0. Engineering Milestones
1. General
2. Process Diagrams 2.1 Block Flow Diagrams 2.2 Process Flow Diagram (PFD)
3. P&IDs
1. General The The process process industry industry describes describes its its plants plants and and their their instrumentation instrumentation by by a a P&ID P&ID
(pronounce (pronounce P.N.I.D.) P.N.I.D.)
P&ID P&ID is is one one of of the the 3 3 major major types types of of process process diagrams. diagrams.
2. Process Diagrams
to convert the physical reality or design concept to
Block Flow Diagram (BFD)
Typical FGD Plant is composed of the following 5 sections: - Flue Gas and GGH - Limestone Slurry Preparation - SO2 Removal - Gypsum Dewatering & - Utility section
>PFD is a schematic illustration of the system and more complex than a BFD. > Standard symbols are used to identify units.
2.2.2 PFD's - PFD's shows the relationships between the major components in the system. - PFD also tabulate process design values for the components in different operating modes, typical minimum, normal and maximum. - PFD's do not show minor components, piping systems, piping ratings and designations.
3. P&IDs 3.1 3.1 General General 3.2 3.2 Identification Identification 3.3 3.3 Importance Importance & & Responsibilities Responsibilities 3.5 3.5 Revisions Revisions and and Standards Standards 3.5 3.5 Wet Wet -- FGD FGD P&IDs P&IDs
Gate Valves;
function (here: valve) P&ID mixes pneumatic / hydraulic elements, electrical elements and instruments on the same diagram
ISA S5.1 - Instrumentation symbols and identification standard defines how each symbol is constructed using: graphical elements, alpha and numeric identification codes, abbreviations, function blocks, and connecting lines.
Field mounted
Identification letters
First letter Measured or initiating variable A B C D E F G H I J K L M N O P Q R S T U V W X Y Z Analysis Burner, combustion User's choice User's choice Voltage Flow rate User's choice Hand Current (electrical) Power Time, time schedule Level User's choice User's choice User's choice Pressure, vacuum Quantity Radiation Speed, frequency Temperature Multivariable Vibration, mechanical analysis Weight, force Unclassified Event, state, or presence Position, dimension X axis Y axis Z axis Well Unclassified Unclassified Relay, compute, convert Driver, actuator Unclassified Multifunction Safety Integrate, totalizer Record Switch Transmit Multifunction Valve, damper, louver Multifunction Momentary User's choice Orifice, restriction Point (test connection) User's choice Scan Time rate of change Light Control station Low Middle, intermediate User's choice Indication Ration (fraction) Glass, viewing device High Differential Sensor (primary element) Modifier Readout or passive function Alarm User's choice User's choice Control User's choice Succeeding letters Output function Modifier
Square root extraction of the input signal is part of FIC 101s functionality. FT101 is a field-mounted flow transmitter connected via electrical signals (dotted line) to flow indicating controller FIC 101 located in a shared control/display device
The output signal from TY 101 is a pneumatic signal (line with double forward slash marks) making TY 101 an I/P (current to pneumatic transducer)
TT 101 and TIC 101 are similar to FT 101 and FIC 101 but are measuring, indicating, and controlling temperature
FIC-101 output of is an electrical signal to TY-101 located in an inaccessible location. TY-101 output signal is a pneumatic signal (line with double forward slash marks) making TY-101 an I/P (current to pneumatic transducer). TIC 101's output is connected via a data link (line with bubbles) to the setpoint (SP) of FIC 101 to form a cascade control strategy.
P&ID revisions
P&IDs revisions shall be performed at the same time for all drawings, and in such a manner that a given revision number reflects the same status for all P&IDs issued.
Standards
Design of P&ID shall comply to engineering standards & rules and company internal regulations.
Flue Gas Booster Fan Gas-Gas Heater (GGH) Limestone Limestone silo & fluid. air fans Absorber & Limestone Slurry
Absorber & Gypsum Slurry Oxidation Air Fans Process Water & Filtrate Tank Emergency Storage Sump Hydrocyclone Station Belt Filter Gypsum Storage
01 02 03 04 05 06 07 08 /09 10 11 12 13 14 16
Flow sheet Symbols and legends Flue gas path Booster fan GGH Limestone slurry preparation Fluidizing air system Absorber system: Limestone slurry pipe & Gypsum slurry pipe Oxidation air fans Process water system Emergency storage system Gypsum slurry dewatering (Hydrocyclone Station) Belt filter Gypsum storage
FYI