KemiraPlantHistory(Inspection,Maintenance,Replacements,Failures,Modifications,ResultantOperationalupset,Efficiencyloss)
P&IDNo EquipmentTag EquipmentDescription VendorName 1990 1991 1992 1993 1994 1995 1996 TA'96 E093wasnewlyintoducedasaresultof ENCON5studyandnewexchangerwas NoConcern installedwithSS321tubes,SS304Lshelland Duplextubesheetmaterials. Slightcorrosionwasobservedontubes, tubesheetandchannelcover.Packingfaceof NoConcern partitionribalsoshowcorrsionbutwas acceptable NoConcern NoConcern 1997 1998 1999 2000
ConstructionphaseInspection Findings
2009
FFLHistory(RefertoKemiradetails)
2010
2011
2012
E093
CATACARBReboiler
BRONSWERK
NotInstalled
NotInstalled
NotInstalled
NotInstalled
NotInstalled
NotInstalled
NoConcern
NoConcern
NoConcern
E102
C101Surface Condenser
NEM
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E103
C101VacuumJetCooler KORTING
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E104
C101TurbineGland Condenser
RHEINKALTE
Noconcern
Noconcern
Noconcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E105A1
C102FirstStageAfter Cooler
BundlewasorderedwithCSmaterial
NoConcern
NoConcern
NoConcern
SSduplexbundlewasordered
Feb'97:After03monthsof operation,E105A1bundle(duplex tubes)startedleaking(top04rows CSbundlewasreplacedwithDuplexbundle. oftubeswasfounddamageddueto Thedecisionwasmadekeepinginviewthe bafflecutting)anddeclarednotfit replacementfrequencyofCSbundles(07 foruse.SinceBundleE105A1 bundlesreplacedsince1968).Dia.offloating (duplex)wasrejected,oldCSbundle NoConcern headofDUPLEXbundleissmalleras ofE105A2wasplacedinE105A1 comparedtoCSBundle. shellafterinspectingthecondition CSBundleinspectedduringTA96andtubes ofbothbundles.Andtheotherwas sentforretubing. werefounddamaged. CSbundlealsostartedleakingafter fewmonthsofoperationandlater wasreplacedbyretubedCSbundle. Feb'97:Bundlepulledoutand inspected.02tubeswerefound brokenduetobafflecutting, damagedtubepulledoutandbaffle holeswereplugged.Bundletubes, tubesheetandbaffleplatewere NoConcern foundlittlecorroded.UToftubes wascarriedoutandfoundOK. Pulledbundlewasagaininserted backintoshell. Coatingofshellwascompletely damaged.
NoConcern
OldCSbindlewasreplacedby newDuplexSSbundle
E105A2
C102FirstStageAfter Cooler
BundleA2(B)withCSmaterialwasordered
NoConcern
NoConcern
NoConcern
SSduplexbundlewasordered
NoConcern
NoConcern
BRONSWERK FEYENOORD
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
ModifiedbundleA(upper)wasinstalled. 1.Designchangedbyinstalling12lesstubes. 2.Reconstructionoffloatinghead(BCsmaller diameter,suitableforcamprofilegasket). 3.TubesinternallycoatedwithZacosin2000 Q. NoConcern Meanservicelifeis8years. OldBundlepulledfromtheuppershell clearedhydrotestinTA96at8.5bar. ThesamebundlewasplacedinE106B. BundleB(A2)removedfromE106(lower) wasscrapped
NoConcern
E107A2
Oct.1969,Nov.1971,May1973 UltraSonicwallthicknessmeasurementofshellwas carriedout.Itwasok. Feb1975 DuringT.A,bundlebuilt1967waspulledandwas replacedwithanewreservebundlewithcoatedtubes (Zacosin2000Q)built1974wasinstalled. Sept.1975 NoConcern Orderwasplacedforthenewbundle. March1983 Totaltwotubeswereplugged.Bundlewascleanedby meansofhighpressurewaterjetting.Itwastestedat 5barsandwasok.Someblisterswereobservedon thecoating. April1986 DuringT.A,bundlewaspulled.Newbundlebuilt1981 wasinstalled.
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E107A1
Oct.1969,Nov.1971,May1973 UltraSonicwallthicknessmeasurementofshellwas carriedout.Itwasok. Feb1975 DuringT.A,bundlebuilt1967waspulled.Anew reservebundlewithcoatedtubes(Zacosin2000Q) built1974wasinstalled. Sept.1975 NoConcern Orderwasplacedforthenewbundle. March1983 Totaltwotubeswereplugged.Bundlewascleanedby meansofhighpressurewaterjetting.Itwastestedat 5barsandwasok.Someblisterswereobservedon thecoating. April1986 DuringT.A,bundlewaspulled.Newbundle(built 1981)wasinstalled.
