0% found this document useful (0 votes)
241 views

Dimentional Control

This document outlines dimension control procedures for a project to fabricate piping and structural components for a TPU receiver. It defines dimension control and responsibilities for ensuring dimensions conform to design. Fabricated pieces will have dimensions checked before and after welding to define accuracy. Quality control will maintain dimension check records and include them in as-built documentation. Dimensional checks will be performed at required intervals to manage dimension control during integration.
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
241 views

Dimentional Control

This document outlines dimension control procedures for a project to fabricate piping and structural components for a TPU receiver. It defines dimension control and responsibilities for ensuring dimensions conform to design. Fabricated pieces will have dimensions checked before and after welding to define accuracy. Quality control will maintain dimension check records and include them in as-built documentation. Dimensional checks will be performed at required intervals to manage dimension control during integration.
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

DIMENSION CONTROL PROCEDURES 1.

0 GENERAL
This document is prepared to ensure that all Designed Dimension in this project TPU RECIEVER PIPING AND STRUCTURER A!RICATI"N #"R$ %T!&'()'* are +eing ,ollo-ed and .ept/ Dimension Control Acti0ities -hich do not con,orm to this re1uirement are identi,ied and controlled to pre0ent undesira+le pro+lems during 2oo.&up/ This document sets up the minimum control procedure to +e adopted ,or the handling and control o, spoil dimensions in this project/ The e3ecution o, all phases o, the Project per,ormed +4 5S67!RN6 should ,ollo- the said procedure ,or eas4 control o, Dimension in this project/ '/8 APPLICABILITY This procedure is limited to all phases o, this project TPU RECEIVER PIPING AND STRUCTURA6 A!RICATI"N #"R$ %T!&'()'* to +e e3ecuted +4 5S67!RN6 ,or ADDA9 PETR"6EU5 6I5ITED/ :/8 REFERENCES :/; :/' ?/8 IS" <88;='888 Project >A7>C Plan %5S67!RN678;788;7'8;;*

DEFINITIONS ?/; Dimension control can +e de,ined as the process o, chec.ing and controlling o, piping and structural designed dimensions@ so as not to ha0e di,,iculties during installation 72oo. Aup ?/' Dimension@ speci,ied length@ -hich is in con,ormance -ith a gi0en design/ ?/: Control@ chec.ing a s4stem against a standard or gi0en re1uirement/

)/8

RESPONSIBILITIES )/; The >A>C Engineer shall +e responsi+le ,or the implementation o, this procedure/ )/' )/: )/? The >A>C engineer shall the responsi+ilit4 o, super0ising the acti0ities o, the ,itters during ,it up and also the acti0ities o, the -elders during -elding/ The >A>C Engineer shall also ha0e the responsi+ilit4 o, identi,4ing and controlling dimensions@ so as to ,it -ithin Tolerance limit/ It is the responsi+ilit4 o, the piping 7 structural Engineer to chec. dimension o, ,a+ricated spools@ structures@ and to record all parameters/ Record o, random chec.s o, these shall +e .ept It is the responsi+ilit4 o, the >A>C Engineer to ensure that dimension o, ,a+ricated spools7structures are recorded and then necessar4 chec. sheets are signed o,,/

)/)

B/8 B/;

MANAGING DIMENSION CONTROL AND PROCEDURE managing dimension starts ,rom the process o, cutting and li,tingCs@ 5anaging dimensions during integration in this project shall +e handled and outlined as ,ollo-s= No measurement shall +e cut -ithout the ,itter con,irming the measurement/ All mar.ing and measurement on pipe and other steel structural mem+ers shall +e done +4 1uali,ied and certi,ied ,itter/ Dimension chec. on e0er4 ,it up shall +e done so as to de,ine its le0el o, accurac4 and precision +e,ore and a,ter -elding/ All ,ittings and piping materials should +e o, standard nominal measurements@ ,ittings Reco0ered ma4 not +e used@ +ut i, used ne- Dimensional o, ,ittings shall +e put into consideration +e,ore mar.ing and cutting o, pipe/ The >ualit4 Control Department shall maintain complete records o, all dimensional chec. and incorporate them in the ,inal >A>C close out and AS A !uilt documentations/ Detailed Dimensional control chec. shall +e cali+rated at re1uired inter0als/ DIMENSIONAL CONTROL CHECK

B/' B/: B/? B/)

B/B

C6IENTS=

ADDA9 PETR"6UE5 DEVE6"P5ENT NIGERIA6 6I5ITED/ 5EC2ANICA6 SDSTE5 6TD 7 A!RICATI"N #"R$S/ TPU RECEIVER PIPING AND STRUCTURA6 A!RTICATI"N TB-2852

C"NTRACT"RS= PR"EECT= #"R$S CONTRACT NO: SUBJECT:

Fi ! "##"$%&!' ()#% !"#" " ! !*"+i , ) #%& Di-& .i) "/ $%&$0 )1 #%& "()2& .#"#&! i#&-.. I!& #i1i$"#i) -"*0 +". 3&*1)*-&! +i#% ."#i.1"$#i) . 4i.5"/ $%&$0.666666666666666666666666."#i.1i&! Di-& .i) "/ $%&$0.66666666666666666666..."#i.1i&! O2&*"// *&.5/#666666666666666666666666..."#i.1i&!

DIMENSIONAL CONTROL
MEMBERS DESINGNED LENGTH7MM8 DESIGNED LENGTH UP AND 9ELDING7MM8 DIFFERENCE AFTER 9ELDING 7MM8 REMARK

MSL:BRO9N ROCKS REP


NAME DESIGNATION SIGNATURE DATE

ADDA;

You might also like