HEMM Dozer4
HEMM Dozer4
Moving earth is a fact of life in mining and construction – It was decided to trial the stretches 64km, this can be
a painstaking and time-consuming task. Leica Geosystems, Leica Dozer 2000 package at very time consuming.“
in partnership with Tritronics (Australia) Pty Ltd and assisted BMA’s Blackwater Mine.
by their Australian Distributor, C.R. Kennedy & Company Pty Using Global Positioning Integrated Mining System
Ltd, however, have developed just the solution – the Leica System (GPS) technology,
DOZER 2000T. Without even stepping out of the office, the the Leica Dozer 2000 is able In February 2001, BMA
mining engineer and surveyor have direct radio contact with to clearly indicate the posi- introduced Leica Sales
the machine operator who is working with the bulldozer. tion of the earth moving Representatives to Queens-
Digital Terrain Models (DTM) are relayed directly to the machine relative to the land Company Tritronics
machine, guiding and verifying earth grading by real time desired “design“ surface, (Australia) Pty Ltd, world
GPS and completing this task more efficiently, in less time, enabling the operator to leaders in the design,
and with considerable savings across the entire project. move left or right, and to cut development and installa-
and/or fill accordingly. tion of mine machine
The success of a recent trial by mining giant BMA (BHP monitoring and information
Billiton Mitsubishi Alliance) at their Blackwater coal mine in Better data transfer and systems.
Queensland, Australia, has led to an order of 15 Leica Dozer integration
2000T integrated systems for the Blackwater Mine. A further For the past six years, the
19 units have been ordered for three other mines within the Although the Leica Dozer Blackwater Mine has been
BMA operation – a significant sign of the considerable poten- 2000 worked well during the using Tritronics’ Fleet
tial that this revolutionary technology has for the industry. trial, there was still a requi- Management System –
rement for better data trans- a communications network
fer. “In particular we were that allows mine production
looking for productivity to monitor machinery
improvement because at throughout the whole mine
that stage there was no way by use of GPS receivers.
to bring data back to the offi- BMA has invested signifi-
ce automatically,“ said Ian cantly into this system with
Rogers, Technology and the upgrade of 75-80 pieces
Communications Manager of equipment with new
for BMA. The normal Leica high-speed radios in order
Dozer 2000 setup meant that to incorporate them into the
data had to be transferred new system software
via a PCMCIA card from Integrated Mining System
the office computer to the (IMS). The IMS combines
on-site machine. powerful reporting and ana-
lysis software with reliable
The Leica Dozer 2000T guides For some time, BMA have “BMA wanted to simplify radio telemetry to deliver
and verifies earth-grading by wanted to improve the the radio networks and ob- accurate monitoring and
real time GPS. process of relaying instruc- tain the production data in reporting. “Tritronics were
tions from the office to the real time,“ David Williams well established and well
various machine operators from Leica’s Australian trusted,“ Anders Mangen,
on site. After an assessment Distributor, C. R. Kennedy & C. R. Kennedy’s National
of all dozer systems on the Company Pty Ltd said. “The Survey Division Manager,
market, BMA approached Leica Dozer 2000 is a stand said. “They had proven to
Leica Geosystems at the end alone system as the memory BMA that they could deliver
of 1999 to further investigate card needs to be returned a good system – particularly
the Leica Dozer 2000 machi- back to mine office for trans- for a complicated big mine
ne guidance package. ferral of data. On a mine that like the one at Blackwater.“
10
“With the IMS system we complicated. The biggest The integration of the IMS
can locate drills, water problem was the file transfer and Leica Dozer 2000 has
trucks and other vehicles system – ensuring that large demonstrated a consider-
over the entire 64km mine files can be transmitted able increase in productivity.
strip on a computer back in over the radio system. This According to Ian Rogers, the
the office,“ BMA surveyor is especially difficult when company envisages consi-
Brad Payne said. “Informa- there are often breaks in derable savings. “We
tion such as the job descrip- transmission such as when believe the trial showed
tion, production statistics the dozer is turned off some productivity gains and
and current machine opera- during a download.“ though it’s hard to say how
tor can also be provided.“ much at this stage, we are
Productivity, security and looking for pay back from The GPS Base station transmits
Following discussions with savings the system within three data to the Rover.
Tritronics, it was decided years.“
to incorporate the Leica Consequently, over the last
Dozer 2000 package into the six months BMA Blackwater Most of these savings are
Tritronics Integrated Mining has been trialling the Leica generated by eliminating the
System. Dozer 2000T integrated need for survey staking and
system – which has opened reducing the re-handling of
“We were asked to do the up a radio link, providing the spoil.
integration between the engineer with direct contact
GPS systems and the data by radio to the machine ope- For Operators such as Les
telemetry system and also to rator and allowing complete “Pfeffy“ Pfeff, the Leica
connect the dozer into the computer designs in the offi- Dozer 2000T has made the
reporting system,“ said ce to be sent directly out to job easier. “It’s a lot easier to
Geoff Baldwin, Manager of the dozer. do the job now because you
Tritronics. “It wasn’t overly follow a plan,“ he said. As
11
for training and operation,
Pfeffy said that it really is
just a matter of pushing the
buttons on the touch screen.
“You haven’t got to be a
whiz kid to understand this
sort of thing.“
12