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E107A2
May1968,Oct.1969,Nov.1971: UltraSonicwallthicknessmeasurementofshellwas carriedout.Itwasok. Feb1975 DuringT.A,Tubeswereinternallycleanedbymeansof highpressurewaterspray.Tubestothechannelside wereslightlycorroded.Floatingheadandcovers showedsomepitcorrosion.Noleakedtubeswere April1991 observed. DuringT.A,bundlebuilt Oct.1976 1976waspulled.Bundle Bundlewaspulled.Newbundlebuilt1976withcoated NoConcern built1990wasinstalledin tubes(Zacosin2000Q)wasplacedinitsplace.Ultra E107A2shell. Sonicwallthicknessmeasurementofshellwascarried out.Itwasok. June1981 Channelcoversandfloatingheadweredismantled. Inspectionwascarriedout.Someblisteringwas observedonbothsides(eastandwest)ofthecoating. April1986 Onetubewasremovedforthepredictionofthe remaininglifeofthebundle. Mar.1983 Thetubesandtubesheetswerefounddirty.Itwas cleanedbymeansofhighpressurewaterjetting.After cleaningthebundle,itwasagaininspected.Corrosion ofabout0.1mmintubesand0.5mmintubesheet NoConcern wasobserved. June1988 Bundlewascleanedbywaterjetting.Pittingcorrosion ofabout0.5mmwasobserved. May1973 Condenserwasopenedforinspection.Headswereok. Tubesendconnectionswerelightlycorroded.. Mar.1983 DuringT.A,Shellwiththebundlewasinspectedandit wasdirty.BundlewasgivenforRetubing.After NoConcern retubing,bundlewastestedatapressureof6bars andaccepted. June1988 Outsidetubesconditionwasgood.Pitcorrosionof0.2 mminsidethetubeswasfound.Pittingcorrosionof 0.5mmwasalsofoundontubesheet. 3leakedtubesofE110Ebundlewereobservedand plugged.E110Dbundlewasinstalled. E110Dbundlewas removedandE110C bundleinstalled.
NoConcern
NoConcern
NoConcern
NoConcern
E108
C102Surface Condensor
NEM
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E109
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E110
SecondaryReformer SteamGenerator
KOERVERUND LERSCH
Nodataavaialble Tubes/tubesheet/channelwereinspected andfoundgrooveonchannelgasketsurface (acceptable).Blackdustwasfoundatthe outletandwascleaned.MPIwascarriedout Clampwasinstalledon fornozzlesandfoundok.Wallthickness NoConcern NoConcern NoConcern thermocoupleT130torectify measurementwasalsoconductedandfound leakage. ok. Coldendwasopenedbuttubeendspastthe tubesheetwerenotinspectedforcorrosion damage. BundleCrepairedbecauseof Retubingandmodification leakingtubes,certaintubeswere ofthereservebundleB plugged.Duringhydrostatictesting, wasdone. waterfromdiaphragmalsoshowed MajorModificationswere: leakages.oneweeklaterrepair 1.Changeintubepattern procedurewasmadeanditwas oftubesheetaccordingto Modificationandretubing repairedaccordingly. E112bundledrawingEC completed.01leakingtubewas Shellwasvisuallyinspected,surfaceofgasket Recommendationwasfloatedthat 0103E112011. ofshellflangewasslightlydamaged,was olddiaphragmmustbereplaced foundduringpressuretest, 2.Atotalof22tubescould withanewone.Atthisstageslightly therewaspressureoftotal10 repairedanddeclaredok. notbeinstalleddueto Scratcheswerefoundincladdingagain. damaged9tubeswerepluggedin barinBundleB. changeintubepattern. thetubesheet. Newdiaphragmwasinstalled Insulationfromshellwasremovedfor NoConcern 3.Removetheinstalled butDPTshowedthatwelding inspectionandnozzlesN1andN2werealso Total26tubeswerepluggedi.e. "HollowPlugs"and"Bar wasnoteffiecient.Newgasket inspected.Wallthicknesswasalsoacceptable about5.5percentoftotal464. Plugs"whichareintotalof wasalsoinstalledatoutlet . approx.16pieces. flange BundleB(builtin76)afterretubingin95was DuringpressurizingwithN2another 4.Install"HollowPlugs"in installedagainandwasnamedbundleC. tubewasfoundleaked.Sometubes remainingtubesheet werepreventivelypluggedalso. holes. Total55(12%)werepluggeduptill 5.Modificationand 97. improvementoftubeto Hydrotestunder170bargpressure tubesheetconnectionbya wascarriedoutandwasokayed. revisedweldingandrolling procedure. IntheTAof1996theE113resistakenout andoriginalbuddleE113Awhichwas repairedin1995isinstalledithasbeen hydrotestedandisclear.FurtherDPTwas conductedontheshellofE113Aandthe liftinglugsarefounddamagedsotheyare repaired.Thisisthebuddlethatwasshifted toPakistan
E111
HTSEffluentHPBFW Heater
LUIGIRESTA
NoConcern
NoConcern
NoConcern
NoConcern
100 KE-6
E112
LTSfeedwater Exchanger
KOERVER UNDLERSCH
BundleB(reservebundlebuiltin76)wasinthe service.
