Cost Breakdown Sheet

This document is a schedule of values for a new school construction project. It provides details on the project such as the school district, architect, construction manager, location, size, budget, and estimated costs broken down by division for items like site work, concrete, masonry, metals, woods and plastics, thermals and moisture protection, doors and windows, finishes, specialties, equipment, furnishings, special construction, conveyances, mechanical and electrical work. The total estimated cost, or Guaranteed Maximum Price (GMP), is provided.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
589 views

Cost Breakdown Sheet

This document is a schedule of values for a new school construction project. It provides details on the project such as the school district, architect, construction manager, location, size, budget, and estimated costs broken down by division for items like site work, concrete, masonry, metals, woods and plastics, thermals and moisture protection, doors and windows, finishes, specialties, equipment, furnishings, special construction, conveyances, mechanical and electrical work. The total estimated cost, or Guaranteed Maximum Price (GMP), is provided.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Schedule of Values

SCHOOL FACILITIES BOARD SFB NC 600-06 School District SFB Project Number Architect Name CM @ Risk Name County Grade Configuration Square Footage Number of Buildings Student Capacity Acres of Land Permitting (Name of County/City) SFB Board Approved Budget Grand GMP (Total of $0.00 SFB Base Cost and District Cost) SFB Meeting Date: SD DD GMP
sq.ft. (enter only the number in F11)

NEW CONSTRUCTION SCHEDULE OF VALUES

District Funded SF: Construction Schedule (number of days): Prepared by: Prepared by Company: AW-Y AW-N #DIV/0! Other On-Site
Funding
(Adjacent Ways, etc.)

Total GMP incld. SFB, District & Adj. Ways SFB Cost per SF

#DIV/0! #DIV/0! District Cost

#DIV/0! SFB Base Cost

#DIV/0! Off-Site Adjacent Ways

Quantity Div 1 Div 2 GENERAL CONDITIONS SITE WORK site demolition/removal survey dust control drywells track off pads earthwork/mass excavation unusal site conditions lift station retaining walls import/export dirt stormwater/drainage asphalt/paving parking soil treatment site electrical striping/signage site concrete sidewalks site masonry site utilities septic system wells trash enclosures ballfield backstop site basketball courts sports fields chainlink fencing wrought iron fencing block fencing landscaping/irrigation Division 2 total BUILDING CONCRETE footings/walls slabs building rebar precast concrete Division 3 total BUILDING MASONRY masonry walls masonry columns stonework rebar Division 4 total

Cost per SFB Unit (no markup) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

#DIV/0! Div 3

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Div 4

$0.00

$0.00

$0.00

$0.00

Page 1 of 4

Schedule of Values
SFB Cost per SF

#DIV/0! SFB Base Cost

#DIV/0! District Cost

Quantity Div 5 METALS structural steel stairs metal decking architectural steel miscellaneous steel Division 5 total CARPENTRY rough carpentry structure wood decking finish carpentry millwork/casework plastic/glass fiber Division 6 total THERMAL/MOISTURE waterproofing/dampproofing building insulation membrane roofing foam roof metal roof roof shingles roof tiles general sheet metal roof accessories sprayed fireproofing firestopping roof expansion joint joint sealants Division 7 total DOORS/GLASS doors & frames hardware storefronts automatic doors overhead doors windows skylights curtain walls glass & glazing Division 8 total FINISHES stucco/EIFS systems
interior metal studs/gypsum board

Cost per SFB Unit (no markup)

#DIV/0! Other On-Site


Funding
(Adjacent Ways, etc.)

#DIV/0! Off-Site Adjacent Ways

#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

$0.00

$0.00

$0.00

$0.00

Div 6

$0.00

$0.00

$0.00

$0.00

Div 7

$0.00

$0.00

$0.00

$0.00

Div 8

$0.00

$0.00

$0.00

$0.00

Div 9

exterior metal stud framing decorative plaster acoustical ceilings ceramic tile resilient flooring carpet wood floors epoxy sealed floors sound panels painting fiberglass reinforced panels Division 9 total

$0.00

$0.00

$0.00

$0.00

Page 2 of 4

Schedule of Values
SFB Cost per SF

#DIV/0! SFB Base Cost

#DIV/0! District Cost

Quantity Div 10 SPECIALTIES visual display boards toilet partitions & accessories projection screens wall protection operable partitions/walls flagpoles cubicle track & curtain signage lockers fire exttinguishers & cabinets knox box awnings storage shelving Division 10 total EQUIPMENT stage curtain/equipment library equipment audio/visual equipment kitchen equipment sports/PE equipment playground equipment canopy/ramada bike racks floor safe Division 11 total Div 12 FURNISHINGS metal casework plastic laminate casework fume hoods auditorium seating window coverings Division 12 total SPECIAL CONST shelters metal buildings bleachers equipment/storage enclosures swimming pools surveillance/alarm Division 13 total CONVEYING elevators wheelchair lifts material handling Division 14 total MECHANICAL mechanical insulation fire protection/sprinklers plumbing fixtures water treatment HVAC - central plant HVAC - package units HVAC - split system HVAC - evaporative Division 15 total

Cost per SFB Unit (no markup)

#DIV/0! Other On-Site


Funding
(Adjacent Ways, etc.)

#DIV/0! Off-Site Adjacent Ways

#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

$0.00

$0.00

$0.00

$0.00

Div 11

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Div 13

$0.00

$0.00

$0.00

$0.00

Div 14

$0.00

$0.00

$0.00

$0.00

Div 15

$0.00

$0.00

$0.00

$0.00

Page 3 of 4

Schedule of Values
SFB Cost per SF

#DIV/0! SFB Base Cost

#DIV/0! District Cost

Quantity Div 16 ELECTRICAL electrical fire alarm system security system data cabling intercom communications/phone TV cabling exterior lighting generators Division 16 total SPECIAL SYSTEMS EMS Division 17 total Subtotal Contractor Fee Contactor Contingency Builders Risk/Liability Insurance Performance & Payment Bonds Sales Tax Subtotal

Cost per SFB Unit (no markup)

#DIV/0! Other On-Site


Funding
(Adjacent Ways, etc.)

#DIV/0! Off-Site Adjacent Ways

#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! $0.00 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! $0.00

$0.00

$0.00

$0.00

$0.00

Div 17

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00

$0.00

$0.00

$0.00

Grand Guaranteed Maximum Price (GMP)

$0.00

(Total of SFB Base Cost and District Cost)

Page 4 of 4