General information/ Warranty and design considerations Engineering design certification Technical services Certification, standards and testing Peer Concealed Ceiling Steel Products Concealed ceiling systems product breakdown Concealed ceiling systems installation using TCR and Furring Channel Multidirectional clip C79S Direct fixing of furring channel/TCR system Direct fixing of Furring Channel Drop ceiling/ceiling bulkhead Fire Rated ceilings Acoustic STC rated ceilings Typical concealed ceiling joists Curved and raked ceilings Plasterboard installation Expansions and control joints Design notes Span table CCS01 Ceiling Joists Span table CCS02 Top Hat 50 Span table CCS03 Top Hat 75 Span table CCS04 Top Hat 60 Span table CCS05 16mm Ceiling Batten Span table CCS06 -10 TCR25 and TCR38 with FC18 and FC28 Span tables CCS11 Cyclonic ceiling Batten 22 mm Clip capacity table CCS12 Sectional properties table SP-01 FCDB 16mm Ceiling Batten Sectional properties table SP-02 FCCB 22mm Cyclonic Ceiling Batten Sectional properties table SP-03 FC 18mm & 28mm Furring Channel Sectional properties table SP-04 Top Cross Rail 25mm and 38mm Sectional properties table SP-05 Top Hat 50mm & 75mm Notes
CCS01 CCS02 CCS03 CCS04-05 CCS06-11 CCS11-12 CCS12 CCS17 CCS18 CCS19 CCS20 CCS22 CCS23 CCS24 CCS25-27 CCS27-28 CCS29 CCS30 CCS31 CCS32 CCS33 CCS34 CCS35 CCS36-38 CCS39 CCS40 CCS42 CCS43 CCS44 CCS45 CCS46 CCS47-48
Peer Industries PIF-MSC-011 Rev 05 16/10/07 Concealed ceiling systems technical manual
General Information
This Technical manual contains details of Peer Industries cold roll formed and pressed steel products. Peer Industries provide this manual for use by Architects, Engineers, Designers, Contractors and Sub-Contractors to assist in product selection and use. It has been prepared using relevant Australian Standards together with sound engineering principles substantiated through laboratory tests. Peer Industries cold roll formed and pressed steel products are economical, efficient and durable structural members suitable for a wide range of building applications. Peer Industries steel products are manufactured in accordance with the requirements of relevant Australian and New Zealand Standards.
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 1 of 47
Certification
Engineering Design Certificate
Umesh C Khatri RPEQ - 4829 is a registered professional engineer of Queensland and is an engineer with Peer Industries Pty Ltd being a manufacturer and supplier of the steel framing products. This is to certify that the span and height tables provided in this design manual for Peer Industries cold formed steel sections are in accordance with the requirements of the following Australian Standards: AS1538-1988/AS4600, Cold Formed Steel Structure Code. AS2785 -1985/2000 Suspended Ceiling Design and Installation. AS1250/4100 Steel Structure and Building Code of Australia. Umesh C Khatri RPEQ 4829 Customer Support Design Engineer BE Civil, CP Eng, MIE (Aust), RBP (Vic), RPEQ, NPER-3, MFIE, MIEI On behalf of Peer Industries Pty Ltd Dated October 2007.
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 2 of 47
The Height and Span Tables for Peer Industries steel products provides solutions for the following broad range of design conditions. Design loads which are uniformly distributed. Spans for single span, double spans and continuous spans as specified. Sizes of steel products with all dimensions. Steel products with nominated base metal thicknesses (BMTs). Load capacity tables with clip capacities
Contact our experts at Peer Design by email [email protected] , call for our nearest office on 1300 725 675 or visit our website at www.Peerindustries.com.au
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 3 of 47
The Application and finishing of Gypsum Plasterboard in framed dwelling construction. AS1250 AS3566 AS/NZS2785 - 2000 & AS2785 1985 AS4055 1992 AS3623 -1993 AS1170 0, 1, & 2 2002/1989 AS1170.4 1993 NZ4203 1992 AS1530.4 1990 AS1191 1985 SAA Steel Structure Code. Screws - self-drilling - for the building and Construction industry. Suspended Ceilings Design and Installation. Wind Loads for Housing. Domestic Metal Framing. Dead, Live and Wind Loads. Earthquake Loads. Seismic Code. Fire Resistance Tests of Elements of Building Construction. Test Methods for Laboratory measurement of Airborne Sound Transmission Loss of Building Partitions. Tests to comply with the Building Code of Australia C1.8
Tests
BRANZ Test Report STR 213: Peer Industries Pty Ltd cold-formed steel studs are tested in conjunction with Plasterboard conforming to AS2588 for: (a) Resistance to Static Pressure Tests to ASTM E72-80 (b) Resistance to Impact Tests to ASTM E695-79 (c) Surface Indentation Tests to AS 2185 Appendix A2. Steel studs were tested as specified in (a), (b) and (c) above (see Test Report STR 213). The results were checked for compliance with the Building Code of Australia 1990 (BCA).