DuringTA'91oldbundleB (reservedbundlebuiltin 76)wasgivento Stoomwezenforperiodic Itwassuggested inspection.Bundlewas toremove22 pulledoutduetoleaking tubesfromBundle NoConcern B.Itwouldbe tubes.Claddingwas damagedduringbundle retubedand modified. pullingactivity.OldA bundle(BuiltYear75)was installed.Everythingelse wasfoundok.
StartupdonewitholdHeatexchanger.
3Tubesleaked.PlantS/D.Pluuged
100 KE-7
E113A
SemiLeanSolution RegeneratorReboiler
D.BONALDI
E113Abundleispulledoutandinspectedfoundok andinsertedbackin
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
100 KE-7
E113B
SemiLeanSolution RegeneratorReboiler
D.BONALDI
In1989thereservebundleispulledoutofE113B shellandoriginalE113Bbundleisplacedinshell.
NoConcern
NoConcern
NoConcern
ThebundleofE113Bispulledout, hydrotestedandvariousinspectionswere Leakagewasdetectedfromshell performed.Bundlewasfoundokandinserted NoConcern inletflangeandflangewas backin.Thisisthebundlewhichwasshifted renewed backtoPakistan.FurtherDPTofshellis conductedandlugsarerepaired.
NoConcern
NoConcern
NoConcern
100 KE-7
E114
REGENERATORSTEAM REBOILER
D.BONALDI/ CERMAITALIA
In1991thebundlewas pulledoutandinspected. Duringthisinspection eleven(11)tubeswere foundleakingandwere plugged,makingatotalof fifteen(15)plugged Inaninspectionin1986,four(4)tubesweredamaged tubes.Outoftheeleven duringbundlepulling.Thesetubeswereplugged. tubeswhichwerefound NoConcern In1990inspectionswerecarriedoutandnoissuewas leakingonetubehad found.Bundleinsertedbackinside. completelytornoffinto twohalves.Alsothere wasleakageinchannel headcovergasketthe coverandshellflange surfaceswererepaired throughmachiningand gasketreplaced.
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E115
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
none
E117
1500#SUPERHEATER
KOERVER UNDLERSCH
Bundlepulledoutfor inspection.Bundleand shellfoundsatisfactory. NoConcern MPIofreinforcmentpad andnozzlewascarried outandfoundok. OldE118wasremoved. AspartoftheEncon3 projectacompletelynew unitE118Cisinstalledin itsplace.Thisexchangeris NoConcern biggerandbetterthanits predecessor.Thenew exchangerE118Cwas builtin1988to1989by LugiResta. April1991 Channelsdismantled. Exchangerforan alternativeperiodic inspectionwasofferedto NoConcern Stoomwezen.No abnormalitieswere found.UltraSonicwall thicknesswasmeasured.
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
None
100 KE-5
E118
D.BONALDI/ CERMAITALIA
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E119
ProcessCondensate Cooler
WERKSPOOR
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E120A/B
METHANATORFEED EFFLUENTEXCHANGER
BRONSWERK FEYENOORD
NoConcern
NoConcern
NoConcern
NoConcern
Apr'96:Bundle/shellwasinspectedandfound OK.Excessivesoilisfoundonlowersideand wascleanedthroughwaterjetting. Eastsidetubesheetflangeleaked.Clamp installedontubesheetflangewasremoved andcut(15mmwide,6mmdeep)was observedonthesurfaceoftubesheetflange. NoConcern Itwasrepaired. Jun'96:Leakagefromsameflangestarted againanditwasdecidedtousegasketwith greaterthicknesshoweverthiswasnot worked.Clampwasinstalledforrectification howeveritalsowasnotworked.Thenitwas decidedtoweldtheclamponbothsides circunferentiallyalongtheflange. In1996aleakagewasdetectedfromthe channelheadcover.Thediaphragmsurface wasweldedandmachinedforproperseating NoConcern andsealing.Theleakagewasrectified. Furtherinspectionsweredoneonthebundle andnoconcernwasfound.
NoConcern
100 KE-9
E121
In1991,anewbundle whichwaspurchased In1990thematerialofthediaphragmofthe fromOlmiandwas OLMIITALY/D. METHANATORSTARTUP exchangerwaschangedfromInconel600toCSasper installedinplaceof BONALDI&CO. EXCHANGER areportonserviceswithlessamountofhydrogendid existingone.Theold CREMA notrequireInconelmaterial. bundlewassenttothe yard.
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
100 KE-9
E122
METHANATOR EFFLUENTCOOLER
BRONZWERK FIJNOORDN.V
NoConcern
ChannelheadcoversofE122B In1994duetoan wereremovedandheavypitting emergencyshutdown andcorrosionwasobservedon resultingfromCGT102trip gasketsurfacesofchannelhead E122Bwasopenedand coverandshell.Theshellside In1996thecorrodedsurfaceswerecleaned thepartitionplatewas surfacewasveryseriously andthegasketsurfaceswererepaired.The foundinbulgedform(the corroded.Furtherthe exchangerwascompletelycleanedbyjetting. reasonwasunknown),the protrudingareasofthetubes Duringthisyearitwasplannedtobuyanew tubeswerecleanedvia fromthetubesheetwere exchangerwithimproveddesigntosolvethe hydrojetting.During corrodedandwerecarryingdirt. problemofcorrosionanddirtaccumulation. variousinspectionsone Itwasdecidedthatthe baffleplatewasalsofound exchangerwouldbecleaned andrepairingwillbedonein inbulgedform. TA96.
