Management of Change Form

The document is a management of change control form from Global Industries Ltd. that was approved on February 14, 2006 detailing a proposed change for an unnamed client project, including descriptions of the change, potential risks and impacts on schedule, cost, engineering, design, fabrication, installation, and procedures. Key stakeholders at Global and the client are required to approve the change by providing signatures and comments.

Uploaded by

seehari
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (3 votes)
1K views2 pages

Management of Change Form

The document is a management of change control form from Global Industries Ltd. that was approved on February 14, 2006 detailing a proposed change for an unnamed client project, including descriptions of the change, potential risks and impacts on schedule, cost, engineering, design, fabrication, installation, and procedures. Key stakeholders at Global and the client are required to approve the change by providing signatures and comments.

Uploaded by

seehari
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

GLOBAL INDUSTRIES LTD.

Approved By: AG

Doc. No. Page : Rev. No. Rev. Date Date Printed

FRM-0801 Page 1 of 2 01 02/14/06

MANAGEMENT OF CHANGE CONTROL FORM


Client:

4/17/2009

Change No. Title: Coordinator Description of Change:

Project No.

Risk Assessment:

Date Change Notification Approved (Attached): Impact on Schedule:

Impact on Cost (see estimate sheet attached)

Design Materials Fabrication Installation Others Total


Engineering & Design:

Function Testing:

GLOBAL INDUSTRIES LTD.


Approved By: AG

Doc. No. Page : Rev. No. Rev. Date Date Printed

FRM-0801 Page 2 of 2 01 02/14/06

MANAGEMENT OF CHANGE CONTROL FORM

4/17/2009

Installation Plan:

Training for Competent Use:

Modification to Procedure:

Global

Client

Date Sent:

Date Received:

Project Manager Approval

Project Manager Approval

Engineering Manager Approval

Comments

Comments

_____________________________ Senior VP Approval

____________________________________ VP Approval