Generator Startup
Generator Startup
Flexible Operation
Parameter correction due to saturation effects Initial field flashing circuit & switching time Special dynamic turbine actions during start-up Detailed & user-programmable speed-governor system control System switching actions controlled by relay settings Variety of relay controls (Volt, Hz, V/Hz, dHz/dt) Motor acceleration at under-voltage & underfrequency conditions
Capabilities
Quick recovery of power to critical loads Determine optimum loading time Schedule of loading sequence Analysis of generator & motor starting behavior Analysis of governor & AVR starting behavior Diesel generator starting for critical applications such as nuclear generation plants Analysis of power recovery to critical loads when power grid connection is lost Cold-state starting of stand-by generator under normal & emergency conditions Motor acceleration & rejection Simulate relay actions automatically during analysis
Measurement PowerStation
Measurement PowerStation
Dynamic Models
Exciters Automatic Voltage Regulators (AVR) Governors Turbines Power System Stabilizers (PSS)
10 CFR 50 Appendix B 10 CFR 21 ANSI/ASME N45.2-1977 ASME NQA-1 ISO 9001 ANSI/IEEE Std 730.1-1989 CAN/CSA-Q396.1.2-89
Operation Technology, Inc. www.etap.com 17 Goodyear Irvine, CA 92618 949.462.0100 Fax 949.462.0200