AnewbundleE122C wasmade.This exchangerhadan improveddesign.This hasfourpassesinstead ofsixasperoriginal design.Thiswasdoneto NewE122Cisinstalledinthe reducetheflow year2000itwasonly requirementsofcooling operationalfortwomonths waterandalsoto andnoissuecameuoduring increaseflowvelocity, thosemonthsthisisthe sothatlessdeposits exchangerthatcameto weremadebytheCW Pakistan andcorrosioncanbe reduced.Further changesindesignwere incorporatedbearingin mindtheabove mentionedproblem rectifications. NoConcern NoConcern
E123
100 KE-10
MethanatorEffluent Chiller
KORPERSHOEK
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E124
SYNGASDRYER
D.BONALDI&C. NoConcern
Bundledrawnand cleanedbymeansof waterjetting.Inspection/ repairprocedure prepared.Bundle transportedtocompany forHeymanssealwelding oftube/tubesheetjoints NoConcern accordingtoapproved procedurewasdone.Leak testedbyairandDPT performedandapproved ok.Gasketsurfaceswere machinedandthickness monitoredofshelland tubes,foundok.
NoConcern
NoConcern
NoConcern
Exchangerwasopenedandthoroughly inspected,twobaffleplateswerefound damaged.Theyhaveacrosstearof5cm.It wasdecidedaftercalculatinganddiscussions withStoomwezenthatthishadnomajor influenceinoperationofexchangerso nothingwasdoneaboutit.Furthertheshell wasinspectedandacrackwasobservednear theshellsupport.Itwasgrindedandwelded againDPTperformedandfoundok.
NoConcern
NoConcern
E131
Feb.1987 Bundlewastestedat8bars.Tubesheetjointfaces wereheavilycorroded.Sometubeendconnections werealsocorroded. NoConcern June1988 Thebundlewasretubed.Gasketsurfacewasrepaired. Everythingwasok. May1973 Exchangerwasopenedforinspections.Corrosionwas foundonthetubesheets. April1979 DuringT.A,bundlewascompletelyretubed. May1981 Coverswereremoved.Bundlewaspulledandshell visuallyinspected.Slightcontaminationobserved.
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E132
CT104GlandCondensor
FUNKE DUITSLAND
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
100 KE-12
E133
CONVERTORFEED/ EFFLUENTEXCHANGER
In1990diaphragmwasreweldedtoremoveleakage. NoConcern
NoConcern
NoConcern
NoConcern
Inaninspection carriedoutduringthe year1998itwas suspectedthattheE 133anditsnozzle gasketswereloose Duetoanemergencyshutdown andsoconcentration resultingfromaleakagefromE112, ofammoniacouldbe asampleconnectionwasaddedin detected.ThusinTA theE133&E134exchangers. of1998boltswere properlytightened andspringtype washerswere introducedtoensure bettertightening.
100 KE-12
E134
CONVERTORFEED/ EFFLUENTEXCHANGER
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
100 KE-12
E135A
NoConcern
NoConcern
NoConcern
In1996E135Dwasopenedforinspection andboltheads&metalpieceswerefoundon thepartitionplate.Aftertestingleakagewas detectedand01tubewaspluggedand welded.Thentheexchangerwasagaintested at50barthistime09tubeswerefound leaked.Thesetubeswerepluggedand welded,afterweldingexchangerwastested againat110barthistimeagain04tubes werefoundleaked.Theywerepluggedand weldedafterthisagaintestwasconducted andleakagewasfoundinsealweldsfortube NoConcern totubesheetjoint,thesewereweldedand testedagainthistimesealweldsofmore tubeswerefoundleakingsowithagreement ofbothprocessandoperationtheexchanger wasboxedup.Whenexchangerwasboxed upandtakenintoserviceexplosivitywas measured,theresultsshowedthattherewas leakagefromthediaphragmfromtwo locations.WhencoverwasremovedandDPT wasconductednoporesorcrackswere found,henceboxedup.
In1998E135Dwas nitrogentestedand lowersideplugs showedsome leakages.Thesewere weldedandtested again,itwasfound ok.Thediaphragm wasweldedandDPT conductedand exchangerwasboxed up.
In1999operationand processdepartment suspectedaleakageinE Intheyear2000,afterseveral TheexchangerE135Dwas 135Dlowersidetubes andthoroughinspectionsa plannedtobescrappedsoin thustheexchangerwas crackwasfoundatthebottom Pakistan,abrandnew openedbutaftertesting oftheheadofE135D.This exchangerE135Iwhichwas crackwasweldedandNDT nothingwasfound, builtin1999wasinstalledin wasperformedandapproved. Pakistan. henceboxedup.A brandnewexchangerE 135Iwasbuiltin1999.
