Conductor Stabilization Solution
Conductor Stabilization Solution
Presentation of CSS
Presentation of CSS
Presentation of CSS
Presentation of CSS
Traditional Methods
Steel against steel solutions
CSS
Steel against stress-absorbent material
Require maintenance
Presentation of CSS
Traditional Methods
Not applied to entire conductor guide Requires corrosion protection Customized solution
CSS
Uses 100% of conductor guide Applicable material data & specifications Adaptable & scalable solution Eliminating point stress loads.
Presentation of CSS
First installed in 1999, at the Sleipner platform. No maintenance has been required on this CSS installation. Easy & safe installation. Equipment for installation can be used in classified areas. Dynamic loads are reduced,
Stress loads are distributed over a wider area, thus point stress loads are eliminated. Installation is performed with use of rope access technique, no need for scaffold. Subsea application available. Performed 100 % with ROV. No divers.
Presentation of CSS
10
11
12
Presentation of CSS
CSS Subsea
CSS packed and seafastened on ROV vessel, during transport to offshore installation 8 x CSS element subsea basket
Presentation of CSS
CSS Subsea
Presentation of CSS
CSS Subsea
TAG plate
Locking mechanisms
Presentation of CSS
CSS Subsea
Presentation of CSS
References
First CSS installed on Statoil installation in the North Sea Performed in y.1999 Presentation of method for Hydro Performed in y.2006 Test of material at sub-supplier in Sweden Performed in y.2006
17
Presentation of CSS
www.css.no
http://www.youtube.com/watch?v=tSQx2tri180 http://www.youtube.com/watch?v=UHHHDDa_bZE
18
Mobile: +47 95 24 27 12
19