & Shuttering work for Pre-cast Pile in progress. No work Interlocking Block=4100 Nos half day Due to Friday Dredge Sand supply is not available
Yard drainage ( RCC Pipe) 15 Nos Interlocking Block Interlocking Block=5000 Nos
Sub Contractor (Md.Mubarak) is not agree to work on Friday Executed new Trial Mix brought by Shahidul Islam(Head office),needed 2 hours to perform it
9 10
Remarks
4 5 6 7 8
Segment 4 (part) Culvert (rail) RCC pipe Interlocking Block Dismantling work
Clearing & Grubbing. Rebar fabrication Concrete pouring ILB plant shift CC/RCC Dismantling work at Segment 3 & 4
Remarks
Culvert (rail)
7 8 9
Concrete pouring ILB plant shift CC/RCC Dismantling work at Segment 3 & 4
Concrete pouring in progress ILB plant shift in progress CC/RCC Dismantling work at Segment 3 & 4 in progress
Remarks
2 3 4 5 6 7
Segment 2A (part) Segment 1 (part) Segment 4 (part) Culvert (road) Open Deep Drain Culvert (rail)
300mm Sand Blanket filling Clearing & Grubbing. Clearing & Grubbing. Base Concrete Casting Bracing Concrete Pouring Rebar fabrication Earth Excavation
300mm Sand Blanket filling in progress Clearing & Grubbing in progress. Clearing & Grubbing in progress. Rebar binding in progress.
8 9 10
Concrete pouring ILB plant shift CC/RCC Dismantling work at Segment 3 & 4
Concrete pouring in progress ILB plant shift in progress CC/RCC Dismantling work at Segment 3 & 4 in progress
Remarks
2 3 4 5 6 7
Segment 2A (part) Segment 1 (part) Segment 4 (part) Culvert (road) Open Deep Drain Culvert (rail)
300mm Sand Blanket filling Clearing & Grubbing. Clearing & Grubbing. Rebar binding & Shuttering of wall. Bracing Concrete Pouring Rebar fabrication Earth Excavation
8 9 10
Concrete pouring ILB plant shift CC/RCC Dismantling work at Segment 3 & 4
Concrete pouring in progress ILB plant shift in progress CC/RCC Dismantling work at Segment 3 & 4 in progress
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 01 February, 2011
Segment 2A
PVD driving Coarse sand laying for 200 mm sand Blanket Sand filling work Sand filling work in progress Top soil Removing in progress Welding & Shuttering work for Pre-cast Pile in progress. Concrete pouring for RCC Pipe in progress. Regular Production of Interlocking Block on going.
3 4 5 6 7 8 9
Top soil Removed for Sub grade Preparation. Welding & Shuttering work for Pre-cast Pile.
Yard drainage ( RCC Pipe) Concrete pouring for RCC Pipe Interlocking Block Dismantling work Lab test Dredging work Regular Production of Interlocking Block. CC/RCC Dismantling work at Segment 3 & 4 Compressive Strength test. Dredging work
Regular Production of Block on going Compressive strength test for C30 Dredging work on going
Project Manager
Project Manager
Project Manager
Project Manager
Project Manager
Project Manager
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 08 January, 2011
3 4 5 6 7
Segment 3 (Part) Dismantling work Interlocking Block Lab test Dredging work
1.Top soil Removed for Sub grade Preparation. CC/RCC Dismantling work at Segment 3 & 4 Regular Production of Interlocking Block. Compressive Strength test, FDT Dredging work CC/RCC Dismantling work at Segment 3 & 4 in progress Regular Production of Interlocking Block on going. Compressive Strength test of Interlocking Block Dredging work on going
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 09 January, 2011
1.Shuttering work for wall 2nd lift at Ch 0+605 to 0+645 = 40m in 1.Concrete pouring for wall 1st lift at Ch 0+625 to 0+645 = 20m B/S progress. 1.PVD Driving. 2.Sand filling work 1. PVD Driving in progress. 2. Sand filling work in progress
3 4 5 6 7
Segment 3 (Part) Dismantling work Interlocking Block Lab test Dredging work
1.Top soil Removed for Sub grade Preparation. CC/RCC Dismantling work at Segment 3 & 4 Regular Production of Interlocking Block. Compressive Strength test, FDT Dredging work CC/RCC Dismantling work at Segment 3 & 4 in progress Regular Production of Interlocking Block on going. Compressive Strength test of Interlocking Block, FDT. Dredging work on going
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 10 January, 2011
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 11 January, 2011
Sand filling work on progress Top soil Removing on progress CC/RCC Dismantling work at Segment 3 & 4 on progress Regular Production of Interlocking Block on going. Compressive Strength test of Interlocking Block. Dredging work on going Coarse sand dumping on Segment 1A & 2A.
