Daily Report 20.01.2014
Daily Report 20.01.2014
Contract No.: DOT/C/PT/189/09 Period Project No. Contract No. DOT/C/PT/189/09 20 January 2014
th
Department of Transport RWS Construction Middle East LLC Bureau Veritas TC International SGS Gulf Limited 10/07/2013 Rainy Dusty No. of Days Left for Completion HUMIDITY High TBA Days Low
Cloudy
Medium
TEMPERATURE 0 RANG E C
Max
22
Min
19
AVERAGE CONTRACTOR'S MANPOWER Category Project Manager Project Engineer Planning Engineer Structural Engineer Competent person QA/QC Engineer Surveyor Inspector NOC Coordinator Document Controller CAD Draftsman Safety Officer Indirect labour Operator Electrician AC Technician Welder Drivers Fabrication Team Total 4 3 8 6 47 86 No. 1 2 1 1 1 1 3 2 2 1 2 1 Category Construction Supervisor Steel Fixer Carpenter Mason Tillers Unskilled Cleaner Sub contractor (Cable laying) Safety office Foreman Electrician Mason Labour Competent person No. 4 2 2 3 0 11 0
AVARAGE EQUIPMENT Type BOB Cat Excavator Compactor Welding Machine Jack Hammer Generator (For site works) Spot Light 3 Ton Truck 10 Ton Truck 1 1 1 0 1 1 1 Ton Truck 15 Seater Passenger van 5 ton Crane 88 Seater Bus 20 Ton Mobile crane 400 flat bed trailer with truck Heavy duty Hilti Drills Vibrator Porker JCB Asphalt cutter Paving cutter Qty 0 0 23 0 3 8 2 1 3 3 0 1 0 1 0 1 0 0 47 Hours Status Worked 8 8 8 8 8 8 8 8 8 8 0 8 8 8 8 8 8 8 8
Total
27
Page 1 of 6
AVERAGE CONSULTANT / SUBCONTRACTOR RESOURCES Subcontractor Name TC International SGS Gulf Falcon Baynunah Lab Matrix Ras Al Wadi General Contracting Co LLC 1 1 Engr 1 1 Mech & Elect Design Consultant 1 1 3 Party Inspector
rd
Survey
Finishes
Total 2 2
TOTAL MATERIALS / SHELTERS DELIVERED TO SITE Items Delivery of paving tile blocks Unit Sqmtr Qty
S.N 1
LOCATION
Page 2 of 6
WEEKLEY CONSTRUCTION PERMITS/CONTRACTORs CONCERN S. No Region No of Shelter s Obtain Site Plans Obtain Construction Permits Site Under Progress Site Completed Comments
120
00
00
00
40
00
00
00
Al Gharbia
80
00
00
00
Al Ain City
80
00
00
00
40
00
00
00
Page 3 of 6
RWS will submit the Extension of time claim and relevant cost as contract unable to complete on or before the completion due to numerous factors.
Page 4 of 6
Page 5 of 6