Warning Message: ALM ID-26202 Board Overload Possible Cause Analysis: 1. A large number of maintenance operations commands are running. 2. Board start of testing, tracing, information gathering tasks. 3. The board software to run exception. 4. Heavy traffic. Analysis Progress: First, there are not a large number of maintenance operations in this site. There are not testing, tracing and information-gathering tasks also; and it is normal when you query board state; possible cause is heavy traffic of WMPT triggered overload CPU board; Second, WMPT CPU load is mainly consumed NBAP signaling and resource allocation, SCPT message processing, NBAP measurement reports; OM (performance statistics, alarms, detection, etc.) which consumes roughly 20% CPU also if not a special operation.
2014-1-11
1 , 3
Internal
Third, check the original site alarms, recurring CPU Overloaded alarm. CPU load exceeds 90%.
AlmName CreateTime Parameter FaultBoard CPU Overloaded 2011-8-29 19:14 CPU Load Rate(%)=91; 0-0-7-0-WMPT CPU Overloaded 2011-8-29 19:21 CPU Load Rate(%)=90; 0-0-7-0-WMPT CPU Overloaded 2011-8-29 19:23 CPU Load Rate(%)=90; 0-0-7-0-WMPT CPU Overloaded 2011-8-29 19:27 CPU Load Rate(%)=92; 0-0-7-0-WMPT CPU Overloaded 2011-8-29 19:29 CPU Load Rate(%)=92; 0-0-7-0-WMPT CPU Overloaded 2011-8-29 19:41 CPU Load Rate(%)=91; 0-0-7-0-WMPT CPU Overloaded 2011-8-29 19:44 CPU Load Rate(%)=94; 0-0-7-0-WMPT CPU Overloaded 2011-8-29 19:49 CPU Load Rate(%)=90; 0-0-7-0-WMPT If the base station reported "CPU overload" warning (busy more than 5 times) frequently, the CPU load is already high.
Fourth, the existing network signaling load evaluation Evaluate the existing network signaling load is based on the busy 1-2 hours for the signaling load, so all analysis is based on busy data. By the hour to get from the RNC, then signaling the impact of data integration IUB interface link establishment times: VS.IUB.AttRLSetup IUB to increase the number of link port: VS.IUB.AttRLAdd IUB port number of the link weight distribution: VS.IUB.AttRLRecfg
Signaling load calculation of the base station
Notes 1, capacity risk of early network is considering PAPR of network signaling, Huawei PAPR experience with 1.6. In other words, the calculated CNBAP maximum value = CNBAP average * 1.6. 2, PAPR calculation: According to the IUB interface criteria signaling tracing, the main choice of the following three pieces of information: NBAP_RL_SETUP_REQ, NBAP_RL_ADD_REQ, NBAP_RL_RECFG_PREP, according to CNBAP definition, you can count the actual CNBAP per second and 1 hour maximum average ratio. 3, CNBAP (Common NBAP) is used to describe the IUB interface NodeB signaling traffic, which is the 3GPP NBAP defined NBAP (NodeB Application Part) protocol, a CNBAP represents a RL building process. 4, the equivalent CNBAP calculated as follows: CNBAP = NBAP_RL_SETUP_REQ + NBAP_RL_ADD_REQ + NBAP_RL_RECFG_PREP * 2.
Fifth, obtained from the RNC site SAB-CO-3G-4429 system, and then calculate the
2014-1-11 2 , 3
Internal
There are a WMPT board + two WBBPbs in this site, CNBAP specifications are as follows:
Before DBS3900V200R0 10C01SPC510/D BS3900V200R01 1C00SPC320
WMPT+2 WBBPb/d UTRP+W MPT+3W BBPb/d 50 CNBAP/s 60 CNBAP/s
As can be seen from the above, the site signaling load, leading to the site overrun signal processing specifications, and ultimately reported to the CPU Overload alarm. Treatment recommendations: 1, upgrade to DBS3900V200R012C00SPC420 (2011.04), can increase the signaling capacity of 10%; 2, add a UTRP WBBPb board, signaling capacity will be improved to 130CNBAP / s per NodeB Notes: Add UTRP board configuration, you must ensure that the signaling link carrying IUB port must be configured in UTRP board SAALLINK (ATM), SCTP (IP) link must be configured in UTRP board.