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 12 January, 2011
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 13 January, 2011
2 3 4 5 6 7 8 9
Segment 1A Segment 1A & 2A Segment 1 Dismantling work Interlocking Block Lab test Dredging work Coarse sand
PVD driving Sand filling work Top soil Removed for Sub grade Preparation. CC/RCC Dismantling work at Segment 3 & 4 Regular Production of Interlocking Block. Compressive Strength test, FDT Dredging work Coarse sand laying on Segment 1A & 2A.
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 14 January, 2011
2 3 4 5 6 7 8 9
Segment 1A Segment 1A & 2A Segment 1 Dismantling work Interlocking Block Lab test Dredging work Coarse sand
PVD driving Sand filling work Top soil Removed for Sub grade Preparation. CC/RCC Dismantling work at Segment 3 & 4 Regular Production of Interlocking Block. Compressive Strength test, FDT Dredging work Coarse sand laying on Segment 1A & 2A.
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 15 January, 2011
2 3 4 5 6 7 8 9
Segment 1A Segment 1A & 2A Segment 1 Dismantling work Interlocking Block Lab test Dredging work Coarse sand
PVD driving Sand filling work Top soil Removed for Sub grade Preparation. CC/RCC Dismantling work at Segment 3 & 4 Regular Production of Interlocking Block. Compressive Strength test, FDT Dredging work Coarse sand laying on Segment 1A & 2A.
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 16 January, 2011
2 3 4 5 6 7 8 9
Segment 1A Segment 2A Segment 1 Dismantling work Interlocking Block Lab test Dredging work Coarse sand
PVD driving Sand filling work Top soil Removed for Sub grade Preparation. CC/RCC Dismantling work at Segment 3 & 4 Regular Production of Interlocking Block. Compressive Strength test, FDT Dredging work Coarse sand laying on Segment 1A & 2A.
PVD driving on progress. Sand filling work on progress Top soil Removing on progress CC/RCC Dismantling work at Segment 3 & 4 on progress Regular Production of Interlocking Block on going. Compressive Strength test of Interlocking Block, FDT. Dredging work on going Coarse sand dumping on Segment 1A & 2A.
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 24 January, 2011
3. Earth excavation for Open drain South side on progress. Reinforcement febrication for RCC Pipe PVD driving on progress. Sand filling work on progress Top soil Removing on progress CC/RCC Dismantling work at Segment 3 & 4 on progress Regular Production of Interlocking Block on going. Compressive Strength test of Interlocking Block, FDT. Dredging work on going
2 3 4 5 6 7 8 9 10
Yard drainage ( RCC Pipe) Concrete pouring for RCC Pipe Segment 2A Segment 2A Segment 1 Dismantling work Interlocking Block Lab test Dredging work Coarse sand PVD driving Sand filling work Top soil Removed for Sub grade Preparation. CC/RCC Dismantling work at Segment 3 & 4 Regular Production of Interlocking Block. Compressive Strength test, FDT Dredging work Coarse sand laying on Segment 1A & 2A.
