0 GENERAL
This document is prepared to ensure that all Designed Dimension in this project TPU RECIEVER PIPING AND STRUCTURER A!RICATI"N #"R$ %T!&'()'* are +eing ,ollo-ed and .ept/ Dimension Control Acti0ities -hich do not con,orm to this re1uirement are identi,ied and controlled to pre0ent undesira+le pro+lems during 2oo.&up/ This document sets up the minimum control procedure to +e adopted ,or the handling and control o, spoil dimensions in this project/ The e3ecution o, all phases o, the Project per,ormed +4 5S67!RN6 should ,ollo- the said procedure ,or eas4 control o, Dimension in this project/ '/8 APPLICABILITY This procedure is limited to all phases o, this project TPU RECEIVER PIPING AND STRUCTURA6 A!RICATI"N #"R$ %T!&'()'* to +e e3ecuted +4 5S67!RN6 ,or ADDA9 PETR"6EU5 6I5ITED/ :/8 REFERENCES :/; :/' ?/8 IS" <88;='888 Project >A7>C Plan %5S67!RN678;788;7'8;;*
DEFINITIONS ?/; Dimension control can +e de,ined as the process o, chec.ing and controlling o, piping and structural designed dimensions@ so as not to ha0e di,,iculties during installation 72oo. Aup ?/' Dimension@ speci,ied length@ -hich is in con,ormance -ith a gi0en design/ ?/: Control@ chec.ing a s4stem against a standard or gi0en re1uirement/
)/8
RESPONSIBILITIES )/; The >A>C Engineer shall +e responsi+le ,or the implementation o, this procedure/ )/' )/: )/? The >A>C engineer shall the responsi+ilit4 o, super0ising the acti0ities o, the ,itters during ,it up and also the acti0ities o, the -elders during -elding/ The >A>C Engineer shall also ha0e the responsi+ilit4 o, identi,4ing and controlling dimensions@ so as to ,it -ithin Tolerance limit/ It is the responsi+ilit4 o, the piping 7 structural Engineer to chec. dimension o, ,a+ricated spools@ structures@ and to record all parameters/ Record o, random chec.s o, these shall +e .ept It is the responsi+ilit4 o, the >A>C Engineer to ensure that dimension o, ,a+ricated spools7structures are recorded and then necessar4 chec. sheets are signed o,,/
)/)
B/8 B/;
MANAGING DIMENSION CONTROL AND PROCEDURE managing dimension starts ,rom the process o, cutting and li,tingCs@ 5anaging dimensions during integration in this project shall +e handled and outlined as ,ollo-s= No measurement shall +e cut -ithout the ,itter con,irming the measurement/ All mar.ing and measurement on pipe and other steel structural mem+ers shall +e done +4 1uali,ied and certi,ied ,itter/ Dimension chec. on e0er4 ,it up shall +e done so as to de,ine its le0el o, accurac4 and precision +e,ore and a,ter -elding/ All ,ittings and piping materials should +e o, standard nominal measurements@ ,ittings Reco0ered ma4 not +e used@ +ut i, used ne- Dimensional o, ,ittings shall +e put into consideration +e,ore mar.ing and cutting o, pipe/ The >ualit4 Control Department shall maintain complete records o, all dimensional chec. and incorporate them in the ,inal >A>C close out and AS A !uilt documentations/ Detailed Dimensional control chec. shall +e cali+rated at re1uired inter0als/ DIMENSIONAL CONTROL CHECK
B/B
C6IENTS=
ADDA9 PETR"6UE5 DEVE6"P5ENT NIGERIA6 6I5ITED/ 5EC2ANICA6 SDSTE5 6TD 7 A!RICATI"N #"R$S/ TPU RECEIVER PIPING AND STRUCTURA6 A!RTICATI"N TB-2852
Fi ! "##"$%&!' ()#% !"#" " ! !*"+i , ) #%& Di-& .i) "/ $%&$0 )1 #%& "()2& .#"#&! i#&-.. I!& #i1i$"#i) -"*0 +". 3&*1)*-&! +i#% ."#i.1"$#i) . 4i.5"/ $%&$0.666666666666666666666666."#i.1i&! Di-& .i) "/ $%&$0.66666666666666666666..."#i.1i&! O2&*"// *&.5/#666666666666666666666666..."#i.1i&!
DIMENSIONAL CONTROL
MEMBERS DESINGNED LENGTH7MM8 DESIGNED LENGTH UP AND 9ELDING7MM8 DIFFERENCE AFTER 9ELDING 7MM8 REMARK
ADDA;