100 KE-12
E135B
In1991E135H,which wasacombinationofE 135Eshelland completelynewbundle, In1975E135Bistakenoutfrombottomlocation wasinstalledinlocation andtakentoyard.InitsplaceE135Eisinstalled.In ofE135B(bottom 1983E135EistakenoutfrombottomlocationandE location).ThebundleE 135Gisinstalledinitsplace.In1984itisdecidedthat NoConcern 135Gwhichwas thebundleofE135Ewillbetakenoutanditsshell removedfromthe willberetained.BundleE135Hwillbemadeand bottomlocationistested, placedinshellofE135E. repairedandplacedin yardundernitrogen pressure;thisexchanger isingoodcondition
NoConcern
NoConcern
NoConcern
NoConcern
In2000thelowerbundleE 135Hisopenedandalmost In1999operationand 20kgofforeignmatteris foundonthepartitionplate. processdepartment suspectedaleakageinE Ananalysisofthematteris 135,thiswasonthe madeandfoundthatitis TheexchangerE135Hwas basisofhighammonia catalystdustfromconvertor. replacedbythesparebundle percentageinBFWtoD Theexchangeristhoroughly E135GinPakistanandnow 105,theleakagewas tested.02leakedtubeswere E135Gisinservicefurther soughtforintopbundle pluggedandaccordingtoa thatE135Hisgoingfor E135Dwhichwasok plan03tubeswereplugged refurbishment. butactuallyprocess aroundeveryleakingtube. foundthatleakagewas Henceatotalof08tubeswere inlowerbundleE135H pluggedandwelded.Afterthe abovementionedjobsthe exchangerwasboxedup.
100 KE-12
E136A1
Feb1971 19tubesweredamaged.Thesetubeswereplugged andsealweldedwithSL12(lowhydrogen)electrode. DPtestofsealweldwasperformed. August1972 13leakedtubeswereobserved.Thesewereplugged. April1991 SCHELDE Totalnumberofpluggedtubeswas32.DPtestofseal SYNTHESISCONVERTOR E136B1built1967was weldwasperformedandapproved. EXOTECH pulledoutandE136B2 EFFLUENTEXCHANGER (BUNDLE)/KLK Jan.1973 built1974wasinstalled. Tenmoreleakedtubeswereobserved.Thesewere pluggedwithSL12electrode.Totalnumberofplugged tubeswas42. Mar.1983 E136resbundlewaspulledandE136B1built1967 installed.
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E136A2
May1973 BundleE136A2built1967waspulledandcleanedby highpressurewater.Slightcorrosionwasobserved. Bafflesalsoshowedsomepitcorrosion.Sealingstrips weredamaged.Thesewererepaired. December1974 Coversanddiaphragmwereremoved.4Leakedtubes NoConcern wereobservedandplugged.35tubeswerealso pluggedduetopreventivemaintenance.Total39 tubeswereplugged. Feb.1975 Bundlewaspulled.NewE136A2built1974was installedintheshellE136A2shell.
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E136B1
March1973 Thewallthicknessofthebundlewasreducedto30to 40%ofthenominalwallthickness.Bundleputinshell andpressuretestedatabout8kg/cm2.Total233 tubeswereplugged. August1973 44moretubeswerefoundleakedandplugged.Total numberoftubespluggedwere277. Sept.1973 Atthistime19othertubeswereplugged. NoConcern March1974 Duringthisbriefshutdown,theremaining352tubes werealsopluggedsonowall648tubeswereplugged. Oct.1976 E136B1built1967waspulledoutandE136A1built 1967installed. Mar.1983 E136A1bundlewaspulledandE136resbundle installed.
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E136B2
Feb.1975 E136B2bundlebuilt1967waspulledoutandE136 B2built1974installed. June1981 Thebundlecoatingwasinspectedandtheoverall NoConcern conditionofthecoatingwassatisfactory. June1988 E136B2bundlebuilt1974waspulledoutandE136 A1built1975installed.