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 28 January, 2011
2 3 4 5 6 7 8 9 10
Yard drainage ( RCC Pipe) Concrete pouring for RCC Pipe Segment 2A Segment 2A Segment 1 Dismantling work Interlocking Block Lab test Dredging work Segment 1A PVD driving Sand filling work Top soil Removed for Sub grade Preparation. CC/RCC Dismantling work at Segment 3 & 4 Regular Production of Interlocking Block. Compressive Strength test. Dredging work Coarse sand laying (200 mm Sand Blanket)
Regular Production of Interlocking Block on going. Compressive Strength test of Interlocking Block. Dredging work on going Coarse sand laying (200 mm Sand Blanket) in progress.
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 28 January, 2011
2 3 4 5 6 7 8 9 10
Yard drainage ( RCC Pipe) Concrete pouring for RCC Pipe Segment 2A Segment 2A Segment 1 Dismantling work Interlocking Block Lab test Dredging work Segment 1A PVD driving Sand filling work Top soil Removed for Sub grade Preparation. CC/RCC Dismantling work at Segment 3 & 4 Regular Production of Interlocking Block. Compressive Strength test. Dredging work Coarse sand laying (200 mm Sand Blanket)
Regular Production of Interlocking Block on going. Compressive Strength test of Interlocking Block. Dredging work on going Coarse sand laying (200 mm Sand Blanket) in progress.
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 28 January, 2011
2 3 4 5 6 7 8 9 10
Yard drainage ( RCC Pipe) Concrete pouring for RCC Pipe Segment 2A Segment 2A Segment 1 Dismantling work Interlocking Block Lab test Dredging work Segment 1A PVD driving Sand filling work Top soil Removed for Sub grade Preparation. CC/RCC Dismantling work at Segment 3 & 4 Regular Production of Interlocking Block. Compressive Strength test. Dredging work Coarse sand laying (200 mm Sand Blanket)
Regular Production of Interlocking Block on going. Compressive Strength test of Interlocking Block. Dredging work on going Coarse sand laying (200 mm Sand Blanket) in progress.
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 28 January, 2011
2 3 4 5 6 7 8 9 10
Yard drainage ( RCC Pipe) Concrete pouring for RCC Pipe Segment 2A Segment 2A Segment 1 Dismantling work Interlocking Block Lab test Dredging work Segment 1A PVD driving Sand filling work Top soil Removed for Sub grade Preparation. CC/RCC Dismantling work at Segment 3 & 4 Regular Production of Interlocking Block. Compressive Strength test. Dredging work Coarse sand laying (200 mm Sand Blanket)
Regular Production of Interlocking Block on going. Compressive Strength test of Interlocking Block. Dredging work on going Coarse sand laying (200 mm Sand Blanket) in progress.
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 28 January, 2011
2 3 4 5 6 7 8 9 10
Yard drainage ( RCC Pipe) Concrete pouring for RCC Pipe Segment 2A Segment 2A Segment 1 Dismantling work Interlocking Block Lab test Dredging work Segment 1A PVD driving Sand filling work Top soil Removed for Sub grade Preparation. CC/RCC Dismantling work at Segment 3 & 4 Regular Production of Interlocking Block. Compressive Strength test. Dredging work Coarse sand laying (200 mm Sand Blanket)
Regular Production of Interlocking Block on going. Compressive Strength test of Interlocking Block. Dredging work on going Coarse sand laying (200 mm Sand Blanket) in progress.
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 29 January, 2011
Segment 2A
PVD driving Coarse sand laying for 200 mm sand Blanket Sand filling work
3 4 5 6 7 8 9
Top soil Removed for Sub grade Preparation. Reinforcement febrication & Shuttering work for Pre-cast Pile.
