Renovation of Existing Substations

Measures adopted under APDRP Phase III involve renovation of existing substations including replacement of electrical and civil items, construction of new 33/11kV substations, reconductoring of 11kV networks, and renovation of distribution transformers. The purpose is to enhance operational reliability, life expectancy, and safety of the system while improving voltage regulation, reducing losses, and catering to future load growth. System and consumer metering, administrative measures, and IT integration are also included.

Uploaded by

joydeep_d3232
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views

Renovation of Existing Substations

Measures adopted under APDRP Phase III involve renovation of existing substations including replacement of electrical and civil items, construction of new 33/11kV substations, reconductoring of 11kV networks, and renovation of distribution transformers. The purpose is to enhance operational reliability, life expectancy, and safety of the system while improving voltage regulation, reducing losses, and catering to future load growth. System and consumer metering, administrative measures, and IT integration are also included.

Uploaded by

joydeep_d3232
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

Sl no. 1.

Measures adopted Involvement under APDRP Phase III Renovation of existing Substations All -- nos. PSS Replacement of electrical items such as 33 & 11 includin. those K isolators! "A! 33 K #$% &' $% & S( ) fallin. under /r. $%! 11K $% *ith numerical rela's! 11 K 0in. have &een PI"$ $a&les &' +"P, $a&les etc. envisa.ed. Replacement of Station &atter' &ank & &atter' char.er Renovation3 reconstruction of earth mat & e2tension of earth mat *here ever re4uired Reinforcement3 replacement of 5ard & control room illumination Civil items : Repair & paintin. of &oundar' *all 3 ,2tension of the same *herever re4uired $ivil patch repair includin. roof treatment and indoor3outdoor paintin. of $ontrol room &uildin. ,2tension of control room &uildin. to accommodate installation of ne* 11K panels for feeder &ifurcation & future e2pansion provision Structural paintin. of 5ard items 1) nos. PSS includin. those fallin. under /r. 0in. have &een envisa.ed

Remarks Purpose i1 ,nhancement of operational relia&ilit' & life e2pectanc' of the s'stem. ii1 Renovation of earth mat ensures increased safet' to s'stem & human &ein.s. iii1 Improvement of .eneral illumination level for operational comfort & safet'. i1 Repair of dilapidated civil portions of the control room includin. roof treatment to prevent seepa.e durin. rain' seasons. ii1 ,2tension to care of future load .ro*th & feeder &ifurcation.

-.

7e* 33311K Su&stations *ith feedin. &a's and incomin. 33K lines & au.mentation of Po*er /ransformer

3.

11K 7e* overhead line *ith D#:! RA%%I/ & A%$ ;D#:1

16 nos. PSS Anticorrosive paintin. to have &een enhance life period of 'ard envisa.ed outdoor structures. 8 nos. ne* PSS i1 /o take care of ne* & -6) KM of feeders arisin. out of 33K line &ifurcation ii1 Strate.ic locations such as ad9acent to &order for &order road illumination iii1 /o increase relia&ilit' of do*nstream 11K net*ork &' virtue of option of parallel feed <=> KM i1 %ifurcation of 11K feeders to reduce volta.e re.ulation & ener.' loss *ithin permissi&le limits ii1 7e* line to feed ne* D/Rs

1 #( -

<.

Reconductorin. of 11K net*ork

)6> KM

=.

Renovation of D/R

38<< nos.

). 6. 8. ?.

7e* D/R of 1>>K A & )3K A & associated ne* "/ line "/ Phase conversion & reconductorin. S'stem & consumer Meterin. Administrative measures & I/ &lendin.

--> nos. 1-= KM "ot "ot

i1 Reduction of /ail end volta.e re.ulation *ithin permissi&le limit of ?@ ii1 $onse4uent reduction of s'stem loss due to enhanced cross section i1 Installation of 1-K "A & isolator on the primar' side of D/R to reduce D/R failure rate ii1 Installation of "/ $apacitor for R & pf improvement iii1 Installation of "/ M$$% kiosk ;*ith overload & short circuit protection1 to replace fuse cutout ,lectrification & future load .ro*th Reduction of "/ loss & improvement of relia&ilit' ,ner.' mana.ement & revenue increment Improvement of I/ infrastructure of $ircle & revenue mana.ement

- #( -