TE Meter

The document is a technical evaluation report that assesses bids submitted for coriolis flow meters. It lists 7 bidders and indicates whether each was found technically responsive or not. The main reasons for rejection included a lack of authorization letters, failure to quote required components like companion flanges or spare parts, non-compliance with specifications around mass flow accuracy and operating conditions, and not confirming certifications for custody transfer or welding. Only the bid submitted by Endress+Hauser through their representative Speedy Automation was found to meet all technical requirements without issues.

Uploaded by

rudrakr
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
37 views2 pages

TE Meter

The document is a technical evaluation report that assesses bids submitted for coriolis flow meters. It lists 7 bidders and indicates whether each was found technically responsive or not. The main reasons for rejection included a lack of authorization letters, failure to quote required components like companion flanges or spare parts, non-compliance with specifications around mass flow accuracy and operating conditions, and not confirming certifications for custody transfer or welding. Only the bid submitted by Endress+Hauser through their representative Speedy Automation was found to meet all technical requirements without issues.

Uploaded by

rudrakr
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

')

Technical Evaluation Report


PROC-FE/CB/PROD-804/2013 S. No. Bidder Name Technically Responsive (Yes/No)
Products Lahore No

Reasons for Rejection

~
1) Non-provision of Original Authority letter from manufacturer (Endress & Hauser Switzerland) in favour of Principal M/s Industrial Products FZC UAE. (Unsigned quote from M/s Descon UAE was submitted for the coriolis meter of manufacturer Endress & Hauser Switzerland, who is authorized dealer for sale & services in UAE only) 2) Companion flanges not quoted (Material deviation). 1) Non-provision of Original Authority letter from manufacturer in favour of Principal. 2) Two year recommended spares not quoted (Material deviation). 3) Non-provision of material, pressure & calibration tests with each meter 4) Custody transfer approval with each meter is not confirmed. 5) PT +RT Welding seam certificate with each meter is not confirmed.

Mis Industrial Pakistan

FZC, UAE clo Mis Inpro Limited,

Mis Beijing CSR Metallurgical Machinary Co. Ltd., China clo Mis PetrofloTrading Islamabad Company,

No

M/s Eximp International Inc., USA clo M/s Friends Enterprises, Islamabad M/s Industrial Equipment Services, Canada c/o MIs I.E Services Pvt. Ltd., Islamabad

Yes

I
\

No

M/s Interman Trading FZE Dubai, UAE c/o MIs M.K International Islamabad

No

1) Companion flanges not quoted (Material Deviation). 2) Two year recommended spares not quoted (Material Deviation) .. 3) Non-provision of pressure & calibration tests with each meter 4) Custody transfer not confirmed/quoted. 5) PT +RT Weldinq seam certificates not confirmed/quoted. 1) Deviation in mass flow accuracy wrt tender specs. (Specification deviation) 2) Companion flanges not quoted (Material deviation). 3) Non-compliance in provision of Mass flow accuracy of + - 0.05% (Specification deviation) 4) Two year recommended spares not quoted (Material deviation). 5) Non-provision of material, pressure & calibration tests with each meter 6) Custody transfer not confirmed/quoted. 7) PT +RJ Welding seam certificates not confirmed/quoted. I

~(I1r
FAiSAL QAYYU"~
OV. Chief Engineer

PDMS Officer (Prod.)

Oil Gas Dev Company Ltd.


IslalllJbad

Ext; 2803

I'

t)

Technical Evaluation Report


PROC-FE/CB/PROD-804/2013 5. No. Bidder Name Technically Responsive (Yes/No)
No

Reasons for Rejection

t
I

M/s Dongying Jintan Petroleum, China c/o M/s Total Dynamic System Pvt. Ltd. , Karachi

1) Deviation in provision of power supply of 24VDC as against the requirement of 220/240 VAC (Specification Deviation). 2) Deviation in ambient temperature rating wrt tender specs (Specification deviation). 3) Non-compliance in provision of Mass flow accuracy of + - 0.05% (Specification deviation) 4) Two year recommended spares not quoted (Material deviation). 5) Non-provision of material, pressure & calibration tests with each meter 6) Custody transfer not quoted. 7) PT +RT Welding seam certificates not confirmed/quoted. 8) Non-compliance of IP67, NEMA 4x
\ I

M/s Endress+Hauser, Switzerland c/o M/s Speedy Automation, Islamabad

Yes

,
I

/fPf
FAISAL aAYYU~~

A~"\~~/H
M (Prod

AKHTIl
I

r.'
~ PDMS Officer (prod. Ext: 2803

Fecllities Ext. 2908

0.,.. Chief
I

Oil

Engineer Gas Oev Company L~J.


151 0> 11