API Cements and Additives
API Cements and Additives
31
Cementing 1
32
Cementing 1
Introduction
Cements are used universally in well completion operations to fill the annular space between the casing and the open hole. The principal functions of the primary cementing process are to bond and support the casing to restrict fluid movement between formations to protect the casing from corrosion to protect the casing from shock loads when drilling deeper to seal off lost circulation (or thief) zones. In this section, the following units are covered: A. API Cements B. Cement Properties C. Cement Additives
Learning Objectives
Upon completion of the section, you should be familiar with: the API classification system and the ratings of the various cements based upon physical makeup the basic physical properties of commonly used Halliburton cements the functions of commonly used additives the basic steps in the cement manufacturing process.
Topic Areas
API Classification
The nine types of cements classified by the API are
API Classes G and H cements are commonly used across a large geographical area. Classes A, B, and C are used in specific geographic locations where downhole conditions require special cement properties. Classes D, E and F are rarely used and only in special situations.
33
Cementing 1
Table 3.1 - API Classification And Properties Of Common Oil Well Cements
Type Class A (Portland) Class B (Portland) Class C Class G Range of Usage 6000 ft 6000 ft 6000 ft 8000 ft Static Temp F 60-170 60-170 60-170 200 Water Ratio gal/sk 5.2 5.2 6.3 5.0 Slurry Weight lb/gal 15.6 15.6 14.8 15.8 Volume ft3/sk 1.18 1.18 1.32 1.15 May be used when no special properties are desired and well conditions permit. No sulfate resistance. Moderate sulfate resistance. Available in regular and high sulfate-resistant types. Basic cement, compatible with accelerators or retarders for use over the complete range of Classes A through E. Basic cement, higher density, higher and lower water volume. Remarks
Class H
8000 ft 8000 ft
200 200
4.3 5.2
16.4 15.6
1.06 1.18
You may also hear the terms Standard, Premium and Premium Plus when referring to oil field cements. Standard cement has characteristics similar to API Classes A&B. However; Standard Cement may not meet API specifications for Class A or B. Premium Cement has characteristics similar to API Classes G&H. However; Premium Cement may not meet API specifications for Class G or H. Premium Plus Cement has characteristics similar to API Class C. However; Premium Plus Cement may not meet API specifications for Class C.
creating a hydraulic cement--one that hardens with the addition of water. Aspdin named the product portland cement because it resembled a stone quarried on the Isle of Portland off the British Coast. With this invention, Aspdin laid the foundation for today's portland cement industry. Cements consist of limestone (or other materials high in calcium carbonate), clay or shale, and some iron and aluminum oxides (if not found in quantity in the clay or shale). These dry materials are finely ground and mixed thoroughly in the correct proportions, either dry (dry process), or with water (wet process). The mixture is heated to very high temperatures causing the ingredients to react chemically, resulting in material called clinker. The clinker is ground with a controlled amount of gypsum to form cement. All cement classes are manufactured in essentially the same way and made of the same ingredients, only in different proportions. The water requirement of each cement varies with the fineness of grind or amount of surface area. High early strength cements (Class C) have a high surface area (fine grind); the retarded cements (Classes D, E, F) have less surface area, and the Portland cements (Classes A & B) have a surface area slightly higher than the retarded cements. Class G is a premium fine grind and class H is a premium coarse grind.
Other materials having somewhat different cement properties are also commonly used in the primary cementing process. These materials do not fall in any specific API classification and are classified as Special Cements.
34
Cementing 1
Unit A Quiz
Fill in the blanks with one or more words to check you progress in Unit A. 1. The American Petroleum Institute has identified nine classes of basic cements. Five of those nine classes are commonly used in the oil field. They are _____________, _____________, _____________, _____________ and _____________. 2. The API cements most commonly used across a wide geographical area are classes _____ and _____. 3. Although both Class G and Class H cements have similar properties, Class H has a ___________ density. 4. Special cements are similar to basic cements in that they are commonly used in the _______________________ process. 5. Cement consists of ______________ that is ground with a controlled amount of _____________. 6. Although all classes of cements are manufactured in basically the same way, they differ in that different ______________ of ingredients are used. 7. The water requirements for each type of cement vary based upon _________________________.
35
Cementing 1
Cement properties can be changed to meet the needs of a particular job. This unit addresses the physical properties of oilwell cements and how these properties affect or are affected by conditions downhole. This unit includes Factors influencing slurry properties Thickening time Compressive strength. Flow properties
Slurry density or cement slurry weight should, except for squeeze jobs, be great enough to maintain well control. As a result, slurry densities are always carefully monitored. In the field, this can be done either manually with a pressure balanced scale (Fig. 3.1) or automatically with a densometer. To avoid a poor primary cementing job, a slurry must be maintained at its proper density.