Yard drainage ( RCC Pipe) Concrete pouring for RCC Pipe Interlocking Block Dismantling work Lab test Dredging work Regular Production of Interlocking Block. CC/RCC Dismantling work at Segment 3 & 4 Compressive Strength test. Dredging work Compressive Strength test of Interlocking Block. Dredging work on going Regular Production of Interlocking Block on going.
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 30 January, 2011
Segment 2A
PVD driving Coarse sand laying for 200 mm sand Blanket Sand filling work
Sand filling work in progress Top soil Removing in progress Reinforcement febrication & Shuttering work for Pre-cast Pile.
3 4 5 6 7 8 9
Top soil Removed for Sub grade Preparation. Welding & Shuttering work for Pre-cast Pile.
Yard drainage ( RCC Pipe) Concrete pouring for RCC Pipe Interlocking Block Dismantling work Lab test Dredging work Regular Production of Interlocking Block. CC/RCC Dismantling work at Segment 3 & 4 Compressive Strength test. Dredging work Compressive Strength test of Interlocking Block. Dredging work on going Regular Production of Interlocking Block on going.
Remarks
4 5 6 7 8
Segment 4 (part) Culvert (rail) RCC pipe Interlocking Block Dismantling work
Clearing & Grubbing. Rebar fabrication Concrete pouring ILB plant shift CC/RCC Dismantling work at Segment 3 & 4
Remarks
4 5
Culvert (rail)
7 8 9
Concrete pouring ILB plant shift CC/RCC Dismantling work at Segment 3 & 4
Concrete pouring in progress ILB plant shift in progress CC/RCC Dismantling work at Segment 3 & 4 in progress
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 01 February, 2011
Segment 2A
PVD driving Coarse sand laying for 200 mm sand Blanket Sand filling work Sand filling work in progress Top soil Removing in progress Welding & Shuttering work for Pre-cast Pile in progress. Concrete pouring for RCC Pipe in progress. Regular Production of Interlocking Block on going.
3 4 5 6 7 8 9
Top soil Removed for Sub grade Preparation. Welding & Shuttering work for Pre-cast Pile.
Yard drainage ( RCC Pipe) Concrete pouring for RCC Pipe Interlocking Block Dismantling work Lab test Dredging work Regular Production of Interlocking Block. CC/RCC Dismantling work at Segment 3 & 4 Compressive Strength test. Dredging work
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 01 February, 2011
Segment 2A
PVD driving Coarse sand laying for 200 mm sand Blanket Sand filling work Sand filling work in progress Top soil Removing in progress Welding & Shuttering work for Pre-cast Pile in progress. Concrete pouring for RCC Pipe in progress. Regular Production of Interlocking Block on going.
3 4 5 6 7 8 9
Top soil Removed for Sub grade Preparation. Welding & Shuttering work for Pre-cast Pile.
Yard drainage ( RCC Pipe) Concrete pouring for RCC Pipe Interlocking Block Dismantling work Lab test Dredging work Regular Production of Interlocking Block. CC/RCC Dismantling work at Segment 3 & 4 Compressive Strength test. Dredging work
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 02 February, 2011
Segment 2A
PVD driving Coarse sand laying for 200 mm sand Blanket Sand filling work Coarse sand laying for 200 mm sand Blanket Sand filling work in progress Top soil Removing in progress Welding & Shuttering work for Pre-cast Pile in progress. Concrete pouring for RCC Pipe in progress. Regular Production of Interlocking Block on progress.
3 4 5 6 7 8 9
Top soil Removal for Sub grade Preparation. Welding & Shuttering work for Pre-cast Pile.