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 4 of 47
CSIRO Test Report STR 019: Peer Industries cold-formed steel furring channels, top cross rails and battens are tested in conjunction with plasterboard complying with AS2588 for airborne sound transmission loss. Note: Airborne-sound-transmission loss = sound transmission class Rw 32 as per AS 1276-1979 and the BCA
Material:
Peer Industries cold roll formed steel sections and pressed products are manufactured from zinc coated steel strip conforming to AS 1397 for thickness up to and including 1.55mm BMT (base metal thickness). The steel strip for the various section sizes has a minimum yield stress of 300 Mpa.
Coating:
All Peer Industries cold roll formed steel sections are coated with zinc with a minimum coating mass of 220 - 275 grams/m2 as indicated.
Performance
Peer cold roll formed steel sections and pressed products will perform as specified if used in accordance with the recommendations and details set down in this technical brochure and related design references together with good trade practices. Any variations from these recommendations and details will require special design and detailing. Information in this brochure is current at the time of printing. Specifications and recommendations are subject to change without notice. Whilst every care is taken at the time of the preparation of this brochure, Peer accepts no liability for any errors or ambiguities. Contact Peer office to discuss any such concerns. For applications outside the scope of this design manual, contact Peer design on [email protected] or contact our nearest office by calling 1300 725 675 from anywhere in Australia.
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 5 of 47
Ceiling Systems are not Trafficable unless stated, and are designed to carry the weight of the ceiling only.
The Peer concealed ceiling system can be used in both fire rated and non fire rated situations using appropriate plasterboard or other suitable cladding materials. Peer Industries concealed ceiling systems can be used to build either a typical ceiling or an acoustically rated ceiling by using appropriate plasterboard. Acoustic ceilings with a specific STC rating can be achieved by using furring channel with resilient mounts and appropriate plasterboard. This suspended ceiling systems manual is designed to provide a general guide to the design and application of Peer Suspended Ceilings. For more information or design assistance related to systems outside those covered in this design manual, contact Peer Design by email on [email protected] or our nearest customer service centre by calling 1300 725 675 for further advice.
