HDT Job List For AUG '08

This document provides a list of maintenance jobs for mechanical equipment planned for September 2008 at an HDTU plant. It includes 34 equipment items that will undergo tasks like tube side cleaning, internal inspection of vessels, replacement of demisters and filters. Scaffolding and thickness surveys are also scheduled for various heat exchangers and columns. The document notes that additional maintenance work may be added and lists of steam leaks and gland leakages requiring shutdown will be circulated later.

Uploaded by

Alex Lee
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
75 views3 pages

HDT Job List For AUG '08

This document provides a list of maintenance jobs for mechanical equipment planned for September 2008 at an HDTU plant. It includes 34 equipment items that will undergo tasks like tube side cleaning, internal inspection of vessels, replacement of demisters and filters. Scaffolding and thickness surveys are also scheduled for various heat exchangers and columns. The document notes that additional maintenance work may be added and lists of steam leaks and gland leakages requiring shutdown will be circulated later.

Uploaded by

Alex Lee
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

(REVISED) HDTU MAINTENANCE JOB LIST : SEPT 2008

MECHANICAL MAINTENANCE S. No. Tag No


09-EE-002 A&B 09-EE-003 A&B 09-EE-004 09-EE-007 09-EE-008 09-EE-009 09-EE-010 09-EE-014 09-LOC-001 A&B 09-LOC-002 A&B 09-CWC-01 A&B 09-CWC-02 A&B 09-VV-001 09-VV-002 09-VV-004 09-VV-005 09-VV-006 09-VV-014 09-VV-015 09-VV-016 09-VV-010 09-VV-011 09-VV-012 09-VV-013 09-VV-022

Description

Remarks
Tube side cleaning. Tube side cleaning Tube side cleaning. Tube side cleaning Tube side cleaning Tube side cleaning Tube side cleaning Tube side cleaning Tube side cleaning Tube side cleaning Tube side cleaning Tube side cleaning Demister to be cleaned Internal cleaning to be done. To be opened up for internal inspection of the vessels including mesh blankets to be done

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Hot Combined Exchanger Cold Combined Exchanger st MUGC 1 Stage Discharge Cooler Stripper Trim Condenser Product Trim Cooler Sour Gas Cooler Lean Amine Cooler BFW Cooler Lube Oil Cooler of 10-KA-RP-001 A&B Lube Oil Cooler of 10-KA-RP-002 A&B Water Cooler of 10-KA-RP-001 A&B Water Cooler of 10-KA-RP-002 A&B Feed Coalescer Feed Surge Drum HP Separator Flash Drum RGC Suction KOD Amine Absorber KOD Rich Amine Flash Drum Amine Regenerator Reflux Drum Product Coalescer Caustic Wash Tower Sand Filter Rock Salt Dryer Amine Sump Drum

24 25 26 27

09-EA-001 A/B/C/D 09-EA-002 09-EA-003 09-EA-001 A/B/C/D

Reactor Effluent Condenser (AFC) Stripper Condenser (AFC) Product Cooler (AFC) Reactor Effluent Condenser

Demister to be cleaned Caustic to be replaced Sand to be topped up Rock salt to be replenished. To be checked for leakages in view suspected water ingress during rainy season. External cleaning of the fins may be carried out. Tube side to be water washed from upstream of 09-EE-002A (detailed scheme will be provided nearer time). 1. Prior to shutdown, inspection of associated pipings, particularly overhead section, to be carried out and recommendation by Inspection dept., if any, may be liquidated. 2. Bottom most manhole to be opened up for inspection for 09-CC-001 and 09-CC-003 only and recommendation by Inspection dept., if any, may be liquidated. To be opened up and activated carbon and sand to be replaced,

28 29 30

09-CC-001 09-CC-002 09-CC-003

Stripper LP Amine Absorber Amine Regenerator

31

09-GN-003

Lean Amine Carbon Filter

32

09-FF-001

Combined feed heater

33

09-KA-RP-001A/B

Recycle gas compressors

34

09-KA-RP-002A/B

Make up gas compressors

35 36

09-CWP-PA-001 A&B 09-CWP-PA-002 A&B

RGC Cooling Water Pumps MUGC Cooling Water Pumps

37 38 39 40

09-LG-1405 09-LG-1604 09-LG-1703 Leaky valve replacement (3, #150, gate) 09-YS-013 A&B Modification of product sampling drain line Modification of 09-VV006 drain line 3FL-09-1822-F5A