Yard drainage ( RCC Pipe) Concrete pouring for RCC Pipe Interlocking Block Dismantling work Lab Test/Field Test Dredge work Regular Production of Interlocking Block. CC/RCC Dismantling work at Segment 3 & 4 Compressive Strength test. Dredge work
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 03 February, 2011
Segment 2A
PVD driving Coarse sand laying for 200 mm sand Blanket Sand filling work Coarse sand laying for 200 mm sand Blanket in progress Sand filling work in progress Top soil Removing in progress Welding & Shuttering work for Pre-cast Pile in progress. Concrete pouring for RCC Pipe in progress. Regular Production of Interlocking Block on progress. CC/RCC Dismantling work at Segment 3 & 4 in progress Compressive Strength test of Interlocking Block. Dredge work on going
3 4 5 6 7 8 9
Top soil Removal for Sub grade Preparation. Welding & Shuttering work for Pre-cast Pile.
Yard drainage ( RCC Pipe) Concrete pouring for RCC Pipe Interlocking Block Dismantling work Lab Test/Field Test Dredge work Regular Production of Interlocking Block. CC/RCC Dismantling work at Segment 3 & 4 Compressive Strength test. Dredge work
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program of 04 February, 2011
Remarks
2 3 4 5 6 7 8
PVD 200 mm Coarse sand lay 150 mm Local sand lay Segment 1 Pre-cast Pile
PVD driving =1000 Point 40 truck Target Quantity =30 truck Top soil Removal for Sub grade Preparation. Welding & Shuttering work for Pre-cast Pile.
Due to Friday Driving work Performed half day Due to Friday Dredge Sand supply is not available
Yard drainage ( RCC Pipe) 15 Nos Interlocking Block Interlocking Block=5000 Nos
Sub Contractor (Md.Mubarak) is not agree to work on Friday Executed new Trial Mix brought by Shahidul Islam(Head office),needed 2 hours to perform it
9 10
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program of 06 February, 2011
Remarks
Open Drain (Country Side) Rebar fabrication and shuttering of Bracing 2 3 4 5 6 7 8 PVD 200 mm Coarse sand lay 150 mm Local sand lay Segment 1 Pre-cast Pile PVD driving =1000 Point 30 Truck Target Quantity =30 truck Top soil Removal for Sub grade Preparation. Welding & Shuttering work for Pre-cast Pile.
Shortness of Fuel
Yard drainage ( RCC Pipe) 10 Nos Interlocking Block Interlocking Block=5000 Nos
9 10
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program of 08 February, 2011
Remarks
Open Drain (Country Side) Rebar fabrication and shuttering of Bracing 2 3 4 5 6 7 8 PVD PVD driving
200 mm Coarse sand layer Sand lay 150 mm Local sand layer Segment 1 Pre-cast Pile Sand lay Top soil Removal for Sub grade Preparation. Welding & Shuttering work for Pre-cast Pile.
Yard drainage ( RCC Pipe) 10 Nos Interlocking Block Interlocking Block=5000 Nos
9 10
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program of 13th February, 2011
Remarks
Open Drain (Country Side) Earth excavation,Soling,CC work 2 3 4 5 6 7 8 PVD PVD driving
200 mm Coarse sand layer Sand lay 150 mm Local sand layer Segment 1 Pre-cast Pile Sand lay Top soil Removal for Sub grade Preparation. Welding & Shuttering work for Pre-cast Pile.
