Micro Turbine Testing Program
Micro Turbine Testing Program
Program
Accomplishments:
• $3.0 million program in progress since 1996
• 12 MTGs tested or in test
• Two to four more MTGs expected for testing
• Completed machine performance tests on 8 MTGs
• Completed initial electrical behavior testing
• Over 44,000 hours of testing
• Implemented “live” browser enabling technology
Accomplishments:
• $3.0+ million program in progress since 1996; results have driven
improvements to MTGs and program builds public awareness
• 12 MTGs tested or in test; two to four more MTGs expected for testing
• Over 48,000 hours of testing
• Completed machine performance tests on eight MTGs
• Completed initial electrical behavior testing
• Numerous site tours, presentations, papers
SCE MTG Test Bed at University of
California at Irvine (UCI)
• 4 test bays
• 400 amp 480 volt service
• 100 psig natural gas with ability
to blend for lower Btu testing
• Cogen heat dissipation ability
• 80 kW load banks for stand
alone and “micro grid” testing
• Electronic data acquisition and
instrumentation for gas & electric
• Veteran two-person testing crew
• Standardized testing procedures
• Ability to do specialized/custom
testing
Desirable Attributes vs. Test Parameters
• ATTRIBUTES • TEST PARAMETERS
– Heat rate 12,000 to 16,000 – Overall unit efficiency
BTU/kWh
– Net Power Output
– Good Part Load Performance
– Emissions
– Emissions < 9 ppm
– Power Quality
– Power Quality < IEEE 519
– Noise
– Noise < 70 dBa
– Endurance
– Endurance = 40,000 hours
– Ease of Installation
– Installation = Easy & Cheap
– Operability
– Maintainability
Data Acquisition System
Parameter Measuring Instrument
• Electrical Energy Produced • 3-phase electrical meter with pulse
output module
• Fuel Consumed (Gas Flow) • Gas flow meter
• Fuel Temperature • Resistance Thermal Detector (RTD)
• Gas Pressure • Pressure transducer
• Water Flow • Water flow meter
• Boiler Air Temperature – • Thermocouple
Inlet and Outlet
• Water Temperature – Inlet • RTD
and Outlet
• BMI 7100 and BMI 8010 power
• Power Quality Snapshots quality meters
• Ambient Temperature • Temperature Probe
• Relative Humidity • Solid State IC
• Barometric Pressure • Barometric pressure
transducer
Testing Schedule & Status: 03/01/02
Capstone "B" 30 kW Jan-97 958 Completed
Capstone "B" 30 kW Jan-97 967 Completed
Capstone 10 Pack Apr-97 26 Completed
Capstone "C" 30 kW May-97 3,794 Completed
Capstone "C" 30 kW Jul-97 2,079 Completed
Bowman 35 kW Feb-99 100 Completed
Bowman 60 kW Jun-99 60 Completed
Capstone HP 30 kW Apr-99 18,881 Operating
Parallon 75 kW Jun-00 5,806 Completed
Capstone LP 30 kW Aug-00 12,341 Operating
Bowman 80 kW Jun-01 3,424 Operating
Total 48,436
Capstone 30 kW Description
Model 330 rated output: 30 kW at ISO
480 VAC, 3-phase, 60 Hz
Recuperated single stage radial flow
compressor and turbine on a single
shaft, integrated with generator
Equipped with a low NOx combustor
Not equipped with a waste heat
recovery boiler
Fourth generation unit
One unit only capable of grid connect
One unit capable of stand alone and
grid connect operation
Capstone 28 kW Results
Several overspeed trips were resulting from flame control
algorithm; Capstone remotely downloaded revised control
system software; no overspeed trips since software revised
Reliable operation following resolution of overspeed
Comparing manufacturer’s efficiency and heat rate claims
with test results converted to a common basis, resulted in
testing results consistent with claims as shown below
@ 70°F, about sea level, and LHV:
(tested) (claimed)
Efficiency 23.7% ± 0.45% 24.5% ± 0.5%
Heat rate 14,415 BTU/kWh 13,931 BTU/kWh
Capstone 28 kW Results
¾ Total Harmonic Distortion (THD) requirements specified by IEEE
519 were met:
• Voltage THD: 1.6% measured average < 5% IEEE 519
• Current THD: 5.87% measured average < 8% IEEE 519
¾ Noise measurement taken at 2m due to site conditions, e.g.
obstructions and site compressor noise. Noise measured 70 dBA
@ 2m, consistent with manufacturer’s claim, 65 dBA, 10m.