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 6 of 47
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 7 of 47
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 8 of 47
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 9 of 47
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 10 of 47
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 11 of 47
Misc Components
C54 C38 CDB38 CTP60 CFCSAM Adjustable suspension rod joiner Furring channel joiner 16mm batten joiner Suspension rod slab tap in anchor 60mm Furring channel screw adjustable mount (smart clip)
Top Hats
TH75-115 TH50-115 Top Hat 20x35x75x35x20 Top Hat 20x35x50x35x20
Ceiling Battens
FCDB FCCB22-61 16mm domestic batten Furring channel ceiling batten 22mm Cyclonic
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 12 of 47
Installation
(1) Typical Suspended Concealed Ceiling Systems using TCR & FC Refer to figs 01 to 27 Locate position of trusses or purlins or concrete etc and based on the ceiling plan, mark the position of the suspension rod brackets (Peer product code C74 or C47-74) on it at 1200 mm centres maximum along supporting members. Fix the C74 or C47-74 suspension rod brackets as appropriate to the side of the steel purlins or bottom chord of the trusses with two self tapping screws in shear and to concrete with appropriate anchors. Cut all hanging rods (Peer product code C21) to the required length. Assemble adjustable suspension clip for TCR (Peer product code C60) on all these suspension rods. Install all of these rods (Peer product code C21) into the suspension rod brackets C47-74. Attach Top Cross Rails (Peer product code TCR25 or TCR38) to the suspension clips (Peer product code C60). Connect Furring Channels (Peer product code FC18 or FC28) to top cross rails TCR25 or TCR38 with locking keys (Peer product code C39). Check and adjust the ceiling system using a laser or other appropriate levelling device. Install ceiling lining boards as per manufacturers specification
Plasterboard
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 13 of 47
Installation contd
Peer top cross rail Fix Hangers a maximum of 300 mm from the wall C21 Peer suspension rod Peer furring channel C60 Peer suspension clip
1200mm max
End of top cross rail 10mm clear of wall for fire rating
1200mm max
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 14 of 47
Installation contd
(1)Suspended Ceiling fixing of Furring Channels and TCR
Fig 04 Close up view FC18/28, C39, TCR25/38, C60 and Rod Combination
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 15 of 47
Installation contd
Supporting member
Peer C47-74 Note: 2 screw fixings in shear Note: 2 screw fixings in shear
Steel Framing
Timber Framing
Appropriate anchor
Peer C21 suspension rod Peer C47-74 fastened to timber framing/steel purlin with 2 screws in shear Peer C39 clip Peer C60 suspension clip Peer C60 suspension clip Peer top cross rail TCR
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 16 of 47
Installation contd
Peer Industries C79S multidirectional clip was designed specifically to make building a non standard (square or rectangular) ceiling easy The C79S clip is a multidirectional clip that will allow 360 degree rotation of furring channel to top cross rail. This clip has been specifically designed to address the problems
Fig 08 End view C79S multidirectional clip
encountered in the construction of irregularly shaped non square or rectangular ceilings. The use of this clip will simplify the construction of difficult ceilings and result in significant saving in construction time The C79S clip has been extensively load tested and complies with all relevant standards.
The C79S is manufactured from the highest quality corrosion resistant zinc plated steel available and is covered by Peer industries standard product warranty.
Peer top cross rail Peer furring channel
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 17 of 47
Installation contd
Steel or timber framing
Fig 13 Direct Fixing using C66 to Top Cross Rail 25/38mm then C39 to Furring Channel 18mm or 28mm
(2)Direct Fixing of Furring Channels Refer to figs 14, 15 and 16 Locate the position of floor joists or purlins or concrete etc and based on the ceiling plan; mark the position of the direct fix clips (Peer product code C26-80 or C26-180) on it. Fix the direct-fix clips C26-80 or C26-180 to the steel purlins or timber joists with two screws in shear and to concrete with appropriate anchors. Connect the furring channels FC18 or FC28 to the direct-fix clip C26. Check and adjust concealed ceiling system using a laser or other appropriate levelling device. Install ceiling board as per manufacturers specification
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 18 of 47
Installation contd
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 19 of 47
Installation contd
Peer C26-80 or C26-180 fastened to steel framing with 2/10x16 TEX screws (or equivalent)
Plasterboard
Drop ceilings are required to allow for ducting, mechanical and electrical services, or as a feature with maximum of 600 mm drop Locate the position of the drop ceiling and mark the position of suspension rod Brackets (Peer product code C74 or C47-74) as per detail on trusses, purlins or concrete based on the ceiling plan. Join top cross rails TCR25 or TCR38 to suit site situation as per detail. Alternatively join furring channel FC18 or FC28 to suit site situation as per detail in Fig 17. Install suspension rod brackets C74 or C47-74, suspension rods C21, top cross rails TCR25 or TCR38 and furring channels FC18 or FC28 as per typical suspended concealed ceiling system. Check and adjust drop ceiling and concealed ceiling system using a laser or other suitable levelling device. Install ceiling lining board as per manufacturers specification
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 20 of 47
Installation contd
Roofing or floor
Galvanised angle, C88 clip or screws Peer top cross rail 2 Screws 2 Screws Peer C39 clip C39 clip
2 Screws
600mm maximum
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 21 of 47
Installation contd
(4) Fire Rated Ceiling Install concealed ceiling system as above with fire rating requirement. For fire rating ceiling, use the ceiling board manufacturers specification and recommendations on installation. Provide a 20mm gap at the ends of both top cross rails TCR25 or TCR38 and furring channels FC18 or FC28 for fire rating requirements as per board manufacturers specifications and recommendations on installation.