Yard drainage ( RCC Pipe) Concrete Pouring . Interlocking Block Interlocking Block=5000 Nos
9 10
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 28 December 2010
3 4 7 8
Dismantling work Interlocking Block Mix Design and Sampling Dredging work
CC/RCC Dismantling work at Segment 3 & 4 Regular Production of Block Compressive Strength test for C30 and C40 Dredge work in progress
Project Manager
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 13 December 2010
3 4 5 6 7 8
Dismantling work Interlocking Block Pre-cast Piling work Survey work Mix Design and Sampling Dredging work
CC/RCC Dismantling work at Segment 3 & 4 Curing and Strength Testing for the Block of Trial Production,Trial Mix Concrete pouring Yard Drainage Compressive Strength test for C30 and C40 Dredging work
CC/RCC Dismantling work at Segment 3 & 4 Strength check for trial mix
Project Manager
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 14 December 2010
3 4 5 6 7 8
Dismantling work Interlocking Block Pre-cast Piling work Survey work Mix Design and Sampling Dredging work
CC/RCC Dismantling work at Segment 3 & 4 Curing and Strength Testing for the Block of Trial Production,Trial Mix Concrete pouring Yard Drainage Compressive Strength test for C30 and C40 Dredging work
CC/RCC Dismantling work at Segment 3 & 4 Strength check for trial mix
Project Manager
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 15 December 2010
3 4 5 6 7 8
Dismantling work Interlocking Block Pre-cast Piling work Survey work Mix Design and Sampling Dredging work
CC/RCC Dismantling work at Segment 3 & 4 Curing and Strength Testing for the Block of Trial Production,Trial Mix Concrete pouring Yard Drainage Compressive Strength test for C30 and C40 Dredging work
CC/RCC Dismantling work at Segment 3 & 4 Strength check for trial mix Concrete pouring (09) Nine number
Project Manager
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 16 December 2010
3 4 5 6 7 8
Dismantling work Interlocking Block Pre-cast Piling work Survey work Mix Design and Sampling Dredging work
CC/RCC Dismantling work at Segment 3 & 4 Curing and Strength Testing for the Block of Trial Production,Trial Mix Concrete pouring Yard Drainage Compressive Strength test for C30 and C40 Dredging work
CC/RCC Dismantling work at Segment 3 & 4 Strength check for trial mix Concrete pouring (06) Six number
Project Manager
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 17December 2010
3 4 5 6 7 8
Dismantling work Interlocking Block Pre-cast Piling work Survey work Mix Design and Sampling Dredging work
CC/RCC Dismantling work at Segment 3 & 4 Curing and Strength Testing for the Block of Trial Production,Trial Mix Concrete pouring Yard Drainage Compressive Strength test for C30 and C40 Dredging work
Project Manager
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 18 December 2010
3 4 5 6 7 8
Dismantling work Interlocking Block Pre-cast Piling work Survey work Mix Design and Sampling Dredging work
CC/RCC Dismantling work at Segment 3 & 4 Curing and Strength Testing for the Block of Trial Production,Trial Mix Concrete pouring Yard Drainage Compressive Strength test for C30 and C40 Dredging work
CC/RCC Dismantling work at Segment 3 & 4 Strength check for trial mix
Project Manager
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 19 December 2010
3 4 5 6 7 8
Dismantling work Interlocking Block Pre-cast Piling work Survey work Mix Design and Sampling Dredging work
CC/RCC Dismantling work at Segment 3 & 4 Curing and Strength Testing for the Block of Trial Production,Trial Mix Concrete pouring Yard Drainage Compressive Strength test for C30 and C40 Dredging work
CC/RCC Dismantling work at Segment 3 & 4 Strength check for trial mix Concrete pouring (05) Five number
Project Manager
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 20 December 2010
3 4 5 6 7 8
Dismantling work Interlocking Block Pre-cast Piling work Survey work Mix Design and Sampling Dredging work
CC/RCC Dismantling work at Segment 3 & 4 Curing and Strength Testing for the Block of Trial Production,Trial Mix Concrete pouring Yard Drainage Compressive Strength test for C30 and C40 Dredging work
Project Manager
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 21 December 2010
3 4 5 7 8
Dismantling work Interlocking Block Pre-cast Piling work Mix Design and Sampling Dredging work
