0% found this document useful (0 votes)
133 views2 pages

Eohsms 02 c23 Loa Riggerman

1) The document is a letter of appointment for a contractor lifting riggerman for a factory project. 2) As the rigger, it is the appointee's duties and responsibilities to ensure compliance with regulations and statutory requirements regarding lifting operations. 3) The duties of the rigger include checking slings and loads, determining load weights, directing crane movement safely with signals, and reporting any issues.

Uploaded by

Hassan Abdullah
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
133 views2 pages

Eohsms 02 c23 Loa Riggerman

1) The document is a letter of appointment for a contractor lifting riggerman for a factory project. 2) As the rigger, it is the appointee's duties and responsibilities to ensure compliance with regulations and statutory requirements regarding lifting operations. 3) The duties of the rigger include checking slings and loads, determining load weights, directing crane movement safely with signals, and reporting any issues.

Uploaded by

Hassan Abdullah
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

Ryobi Kiso (S) Pte Ltd

Letter Of Appointment
Appointment Of Contractor Lifting Riggerman

Project:

Factory No:

I _____________________________________________(name) ID No : _____________________(NRIC/ EP/WP) contact number _______________________of ___________________________________________(company) __________________________________________________________________________________ (work title) un!er"tan!

t#at a" t#e Rigger of t#e Pro$ect work"ite it i" my !utie" an! re"pon"ibilitie" to en"ure t#at t#e pro%i"ion" un!er t#e Re&ulation" an! 'tatutory re(uirement are complie! wit#) *y !utie" an! re"pon"ibilitie" a" Rigger are a" follow": +) En"ure attire! in "uc# a way a" woul! !i"tincti%ely i!entify a" Ri&&er) ,) C#eck t#e "lin&" to be u"e! for "lin&in& t#e loa!" to en"ure t#at t#e "lin&" are of &oo!

con"truction "oun! an! "uitable material an! a!e(uate "tren&t# an! free from patent !efect)
-) En"ure t#at an a!e(uate number of le&" of t#e "lin& are u"e! an! t#at t#e "lin&in& an&le

i" correct "o a" to pre%ent t#e "lin& from bein& o%erloa!e! !urin& t#e #oi"tin&)
.) /"certain t#e wei&#t of t#e loa! w#ic# i" to be fitte! an! inform t#e Crane 0perator of

t#e wei&#t of t#e loa!)


1) En"ure t#at only proper liftin& &ear" are u"e! in con$unction wit# t#e "lin&) 2) En"ure t#at t#e loa! to be fitte! i" "ecure "table an! balance!) 3) En"ure t#at any loo"e loa! inclu!in& "tone brick" or tile" i" place! in a receptacle to

pre%ent t#e loa! or part t#ereof from fallin& !urin& t#e liftin& operation)
4) Place a!e(uate pa!!in& at t#e e!&e" of t#e loa! w#ic# come in contact wit# t#e "lin& "o

a" to pre%ent t#e "lin& from bein& !ama&e!)


5) Report any !efect in t#e liftin& &ear to t#e 6iftin& 'uper%i"or) +7) /ttac#in& an! !etac#in& t#e loa! to an! from t#e crane loa! liftin& attac#ment) ++) Initiatin& an! !irectin& t#e "afe mo%ement of t#e crane) 8#i" re"pon"ibility "#oul! be

taken by only one "i&nalman at any one time)


+,) /t lea"t one 'i&nalman "#oul! be %i"ible to t#e crane !ri%er at all time" to &i%e

continuou" "i&nal")

W#ere au!io or %i"ual met#o!" are u"e!

any failure of t#e

e(uipment or met#o!" u"e! mu"t be ma!e known to t#e !ri%er imme!iately)


Appointed by Ryobi Kiso PM: Endorsed By Ryobi Kiso !"O: Name De"i&natio n 'i&nature Date : : : : Accepted By :

Name De"i&nati on 'i&nature Date

: : : :

Name De"i&nati on 'i&nature Date

: : : :
Page 1 of 1

EOHSMS-02-C23_Rev0

Ryobi Kiso (S) Pte Ltd


NOTE: A COPY OF RELEVANT CERTIFICATE TO BE ATTACHED

EOHSMS-02-C23_Rev0

Page 1 of 1

You might also like