Top cross rail span or suspension rod spacing 1200mm max End of top cross rail 20mm clear of wall for fire rating
35mm plasterers angle or Peer T18 / T28 with bottom flange aligned with bottoms of furring channel and fixed to wall at ends and 600mm centres max.
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 22 of 47
Installation contd
(5) Acoustic (STC) Ceiling C001, C001-SUS, CFCRESAM,CTCRRES and FC Resilient Mounts
C001
CFCRESAM
C79SRES
CTCRRES
Supporting members, timber or steel to be spaced at a maximum of 1200 mm centres. Locate the resilient mounts product no. C001 at maximum 600mm centres along supporting members. Fasten using appropriate fasteners dependant on the weight of the plasterboard being used. Locate the furring channel product no. FC18 or FC28 in the resilient mounts C001 Locate short lengths of furring channel FC18 or FC28 to support butt joins in second layer of ceiling lining or as per board suppliers specification.
Furring channel
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 23 of 47
Installation contd
(6) Typical Concealed Ceiling System - Ceiling Joists
Refer to Fig 20
Electrical, mechanical and plumbing services can make suspended ceiling systems difficult to install. The height of a project can also render the installation of a suspended ceiling system uneconomical. To solve this problem Peer steel studs can be used as ceiling framing members in areas such as corridors and bathrooms. Refer to span table CS-01 for ceiling joist sizes and spacing.
Mark position of tracks at ceiling level on wall as per working drawings. Fix these perimeter tracks with appropriate fasteners close to stud (ceiling joist location) at 600 mm maximum centres. Cut the studs to required length. Fit the studs in to the tracks. Provide and fix bridging members at the location as per table CS-01 Install ceiling lining board as per manufacturers specification.
Peer track
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 24 of 47
Installation contd
(7) Curved and Raked Ceiling Curved or raked ceilings are to be provided wherever required by an architect or project designer for decorative purpose to suit site/project specification.
Bracing
2 Screws in shear
NOTE: Refer to plasterboard specification for spacing of furring channel to suit radius Peer C21 suspension rod
Radius
Peer top cross rail Plasterboard Peer furring channel Screw through TCR and C39 clip Caulk all perimeter joins with cornice adhesive Peer C39 clip Appropriate Screw
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 25 of 47
Installation contd
Framing member
Angle cleat
Continuous angle 0.75 BMT galv MS 50mm min leg length Peer furring channel
Appropriate Screw
600mm max
Framing member
Angle cleat
Peer C47-74 clip Appropriate Screws in shear Peer C21 suspension rod
Continuous angle 0.75 BMT galv MS 50mm min leg length Peer C60 clip
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 26 of 47
Installation contd
Curved Ceiling Install curved TCR25 top cross rail as per ceiling framing plan and in accordance with the above ceiling installation details and appropriate bracing with brace.
Install FC28 furring channels at a spacing to suit the radius of the curved ceiling with Peer furring channel to top cross rail C39 (locking key) clips Secure the C39 to the TCR with a screw fastener to prevent slipping. Refer to plasterboard specification of curved ceiling for spacing of furring channels. Raked Ceiling Install TCR38 top cross rail in raking position as per ceiling framing plan and in accordance with the above ceiling installation details and appropriate bracing. Install FC28 furring channels at spacing to suit ceiling lining thickness with Peer furring channel to top cross rail C39 (locking key) securing the C39 to the TCR with a screw fastener. Refer to plasterboard specification for spacing of furring channels.