CC/RCC Dismantling work at Segment 3 & 4 Curing and Strength Testing for the Block of Trial Production,Trial Mix Concrete pouring (06) Six Nos, Per Pile lenhth=15.00m Compressive Strength test for C30 and C40 Dredging work
Project Manager
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 22 December 2010
3 4 5 7 8
Dismantling work Interlocking Block Pre-cast Piling work Mix Design and Sampling Dredging work
CC/RCC Dismantling work at Segment 3 & 4 Curing and Strength Testing for the Block of Trial Production,Trial Mix Concrete pouring (06) Six Nos, Per Pile length =15.00m Compressive Strength test for C30 and C40 Dredging work
Project Manager
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 23 December 2010
3 4 5 7 8
Dismantling work Interlocking Block Pre-cast Piling work Mix Design and Sampling Dredging work
CC/RCC Dismantling work at Segment 3 & 4 Curing and Strength Testing for the Block of Trial Production,Trial Mix Concrete pouring (06) Six Nos, Per Pile length =15.00m Compressive Strength test for C30 and C40 Dredging work
CC/RCC Dismantling work at Segment 3 & 4 Strength Testing for the Block of Trial Production,Trial Mix Concrete pouring (04) Four Nos, Per Pile length =15.00m
Project Manager
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 24 December 2010
3 4 5 7 8
Dismantling work Interlocking Block Pre-cast Piling work Mix Design and Sampling Dredging work
CC/RCC Dismantling work at Segment 3 & 4 Curing and Strength Testing for the Block of Trial Production,Trial Mix Concrete pouring (06) Six Nos, Per Pile length =15.00m Compressive Strength test for C30 and C40 Dredging work
CC/RCC Dismantling work at Segment 3 & 4 Strength Testing for the Block of Trial Production,Trial Mix
Project Manager
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 25 December 2010
3 4 5 7 8
Dismantling work Interlocking Block Pre-cast Piling work Mix Design and Sampling Dredging work
CC/RCC Dismantling work at Segment 3 & 4 Curing and Strength Testing for the Block of Trial Production,Trial Mix Concrete pouring (03) Three Nos, Per Pile length =15.00m Compressive Strength test for C30 and C40 Dredging work
CC/RCC Dismantling work at Segment 3 & 4 Strength Testing for the Block of Trial Production,Trial Mix Concrete pouring (08) Eight Nos, Per Pile length =15.00m
Project Manager
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 26 December 2010
3 4 5 7 8
Dismantling work Interlocking Block Pre-cast Piling work Mix Design and Sampling Dredging work
CC/RCC Dismantling work at Segment 3 & 4 Curing and Strength Testing for the Block of Trial Production,Trial Mix
Concrete pouring (03) Three Nos, Per Pile length =15.00m Compressive Strength test for C30 and C40 Dredging work Dredging work on going
Project Manager
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 27 December 2010
3 4 7 8
Dismantling work Interlocking Block Mix Design and Sampling Dredging work
CC/RCC Dismantling work at Segment 3 & 4 Regular Production of Block will be start Compressive Strength test for C30 and C40 Dredging work
Project Manager
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 28 December 2010
3 4 7 8
Dismantling work Interlocking Block Mix Design and Sampling Dredging work
CC/RCC Dismantling work at Segment 3 & 4 Regular Production of Block Compressive Strength test for C30 and C40 Dredge work in progress
Project Manager
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 29 December 2010
3 4 7 8
Dismantling work Interlocking Block Mix Design and Sampling Dredging work
CC/RCC Dismantling work at Segment 3 & 4 Regular Production of Block Compressive Strength test for C30 and C40 Dredge work in progress
Project Manager
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 30 December 2010
3 4 7 8
Dismantling work Interlocking Block Mix Design and Sampling Dredging work
CC/RCC Dismantling work at Segment 3 & 4 Regular Production of Block Compressive Strength test for C30 and C40 Dredge work in progress
Project Manager
PROJECT BUILDERS LIMITED (PBL) NCT BACK-UP PROJECT, CHITTAGONG Work Program for 31 December 2010
3 4 7 8
Dismantling work Interlocking Block Mix Design and Sampling Dredging work
CC/RCC Dismantling work at Segment 3 & 4 Regular Production of Block Compressive Strength test for C30 and C40 Dredge work in progress
Project Manager