True/False
Question
When shop floor scheduling problem larger than 3 machines arise the
analytical solution procedures leading to optimality are complex and
difficult.
Correct Answer
True
Your Answer
True
True/False
Question
C type items would never be vital under VED analysis.
Correct Answer
False
Your Answer
False
True/False
Question
In replenishment system, the type of ordering is either according to
"stock level" or "pre-fixed time scale".
Correct Answer
True
Your Answer
True
True/False
Question
Exponential smoothening is weighted average method.
Correct Answer
True
Your Answer
True
True/False
Question
In PERT, use of dummy activities is not much essential.
Correct Answer
False
Your Answer
True
True/False
Question
The make-or-buy decision is not taken only at starting of a factory but
has to be reviewed continuously.
Correct Answer
True
Your Answer
True
True/False
Question
There are five manufacturing systems. However, many manufacturers
combines two or more systems to produce a final product.
Correct Answer
True
Your Answer
True
True/False
Question
The make-or-buy decision becomes necessary when the current source of
supply is not able to supply the material in accordance with buyer's
quality requirements.
Correct Answer
True
Your Answer
True
True/False
Question
XYZ analysis helps to identify few items which account for large amount
of money locked up in the stock and take steps for liquidation / reduction.
Correct Answer
True
Your Answer
False
True/False
Question
Overlapping of operations helps in compressing manufacturing time.
Correct Answer
True
Your Answer
False
True/False
Question
Inspection operations is a part of process plan for a part.
Correct Answer
True
Your Answer
True
True/False
Question
To solve "n jobs - 3 machines" sequencing problem, the largest of time of
any job on the second machine must be smaller than or equal to the
smallest time of any job on first machine or third machine.
Correct Answer
True
Your Answer
True
True/False
Question
Line staff can assist PPC by manufacturing some of their needs in their
own shops rather than making PPC to tool room or purchase.
Correct Answer
True
Your Answer
False
True/False
Question
LOB is a manual planning and scheduling technique similar in nature to
MRP [Material Resource Planning].
Correct Answer
True
Your Answer
False
True/False
Question
As per a study on materials management practices, a typical firm spends
almost half of its rupee sales on goods purchased from vendors.
Correct Answer
True
Your Answer
False
True/False
Question
Work measurement is not useful for choosing between two alternate
methods of production.
Correct Answer
False
Your Answer
False
True/False
Question
On completion of work the job card is returned to production planning and
control department for reference and record.
Correct Answer
False
Your Answer
True
True/False
Question
Curve fitting method of statistical forecasting uses curve line approach.
Correct Answer
False
Your Answer
True
True/False
Question
Transit time for manufactured items should be considered only when it is
insignificant.
Correct Answer
False
Your Answer
False
True/False
Question
Purchase department must keep PPC informed regarding lead time of
different items specially where lead times are extended.
Correct Answer
True
Your Answer
True
True/False
Question
In order to complete a project on time, each critical activity need not be
completed in time.
Correct Answer
False
Your Answer
False
True/False
Question
Flexibility and product variety are not inter-related with each other.
Correct Answer
False
Your Answer
False
True/False
Question
The LOB technique is most appropriate for assembly operations involving
number of distinct components.
Correct Answer
True
Your Answer
True
True/False
Question
Production Planning and Control makes the supervisor ineffective.
Correct Answer
True
Your Answer
False
True/False
Question
Random fluctuation is addition of cyclical fluctuation and seasonal
fluctuation.
Correct Answer
False
Your Answer
True
True/False
Question
Labour efficiency factor is applied after capacity requirement of equipment
is calculated.
Correct Answer
False
Your Answer
True
True/False
Question
A company where different personnel give conflicting delivery promises
need to improve its scheduling and processing function.
Correct Answer
True
Your Answer
True
True/False
Question
A type items are always vital under VED analysis.
Correct Answer
False
Your Answer
True