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 27 of 47
Installation contd
Plasterboard
Other Building Board Installation: All building board installation should be in accordance with the manufacturers specification and recommended installation methods. Expansion and Control Joints: Expansion joints as well as control joints must coincide with those structural control joints provided in the main structure. Control joints shall be provided in long continuous ceiling at 12 metres maximum spacing. Refer to Figs 25, 26 and 27 for control joint at perimeter, parallel to furring channel and perpendicular to furring channel. Storage and Site Handling: Where possible all material used in the construction of steel ceiling framing should be handled in a manner that reduces the risk of damage. All material should be kept in a dry area so accidental damage cannot occur.
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 28 of 47
6mm Gap
Plasterboard
Peer PXJ30 plasterboard expansion joint (runs parallel to the Furring Channel)
15mm max
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 29 of 47
Design Notes
Span tables are prepared for the use of top cross rails, furring channels, top hats and ceiling battens that are manufactured by Peer Industries Pty Ltd. Tables are based on permissible stress loading calculated as per AS1538 - 1988 Cold Formed Steel Structures Code AS2785 - 1985 Suspended Ceilings Design and Installation Deflection = As specified under tables Yield stress = 300 Mpa Section properties are based on the full section, using the nominal section dimensions notations which are in accordance with AS 1538. Refer to the sectional properties tables for full details of all products All information contained in this brochure is intended as a general guide only for use in ceiling framing construction. For use in any other design and construction or for any special structure, please contact Peer Design by email [email protected] Call one of our customer service centres on 1300 725 675 or visit our web site www.peerindustries.com.au Almost all structures will deflect during service. Ceiling designers should be aware of the expected deflections of the building structures as they affect the ceiling. These deflections may be due to both dead and live loadings. In fire rated ceiling framing, thermal expansion of steel frames should be expected during fire service. Designer should make due allowances for these effects. The ceiling designer should properly consider framing design and layout around openings in ceiling systems. Ceiling spans are determined by various design criteria including: weight of ceiling, wind loading, deflection limits, material size and required spacings. For span information to satisfy specific design criteria contact Peer Design. Some examples detailing various component scenarios have been provided to assist in the choice of the correct product for most building projects.
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 30 of 47
CEILING JOIST - Single Span Wall Studs Lipped Internal Pressure 0.25 kPa
Stud Size mm
Maximum Span in mm
13mmPlaster board (0.12 kN/M2) Stud Spacing in mm
600 450 300
0.50 64 0.75 1.15 0.55 76 0.75 1.15 0.55 92 0.75 1.15 150 0.75 1.15 Based on: Deflection = S/360.
2080 2430 2795 2385 2785 3165 2870 3215 3655 4395 4860
2280 2670 3060 2710 3055 3460 3145 3520 3900 4695 5180
2595 3035 3465 3080 3470 3825 3575 3890 4270 5135 5645
2025 2370 2720 2335 2710 3085 2790 3130 3575 4310 4765
2220 2600 2980 2635 2970 3370 3065 3430 3830 4605 5085
2525 2960 3380 3000 3380 3755 3485 3815 4190 5045 5550
1975 2310 2655 2290 2640 3010 2720 3050 3515 4230 4685
2165 2535 2910 2575 2895 3290 2985 3345 3760 4525 5000
2465 2885 3300 2925 3295 3690 3400 3745 4120 4955 5460
Spans are as per AS1538 & AS2785. Bridging: 0 - 2500mm span = No Bridging. 2500 - 4000mm span = One row of Bridging. 4000 - 6000mm span = Two rows of Bridging.
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 31 of 47
Lateral Pressure
MAXIMUM TOP HAT SPAN mm Single Span Double Spans Continuous Spans
Permissible kPa
0.75 1.00 1.50 2.00 2.50 3.00 4.00 5.00 6.00 Based on: Deflection = span/360. Critical of Strength & deflection
As per AS1538 and AS4600 - Cold Formed Steel Structures Code. Permissible stress design and ultimate loads.
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 32 of 47
Lateral Pressure
MAXIMUM TOP HAT SPAN mm Single Span Double Spans Continuous Spans
Permissible kPa
0.75 1.00 1.50 2.00 2.50 3.00 4.00 5.00 6.00 Based on: Deflection = span/360. Critical of Strength & deflection.