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
100 KE-13
E137
NoConcern
NoConcern
Shellwasvisuallyinspected andfound 1.Corrodednozzles NoConcern 2.Covercoatingwasloose 3.Thecoatingonheadwas alsoreduced Shellwasvisuallyinspected andfound 1.Corrodednozzles NoConcern 2.Covercoatingwasloose 3.Thecoatingonheadwas alsoreduced
ObservationsfromTA'94wererepaired
NoConcern
NoConcern
NoConcern
NoConcern
100 KE-13
E138
NoConcern
NoConcern
ObservationsfromTA'94wererepaired
NoConcern
NoConcern
NoConcern
NoConcern
100 KE-13
E139
AMMONIABOOSTER COMPRESSORCOOLER
N.VDE PLAATWELLERIJ
NoConcern
NoConcern
NoConcern
NoConcern
100 KE-16
E145A1
AMMONIAABSORBER EXCHANGER
BRONSWERK FIJNOORDN.V
NoConcern
NoConcern
NoConcern
DuringanemergencyshutdownE 145A1,whichwasinstalledinplace In1996thebundleE145A1waswaterjetted ofE145A2,wasinspected.Ithad aftercleaningagainpittingcorrosionwas NoConcern heavycorrosionontheportionof observedbutthiswasinacceptablerange. thetubesprotrudingoutofthe tubesheet. May1997 LeakagewasobservedinA1bundle April1996 andwastakenoutandretubed Visualinspectionofshell,cover,andchannel bundleA3wasinstalled.After andgasketsurfacewasdone.Gasketsurface NoConcern pulling,theshellwasvisually wascorrodedandrepaired. inspectedandfoundthatpartition platedeformedtowardstopside.
NoConcern
NoConcern
E145A2
AMMONIAABSORBER EXCHANGER
BRONSWERK FIJNOORDN.V
LeakedA2bundlewaspulledoutandretubedA1 bundlewasplacedinA2shell.Aug.1988 Fiveleakingtubeswereplugged.A3bundlewas replacedbyA2bundleinA3shellduetotheleakage NoConcern problem. Jan.1989 DuringshortshutdownofammoniaplantA2bundle waspulledoutfromA3shell.A3retubedbundlewas placedinshellA3.A2wasthenplaceintheyard. Aug.1988LeakedA3bundlewaspulledand replacedbyA2bundle.A3bundleretubedandtested on30bars.A3bundlewasonstandby. Jan.1989 NoConcern DuringammoniaplantshutdownA2bundlewas removedandA3retubedbundlewasinstalled.Gasket surfacewasseriouslycorrodedandrepaired.
NoConcern
NoConcern
NoConcern
NoConcern
E145A3
AMMONIAABSORBER EXCHANGER
BRONSWERK FIJNOORDN.V
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E146
T106AquaAmmonia StripperBottom
UHDE
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E147
T106TopCondensor
March1977 Thebundleofyear1967waspulledandthebundle builtin1977wasinstalled.Atthelevelofthelocations April1991 KOERVER& ofthebaffles,theshellwascorrodedtoabout0.5 Bundlewaspulledand NoConcern LERSCHKREFELD mm.June1988 cleanedbywaterjetting. KESSELFABRIK NewbundleofDuplexmaterialwasinstalled.
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E148
T106Reboiler
KORPERSHOEK
Feb.1987 Onetubewasplugged.
April1991 Bundlewaspulledand cleanedbywaterjetting. Shellwasquiterusty. Recommendationwas givenforbrushcleaning NoConcern andcoatingrepair.Flange renewedduetothe damageonthegasket surface.
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E150
ColdExchanger
RUHRSTAAL
Itwassuggestedtoinstalldiaphragmwithdifferent material
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E151
CT105GlandCondensor RHEINKALTE
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E153
C102TurbineGland Condensor
April1976 Completebundlewasretubed. June1981 Tubeswerestronglycorrodedandgasketsurfacealso corroded. RHEINKALTE/RVH NoConcern June1988 Bundlebuilt1967waspulledandreplacedbynew bundlebuilt1988.
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E154A
C101Lube&SealOil Cooler
BRONSWERK NIJKERK
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
Visualinspectionofshell,bundleandchannel coverwasdone.Ontheeastsideandwest NoConcern side,coatingatonelocationoftheplate disappearedandrepairedandok. April1996 Visualinspectionofshell,bundleandchannel coverwasdone.Ontheeastsideandwest NoConcern side,coatingatthreelocationsandone locationrespectivelyoftheplatedisappeared andrepairedandok.
NoConcern
NoConcern
NoConcern
E154B
C101Lube&SealOil Cooler
BRONSWERK NIJKERK
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E157A
C104Lube&SealOil Cooler
LAUFER
NoConcern
NoConcern
NoConcern
NoConcern
E157B
C104Lube&SealOil Cooler
LAUFER
NoConcern
NoConcern
NoConcern
NoConcern
June1995 Mar.1994 Byvisualinspectionofthe Visualinspectionwas exchanger,itwasfoundthatthe NoConcern done.Slightcorrosionwas gasketsurfacewasdamaged.It foundinsidethetube. wasrepairedandok.
NoConcern
NoConcern
E158A
C105Lube&SealOil Cooler
BRONSWERK NIJKERK
Dec.1984 Bundlewaspulledandcleanedbywaterjetting. Bundlewasingoodcondition.Partitionplateslightly damaged. NoConcern June1988 Coatingwasdamagedontheeastsideduetothe mechanicalwork. June1988 Coatingwasdamagedontheeastsideduetothe mechanicalwork.