The water ratio or gallons of water required per sack of cement is important in determining the thickening time and compressive strength of the cement. Most slurries are mixed with an amount of water that provides a set volume equal to the slurry volume without freewater separation. Your Halliburton Cementing Tables (Red Book) contains a section entitled Technical Data in which you can find water requirements for various types of cements. The following rule of thumb can help:
36
Cementing 1
The careful recording and monitoring of slurry density ensures a correct water to solids ratio is maintained. Slurry yield is the number of ft/sk an API standard manufactured cement yields based upon a given amount of mixing water. In determining the volume of cement required to do a particular cement job, a caliper survey, volume requirements based on Red Book data, and/or regulatory requirements are used. Too much cement rather than too little is always advisable, especially where there is a possibility of mud contamination, dilution, or channeling.
The Technical Data section of your Red Book contains temperature/thickening time information. This data represents average temperatures at various depths along the Gulf Coast and may not correspond to temperatures at the same depths in other areas. Always remember temperature, rather than depth, has the greatest effect on cement thickening times. Thickening time is also affected by conditions that cannot always be controlled during laboratory tests, such as water invasion - causes failure to set loss of water to the formation - causes accelerated set shutdown during cement slurry placement - speeds up thickening and slurry set faster than reported by laboratory conditions contamination - causes setting failure.
Thickening Times
The thickening time, based upon laboratory testing, is the time required for a cement to become unpumpable. Thickening times are established in response to Laboratory test results Actual well conditions
Laboratory thickening time tests (Fig. 3.2) are conducted using a sample of cement (with additives, if used) and mixing water. The cement slurry is tested to determine the amount of time for thickening to take place. The following well conditions are controlled during these tests: bottomhole circulating temperature (BHT) well depth well pressure.
These factors affect the thickening time of cement to various degrees. It is important to remember that the slurry thickening time changes if one of these situations is encountered. Finally, when considering thickening times, remember that moving cement is less likely to setup; therefore, once you stop moving the cement slurry, the cement starts to build gel strength. A basic rule should always be followed: never stop moving the cement until it is in place.
Compressive Strength
Compressive strength is the amount of strength required to support a string of casing. Compressive strength provides the basis for most WOC (waiting-on-cement) regulations. It is a generally accepted rule that a compressive strength of 500 psi is the minimally acceptable standard for most cement operations. However, consult the regulatory guidelines to determine the minimum strength requirements for the state in which you work.
37
Cementing 1
Deciding how long to wait for your cement to build up enough compressive strength for drilling out is a function of cement type, additives, and wellbore temperature. Other factors that affect cement curing or WOC times (field variables, completion procedures, and curing conditions) do not allow a foolproof WOC time to be set. Thus, the rule of thumb is to achieve a minimum compressive strength of 500 psi before drilling out.
Mix Water
Cement slurry contamination is a major concern during the cementing process. It would be ideal if the water supply for mixing cement was completely free from contaminants. This is not always practical, you must consider the most readily available source of water. Additives in the drilling fluid can also contaminate cement slurry and affect its setting properties. Table 3.2 lists some common sources of contaminants and the effect each has on cement slurry properties. Halliburton has definitive guidelines for allowable levels of contaminants in cement mix water.
Table 3.2 - Mixing Water or Mud Additive Contaminants
Source of Contaminant Mixing Water Type Salt (1% to 8% per weight of water) Organic Material (decomposed plant life, waste effluents) Agricultural Products (farm fertilizer Sea Water Mud Additives Barium sulfate (BaSo4) (Barite) Caustics (NaOH, Na2COH3,etc) Calcium compounds (CaO, Ca(OH)2, CaCl2, CaSo, 2H20) Thinners (tannins, lignosulfonates, quebracho, lignins, etc.) Fluid-loss control additives (CMC, starch, guar, polyachrylamides, lignosulfonates) Effect on Cement Slurry Accelerates set
Retards set
Accelerates set
Accelerates set
Retards set
Retards set
38
Cementing 1
Unit B Quiz
Fill in the blanks with one or more words to check your progress in Unit B. 1. An important factor in determining the thickening time and compressive strength of the cement is the ______________________ or gallons of water required per sack of cement. 2. In order to determine the water requirements for the cement you are using, refer to your _____________. 3. Difficulty in pumping cement slurry downhole can be the result of ________________________. 4. The required cement thickening time is usually determined under _________________________ conditions. 5. Contaminants which can affect the cement slurry usually come from two sources: mixing water and ______________________. 6. An important thing to remember when dealing with thickening times in the field is that the cement starts to build __________________ once youve stopped _____________. 7. Generally, a compressive strength of 500 psi is a _____________________________ standard for most cement operations. 8. The wellbore temperature and the cement type, density, and additives are factors to consider when determining ____________________________________time.