Sight glass of 09-VV-004 (HP Separator) Sight glass of 09-VV-005 (Flash Drum) Sight glass of 09-VV-006 (RGC Suction KOD) Upstream isolation valve of 09-YS-029 (09CC-002 top) PSVs of 09-CC-001 (Stripper column) Presently under MOC stage Presently under MOC stage RGC discharge to flare

if reqd. 1. Cleaning of all burners including pilot burners. 2. Lowering of bottom manway to facilitate thickness survey and visual Inspection of tubes. 3. Liquidation of inspection recommendations, if any. Compressors cooling water tank including associated CW supply and return headers to be cleaned. Compressors cooling water tank including associated CW supply and return headers to be cleaned. 1. Suction strainers to be cleaned. 2. Lube oil to be changed, if reqd. 3. Other necessary PM jobs. Sight glasses are to be cleaned.

To be replaced.

41 42 43 44

To be replaced. Subject to approval of MOC Subject to approval of MOC In view of vibration in the line and weld crack on earlier occasion, DP test of weld joints of line no. 3-FL-09-1822-B6A1(F5A)-IS to be done.

INSTRUMENTATION
1 2 3 4 09-PV-1901 A&B 09-PV-2001 A&B 09-LT-1701 A,B & C and 09-LT-1702 Control valves 2 stage spillback control valves of MUGC A&B st 1 stage spillback control valves of MUGC A&B Level transmitters of 09-VV-006 (RGC Suction KOD) Stroke checking of all control valves will be done after unit shutdown.
nd

To be tuned. To be tuned. To be attended for malfunction. Control malfunction, if any, to be attended. Control valve tuning and greasing as per requirement to be carried out.

REFY. CIVIL
1 09-FF-001 Combined Feed Heater Scaffolding to be provided inside the heater for inspection of tubes.

09-EA-001 A/B/C/D 09-EA-002 09-EA-003

Reactor Effluent Condenser (AFC) Stripper Condenser (AFC) Product Cooler (AFC)

Scaffolding to be provided for thickness survey of Inlet / out let bends of the fin-fan coolers (AFCs).

INSPECTION
1 2 3 4 5 6 7 8 9 10 09-FF-001 09-VV-004 09-VV-005 09-VV-006 09-VV-014 09-VV-015 09-VV-016 09-CC-001 09-CC-002 09-CC-003 Combined Feed Heater HP Separator Flash Drum RGC Suction KOD Amine Absorber KOD Rich Amine Flash Drum Amine Regenerator Reflux Drum Stripper LP Amine Absorber Amine Regenerator Thickness survey and visual Inspection of tubes. Internal inspection of the vessels including mesh blankets to be done

11

3FL-09-1822-F5A

RGC discharge to flare

1. Prior to shutdown, inspection of associated pipings, particularly overhead section, to be carried out. 2. Inspection through bottom most manhole inspection for 09-CC-001 and 0-CC-003 only. In view of vibration in the line and weld crack on earlier occasion, DP test results of weld joints of line no. 3-FL-09-1822B6A1(F5A)-IS to be examined. Thickness survey of Inlet / out let bends of the fin-fan coolers to be done. Scaffolding required.

12

09-EA-001 A/B/C/D 09-EA-002 09-EA-003

Reactor Effluent Condenser (AFC) Stripper Condenser (AFC) Product Cooler (AFC)

Note :
1) Concerned dept may add any other jobs, which may be felt necessary please. Any new development nearer to s/d will be intimated please. 2) Though no major electrical or instrumentation jobs are presently envisaged, same (if any) shall be intimated nearer time. 3) List of steam leaks attending of which require unit shutdown, will be circulated nearer time. 4) List of gland leakage/ passing valves attending of which require unit shutdown, will be circulated nearer time.

*****