¾ Emissions test results met SCAQMD requirements:
35000 120000
30000 100000
20000
60000
15000
Power Demand (W) 40000
10000
Output Power (W)
5000 Engine Speed (rpm) 20000
0 0
0
40
80
120
160
200
240
280
320
360
400
440
480
520
560
600
640
680
720
760
800
840
880
920
960
1000
1040
Seconds
“New” Capstone 30 kW from “Old”
Capstone 28 kW
• DPC [digital power controller] was
HP Capstone Model 330 upgraded Oct 2000 – this MTG
Op History
became a different machine:
Average Power & Efficiency (HHV)
35.0
20.0
2 kW max, just over 7%.
15.0
– Increased machine efficiency
10.0
Jun
Aug (725 HHV)
Feb
Apr
Jun
Aug
Feb
Apr
Oct
Oct
Dec
Dec
ParallonTM 75 kW at ISO
275 AC with Honeywell transformer
option added to boost to 480 VAC, 3-
phase, 60 Hz at site
Recuperated single stage radial flow
compressor and turbine on a single
shaft, integrated with generator
Not equipped with a heat recovery
boiler – option is available
Grid parallel or stand-alone operation
Internal gas compressor
Bowman 80 kW CHP Description
Bowman 80 kW at ISO
480 VAC, 3-phase, 60 Hz
Recuperated single stage
radial flow compressor and
turbine on a single shaft,
integrated with generator
Integrated heat recovery boiler
In grid parallel operation
Will test stand-alone operation
Summary of Testing Results: 3/07/02
• 1997 Testing of Capstone units (Beta, Charlie – pre-commercial)
– Did not meet manufacturer’s expectations
– First & second generation units
– Began testing “next generation” in 1999
• 1998 No MTGs commercially available to purchase and test
• 1999 Testing of Bowman units (pre-commercial)
– Did not meet manufacturer’s expectations
– First generation units;
– Began testing “next generation” in 2001
• 1999 Testing of High Pressure Capstone unit
– Met manufacturer’s claims
– Fourth generation unit
– Began testing “next generation” in 2000
Summary of Testing Results: 03/07/02
(continued)
• 2000
– Capstone high pressure unit’s DPC upgraded and replaced resulting
in higher power output and increased efficiency
– Began testing low pressure Capstone and Honeywell
• 2001
– Initial results for Capstone both LP and upgraded HP
– Honeywell results
– Performed electrical characterization on Capstones and Honeywell
– Began testing Bowman
– Elliot returned to UCI test site and testing to resume
• 2002
– Begin testing of Ingersoll-Rand (I-R)
– Seek other MTGS, such as Capstone 60 kW, Turbec 100 kW CHP
– Test “new models” from Bowman & I-R
– Finalize results for Capstones and Bowman
Future testing -- Elliott 80 kW
Elliott 80 kW at ISO
480 VAC, 3-phase, 60 Hz
Recuperated single stage
radial flow compressor and
turbine on a single shaft,
integrated with generator
Not equipped with a heat
recovery boiler – option is
available
Grid parallel or stand-alone
operation
Future testing -- Ingersoll-Rand 70 kW
Ingersoll-Rand 70 kW at ISO
480 VAC, 3-phase, 60 Hz
A dual shaft recuperated MTG:
A radial flow compressor and
gasifier turbine on one shaft
A radial flow power turbine on the
other shaft
The power turbine drives the
reduction gear and induction
generator for grid parallel-only
operation
Heat recovery boiler option
available
Internal gas compressor
Future Testing - Capstone 60 kW
Description
Capstone 60 kW at ISO
480 VAC, 3-phase, 60 Hz
Recuperated single stage
radial flow compressor and
turbine on a single shaft,
integrated with generator
Not equipped with a heat
recovery boiler – option is
available
Grid parallel or stand-alone
operation
Selected Quotes regarding program,
tours, presentations
“This is really cool!” Hugh Anderson, Investment
Banker, Banc of America Securities
“No one else is even close!” Don Baker,TVA manager
“Far exceeded our expectations!” Chris Hunter,
Johnson & Johnson, worldwide strategic engineering
manager
“Edison’s contributions to these technological advances
is commendable,” Karen Johanson, ISO BOD
“Your discussion of most recent results was of great
interest to participants,” Gil Rodgers & Steve Taub,
Directors, CERA Distributed Energy Summit
Blue lines = installed Wiring
Site installation
Router to Internet. Provides VPN
and local IP addresses for
equipment
BTU
2020 CS
3030
Aggregated connections
to MTGs. Typically
mounted inside control
panel. Centralized due
Elliott Capstone
to migration of MTG Capstone
(when LP Bowman
HP
Equipment. available)
“3030” box at SCE MTG Test
Bed
Blue lines = installed Wiring
Site installation
Router to Internet. Provides VPN
and local IP addresses for equipment
BTU
2020 CS
3030
Aggregated connections
to MTGs. Typically
mounted inside control
panel. Centralized due
Elliott Capstone
to migration of MTG Capstone
(when LP Bowman
HP
Equipment. available)
Questions?