39
Cementing 1
By using basic cements (API Classes G or H) and additives, you can tailor cement slurries to fit any specific well requirement. Most additives are available as liquids or free-flowing powders. Liquid additives are added directly to the mixing water. Powders are usually dry-blended with cement before they are transported to the well. When necessary, they can also be dispersed in the mixing water at the job site. There are nine categories of cement additives: accelerators lightweight additives heavyweight additives retarders lost circulation additives fluid loss additives dispersants gas control additives specialty materials
Lightweight Additives
Sometimes, a slurry weight needs to be reduced to protect formations that have a low fracture gradient or for economics. To reduce the weight of cement slurries, you can add water, low specific-gravity solids, or foam cement. Bentonite is one of the most commonly used lightweight additives. You can use it to formulate these different lightweight cements: Blended gel cement (1 to 16%) Premixed bentonite (prehydrated) Modified cement (Humble patent) High gel salt cement (Gulf patent)
Foam cement using nitrogen (N2) produces 4- to 19-lb/gal slurries, which have excellent strength to density ratio (low permeability).
Heavyweight Additives
The main purpose of heavy weight additives is to restrain high formation pressures. Heavy weight additives are used to obtain slurry densities up to 20 lb/gal. They have a low water requirement and have a uniform particle size range from batch to batch. Heavyweight
Cement Accelerators
Cement accelerators shorten thickening time and reduce WOC. They also increase early strength. Accelerators are widely used on surface pipe, shallow wells, and cement plugs. Additional
3 10
Cementing 1
additives are chemically inert and compatible with other additives. The most common materials used for weighting cements are Hematite (iron ore) Barite (more common in drilling fluids) Ottawa sand Salt
Of the materials listed, hematite is most widely used, because it most closely fits physical requirements and achieves the highest effective specific gravity.
Actually, lost circulation control during cementing involves adding material that will prevent losses to the cement slurry while you are placing it. Some of the more commonly used lost circulation materials include Granular (gilsonite, coal, perlite, walnut hulls, mica) Fibrous (nylon, polypropylene) Laminated (cellophane) Specialized flash setting or gelling materials
Cement Retarders
Cement retarders slow cement setting time (hydration) to allow for safe cement placement. The high temperatures in deep wells will cause cement to set prematurely. The higher the temperature, the faster the cement sets. Retarders usually have a limited effective temperature range. For example, a particular retarder may be only effective from 115 to 225F. The chemicals widely in use as retarders include those listed below: Lignins (sodium lignosulfonate, calcium lignosulfonate) Carboxymethyl hydroxyethyl cellulose (CMHEC) Saturated salt water Organic acids Synthetic polymers
3 11
Cementing 1
3 12
Cementing 1
Figure 3.10 - Hole washout due to sloughing of water sensitive shales. Cementing with fresh water cement slurries can cause similar hole enlargements. You can prevent annular bridging and the resulting lost circulation by using cement slurries containing salt. Shales that are sensitive to cement filtrate can actually be softened by it before the cement sets. If softened enough, the shale will flow. This creates channels behind the cement sheath from one perforated zone to another. Blending dry granulated salt with cement at the bulk plant makes salt-saturated cement much easier to use. It allows you to eliminate waste, and save time and labor; it can also reduce the possibility of foaming. While sodium chloride is the salt generally used with cement, potassium chloride is used also. In some cases, potassium chloride may be effective at lower concentrations; it does not significantly affect cement slurries any differently than sodium chloride, except at higher concentrations.
3 13
Cementing 1
Unit C Quiz
Fill in the blanks with one or more words to check your progress in Unit C. 1. Most additives are available as _______________ or ________________________________. 2. Cement accelerators shorten __________________________ and reduce WOC. 3. _________________ is one of the most commonly used lightweight additives. 4. The main purpose of heavy weight additives is to restrain _________________________________. 5. The ________________________________ in deep wells will cause cement to set prematurely. 6. Lost circulation or lost returns refers to ______________________ loss or _______________________loss to formation voids during drilling or completing a well. 7. __________________________________ counteract the tendency of cement slurries to lose the water that the slurries need to help achieve a good cement job. 8. Because cements with dispersers added can be pumped in turbulent flow at lower pressures, you can reduce the __________________ required. 9. The path of gas migration is __________________ and exists even after the cement has fully hardened. 10. _________________________ can help prevent shale sections from sloughing or heaving during cementing.
3 14
Cementing 1
Items from Unit B Quiz 1. water ratio 2. Red Book 3. too little water 4. actual well 5. drilling fluid (or mud additives) 6. gel strength, pumping 7. rule of thumb (or generally accepted rule) 8. WOC
Refer to Page 3-6 3-6 3-6 3-7 3-8 3-7 3-7 3-8
Items from Unit C Quiz 1. liquids, free-flowing powders. 2. thickening time 3. Bentonite 4. high formation pressures 5. high temperatures 6. whole fluid , cement slurry 7. Fluid loss additives 8. horsepower 9. permanent 10. Salt cements
Refer to Page 3-10 3-10 3-10 3-10 3-11 3-11 3-11 3-12 3-12 3-13
3 15
Cementing 1