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E158B
C105Lube&SealOil Cooler
BRONSWERK NIJKERK
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E159A
C103Lube&SealOil Cooler
June1985 Theoriginalbundlewasremoved.Newcoatedbundle whichwasmadein1984andinstalled.June1990 Bundlewaspulledincaseofleakage.Onetubewas NoConcern pluggedaswellaswelded.Twomoretubewere alreadypluggedandnowwelded.Pittingwasfound insidetheshell. June1985 Theoriginalbundlewasremoved.Newcoatedbundle whichwasmadein1984installed. Dec.1989 NoConcern Leakagewasfoundonthenozzle.Temporarily repaired.
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E159B
C103Lube&SealOil Cooler
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E165
LTSCatalystReduction Cooler
KORPERSHOEK
Oct.1979 Innersideofthetubeswasheavilycorroded.Two leakedtubeswereobservedandplugged. Nov.1979 Bundlewascompletelyretubed. Dec.1979 NoConcern Bundlewasinstalled. Sept.1985 Aleakagewasfound.Bundlewaspulledandsentfor retubing. Oct.1985 Bundlewasplacedinshell.
July1992 Bundlewastested at6bars.21tubes wereclogged.It wascleanedby NoConcern highpressure waterjetting.No leakagewas found.
NoConcern
NoConcern
NoConcern
NoConcern
May1998 4leakedtubeswere observedand plugged. Nov.1998 Exchangerwastaken outofservicebecause NoConcern ofleakage.Itwas inspectedand7 leakedtubes observed.Thesewere plugged.Itwas recommendedtobuy thenewbundle.
E172
F101MAINSTEAM SUPERHEATER
Wallthicknessmeasurementswerecarriedoutand wasacceptable.
Wallthickness measurementsand magneticsurveywas conductedatthecoils, andnodiscrepancies werefound.Hydrotest wasperformedat175 bar.Itwasalsoofferedto NoConcern Stoomwezenfor inspectionandwasfound acceptable.Weldolets andcircumferentialwelds werealsomagnetically examined.
NoConcern
NoConcern
E172superheater78V(25years): Itwasvisuallyinspectedandnoparticulars weredetected. research: TheweldsontheheadersofEI72,tothe extentpossibletoreachweremagnetically investigatedandwasfoundacceptable. Also,theweldingoftheinletandoutletof mainsteamsuperheaterwasmagnetically NoConcern investigatedandwasfoundacceptable. Moreover,theinletandoutletheaderofE 172wasultrasonicallyexaminedconcerning wallthicknessandwasfoundacceptable. Thesuperheaterwasperiodicallytestedon 141.2bargandforthestandingtimeof1 hourbyStoomwezenandwasfoundinorder. Alsoafter25years,inspectionwasdoneby Stoomwezen,andwasfoundokay.
NoConcern
NoConcern
NoConcern
E173
F101ISOLATEDSTEAM SUPERHEATER
NoConcern
NoConcern
NoConcern
NoConcern
E173superheater(25yearsoflife)was visuallyinspectedanddidnotshowany abnormalities.. TheweldsontheheadersofE173,tothe extentpossibletheywerereachablewere magneticallyinvestigatedandfound acceptable. Also,theweldingattheinletandoutletof NoConcern separatesteamsuperheaterwasmagnetically investigatedandfoundacceptable. Moreover,theinletandoutletheaderE173 wereultrasonicallyexamined,concerning shellthicknessandfoundacceptable. Thesuperheaterwasuncoatedandwas offeredtoStoomwezenforperiodic inspectionanditwasalsofoundinorder.
NoConcern
NoConcern
NippleofASTMA105was usedbymistakeduring replacementoftwovent valves.P11materialwas specifiedinBraunspec. ItwasthendecidedthatASTM A105nipplewillbereplaced bynippleofmaterialGradeP 11. Theweldwas penetrant examinedandfoundinorder.
E174
F101PREHEATCOIL "B"FEEDGAS
NoConcern
InEncon4project,the pipebetweenE174andE 174Bwasremoved.Inlet headerofE174was connectedtoline10" NoConcern GF142.Systemwashydro testedat67bar.Itwas conductedby Stoomwezenandfound acceptable. DuringtheEncon4, headerswerechanged. Devicewashandedover toStoomwezen. NoConcern Connectingpipeswere changedduringTA'91. Weldoletweldingwas magneticallyexamined.
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E174B
F101PREHEATCOIL "B"FEEDGAS1981
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E175
F101ECONOMIZER
USwallthicknessmonitoringwasdone,no particularitieswereobserved
NoConcern
NoConcern
EconomizerE175wasvisuallyinspected.and noabnormalitiesweredetected. TheweldingtotheheadersoftheE175asfar aspossibletoreachwasmagnetically investigatedandwasfoundacceptable. Also,theweldingattheinletandoutletof economizerwascheckedandmagnetically NoConcern inspectedandwasaccepted. Moreover,theinletandoutletheaderE175 wereultrasonicallyexaminedconcerningshell thicknessandwasfoundacceptable. Theeconomiserwasperiodicallytestedon 170bargwithastandingtimeof1hourby Stoomwezenandwasfoundinorder.