As per AS1538 and AS4600 - Cold Formed Steel Structures Code. Permissible stress design and ultimate loads.
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 33 of 47
Location on Wall Wind Classification N1 N2 N3 N4 N5 C1 C2 C3 C4 Location on Wall Wind Classification N1 N2 N3 N4 N5 C1 C2 C3 C4 Location on Wall Wind Zone LOW MEDIUM HIGH VERY HIGH Location on Wall Wind Zone LOW MEDIUM HIGH VERY HIGH
Edge Zone
450MM Spacing 600mm Spacing
Edge Zone
450MM Spacing 600mm Spacing
Edge Zone
450MM Spacing 600mm Spacing
Edge Zone
450MM Spacing 2100 1850 1550 1350 600mm Spacing 1850 1600 1350 1150
Notes 1. Material is 0.75 BMT and G300 2. Double span installation assumes that the 2 spans are approximately equal 3. If spans differ by more than 25% the use the single span table
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 34 of 47
Plasterboard
1050 1000
1150 1100
AS 3623, Serviceability = Span/600 for G only. AS 1170.2 2002, Serviceability = Span/200 for G + Ws. AS 3623, Ultimate Strength for 1.25G. AS1170.2-2002, Ultimate Strength for 1.2G + Wu. Wind Loads as per AS 4055. G550 and t = 0.38mm. As per AS 4600 - Cold Formed Steel Structures Code.
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 35 of 47
Tables provide the maximum allowable ceiling weight in kg/sqm , supported by Peer framing. Ultimate wind pressure on ceiling = 0.29 kPa. Serviceability wind pressure on ceiling = 0.12 kPa. Figures in italics indicate strength is critical elsewhere, deflection is critical.
Tables provide the maximum allowable ceiling weight in kg/sqm , supported by Peer framing. Ultimate wind pressure on ceiling = 0.45 kPa. Serviceability wind pressure on ceiling = 0.18 kPa. Figures in italics indicate strength is critical elsewhere, deflection is critical.
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 36 of 47
Tables provide the maximum allowable ceiling weight in kg/sqm , supported by Peer framing. Ultimate wind pressure on ceiling = 0.67 kPa. Serviceability wind pressure on ceiling = 0.27 kPa. Figures in italics indicate strength is critical elsewhere, deflection is critical.
Tables provide the maximum allowable ceiling weight in kg/sqm , supported by Peer framing. Ultimate wind pressure on ceiling = 0.98 kPa. Serviceability wind pressure on ceiling = 0.40 kPa. Figures in italics indicate strength is critical elsewhere, deflection is critical.
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 37 of 47
Tables provide the maximum allowable ceiling weight in kg/sqm , supported by Peer framing. Ultimate wind pressure on ceiling = 1.45 kPa. Serviceability wind pressure on ceiling = 0.59 kPa. Figures in italics indicate strength is critical elsewhere, deflection is critical.
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 38 of 47
Furring Channel Cyclonic Batten FCCB (0.38 BMT G550) Tables allow for maximum ceiling board load on ceiling battens
450 40
29
Based on: Weight of board in kg/sqm Ultimate wind pressure Wu = 0.29 kPa Serviceability wind pressure Ws = 0.12 kPa Deflection criteria- G = S/600 & G + Ws = S/200 As per AS4600, AS 2785, AS1170 & AS3623
24
40
---
12.5
Based on: Weight of board in kg/sqm Ultimate wind pressure Wu = 0.45 kPa Serviceability wind pressure Ws = 0.18 kPa Deflection criteria- G = S/600 & G + Ws = S/200 As per AS4600, AS 2785, AS1170 & AS3623
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 39 of 47
Part number C001 C001-DCS C001-SUS C26-80 C26-180 C37-7H C37-M6 C39 C42 C47-74 C74 C52 C54 C60 C60DF C60LDF C61S Constrained C61S Not Constrained C79S C85 C409 CDB26-80 CDB26-150 CBET.FIX First tooth CBET.FIX Last tooth CFCAM First tooth CFCRESAM First tooth CFCRESAM Last tooth CFCSAM CTCR-100 CTCRRES-100 Last tooth C24 Suspended C24 Hard bolted C66 C001
Limit Sate design capacity In kN 1.45 3.13 0.94 0.85 0.85 1.20 1.17 0.94 1.02 1.75 0.93 0.90 1.68 1.64 1.64 1.64 1.13 0.81 0.95 0.53 1.20 0.57 0.57 0.29 0.67 0.57 0.52 0.62 1.59 1.13 1.32 1.31 1.34 1.40 1.25
NOTE:
Limit state capacity less than 0.50 kN or Working load less than 25 kgs do not use that clip at that particular location.