NoConcern
NoConcern
E179A
ExpanderDynanom.Oil Cooler
Sept.1971 3tubeswereplugged.Pitcorrosionwasalso observed. Oct.1971 TwosparebundleswereprocuredforE179AandB. Oct.1972 Thesparebundleswereinstalled.Oldbundleswere scrapped. June1981 Tubes,tubesheetandgasketsurfacewerehighly corroded.
NoConcern
NoConcern
NoConcern
NoConcern
Aug.1995 Coatingofthetubeswasdone.
NoConcern
NoConcern
NoConcern
NoConcern
E179B
ExpanderDynanom.Oil Cooler
Oct.1971 TwosparebundleswereprocurcedforE179AandB. Oct.1972 Thesparebundleswereinstalled.Oldbundleswere scrapped. May1973 Tubeswerecorrodedovertheentiresurfaceto0.3 NoConcern mmdeep. Feb1975 Newbundleofcoatedtubeswasinstalled. June1981 Tubes,tubesheetandgasketsurfacewerehighly corroded.Itwasobservedthatthetierodswere slightlybent. Feb1975 Tubeswereinternallyinspectedandthecoatingwas ingoodcondition. June1981 Tubes,tubesheetandgasketsurfacewerehighly corroded.
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E179C
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E182A/B
C106LubeOilCooler
NoConcern
NoConcern
NoConcern
NoConcern
Bothbundles(A/B) weredismantled. Feb1997 Theywerecleaned.It BundleBwastestedwithair.Two wasfoundthatthe NoConcern leakedtubeswereobserved.These bundleswereseverely wereplugged. corroded.New bundleswere installed.
NoConcern
E183
CT106GlandCondensor RHEINKALTE
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E1851/2
NOCONCERN
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E186A
T107Overhead Condensor
KOOIMAN PAPENDRECHT
E186B
T107Overhead Condensor
KOOIMAN PAPENDRECHT
Dec.1977 Decisionwasmadetobuythenewbundleassomany tubeswereleaked.Materialofthetubeswaschanged toSS316L.Orderwasplacedandequipmentwason thesiteinMay1978.Bothchannelheadswereused NoConcern forthenewbundle. June1978 Newexchangerwasinstalled. July1982 BundleAwasscrapped. Mar.1983 E186BwastakenoutofserviceandnewE186Cwas installed. June1986 Therewasasuggestionforretubingandrepairofthe bundleandshell.Atthesametimenewtubematerial wassuggested. NoConcern July1987 Therewascorrosionproblemonthestripperunit. Therewasarecommendationforcompletenew equipmentwithduplexsteelmaterial. Oct.1988 Itwasscrappedandbothchannelcoversareusedfor E186D. NoRecordFound May1988 Newequipmentwasbuiltanddelivered.Bothchannel coversofE186Bwereused. June1988 Completenewshellandbundlewasinstalled. April1979 DuringT.A,bundlewaspulled.Itwaspollutedbythe blacksubstance.Frompreventivepointofview,25 tubeswereplugged.Thebundlewasagainputback intotheoperation. Nov.1981 14leakedtubeswereobserved.Thesetubeswere plugged.Nowtotal39tubeswereplugged.Itwas furthernotedthatthegasketgroovewasdamaged becausethecoverhadbeenmountedcrooked. Mar.1983 Newbundlewasinstalled. NoConcern April1991 Coverswere disconnected.Shellwas hydrostaticallytestedat 7.8bars.Itwasok.
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E186C
T107Overhead Condensor
MFBBREDA
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E186D
T107Overhead Condensor
RVHBORN
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E187
T107StripperBoiler
KOOIMAN PAPENDRECHT
NoConcern
NoConcern
NOCONCERN
NoConcern
NoConcern
NoConcern
NoConcern
E188
T107OverheadTrim Condensor
KOOIMAN PAPENDRECHT
Nov.1981 Bundlewastestedatapressureof8.5bars.Three leakedtubeswereobservedandplugged. Sept.1982 Duetoleakage,exhcangerwastakenoutofservice. Bundlewassentforretubing.Afterretubing,bundle wastakeninoperation. April1986 Exchangerwasdismantledforrepairwork.Corrosion wasfoundonthebacktubesheetofabout1mm. NoConcern Reartubesheetwasloose.Itwasweldedandrepaired. Oct.1986 Recommendationwasgivenforthenewmaterialof thebundle. July1987 Itwasrecommendedtobuyanewbundlewithduplex material. June1988 CompleteequipmentwasreplacedbyE188B(built 1988).
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E190A/B/C
RecycleCooler
GENIUS IJMUIDEN
E191A/B/C
AdditionalCooler
GENIUS IJMUIDEN
Jan.1982 Orderwasplacedforthemanufactureofthis Equipment. July1982 Equipmentwasinstalled. Jan.1982 Orderwasplacedforthemanufactureofthis Equipment. July1982 Equipmentwasinstalled. July1990 Orderwasplacedfortheequipment. Oct.1990 Equipmentwasinstalled.
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
E192
E174FeedGasHeater
HCG
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern
NoConcern