(Refer to Shaded area CBET-FIX do not use the first tooth of the clip to support furring channel)
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 40 of 47
Peer Part No
Thickness t mm BMT
Shear Centre YS mm
Centroid
Area
Second Moment of Area IX-X x 103 mm4 1.154 IY-Y x 103 mm4 5.63
Radius of Gyration Rx mm Ry mm
XC mm
YC mm
A mm2
FCDB16
0.38
8.26
17.485
5.52
28.64
107
326
6.35
14.02
Section properties calculated in accordance with AS 1538 and AS 4600 - Cold Formed Steel Structures Code. Material Specification: Peer sections are roll formed from zinc coated steel strip which conforms to AS 1397. Zincalume G550 AZ150, Yield Strength - Fy = 550 Mpa & Coating Grade AZ150 g/m2 zinc/alum.
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 41 of 47
Peer Part No
Depth
Width
Thickness
Shear Centre
Centroid
Yield Strength
Area
D mm FCCB22 21.0
B mm 30
t mm BMT 0.38
YS mm 6.75
XC mm 33. 0
YC mm 10. 66
FY MPa 550
A mm2 49.9
x mm 59.6
Peer Part No
Torsion Constant
Section Modulus
Radius of Gyration
Form Factor
Warping Constant
Rx mm 8.51
Ry mm 20.1
0.892
Section Properties calculated in accordance with AS 1538 and AS 4600 - Cold Formed Steel Structures Code. Material Specifications: Peer sections are roll formed from zinc coated steel strip which conforms to AS 1397. Zincalume G550 AZ150, Yield Strength - Fy = 550 Mpa & Coating Grade AZ150 g/m2 zinc/alum.
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 42 of 47
SECTIONAL PROPERTIES TABLE SP-03 Furring Channel FC18 and FC28mm Section Properties
Peer Part No
Dept h
Width
Thickness
Shear Centre
Centroid
Yield Strength
Area
Second Moment of Area IX-X x 103 mm4 2.41 7.01 IY-Y x 103 mm4 14.77 18.29
D mm FC18 FC28 18 28
B mm 38 38
YS mm 6.32 10.7
XC mm 25.7 25.7
YC mm 8.73 13.6
Peer Part No
Torsion Constant
Section Modulus
Radius Of Gyration
Form Factor
Warping Constant
J mm4
FC18 FC28
X mm 43 53
Rx mm 6.94 10.8
Ry mm 17.2 17.5
Q 0.877 0.842
4.2 5.0
Section Properties calculated in accordance with AS 1538 and AS 4600 - Cold Formed Steel Structures Code. Material Specifications: Peer sections are roll formed from zinc coated steel strip which conforms to AS 1397. Zincalume G550 AZ150, Yield Strength - Fy = 550 Mpa & Coating Grade AZ150 g/m2 zinc/alum.
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 43 of 47
SECTIONAL PROPERTIES TABLE SP-04 Top Cross Rail TCR25 and TCR38mm Section Properties
Peer Part No
Depth
Width
Thickness
Shear Centre
Centroid
Yield Strength
Area
D mm
B mm
YS mm
XC mm
YC mm
FY MPa
A mm2
TCR25 TCR38
Peer Part No
25.4 38.3
Torsion Constant
22.83 22.83
14.4 21.8
11.415 11.415
11.9 18.35
300 300
67.5 87
Form Factor
Section Modulus
Radius of Gyration
Rx mm 8.92 13.37
Ry mm 7.61 7.35
Q 1.0 1.0
Section Properties calculated in accordance with AS 1538 and AS 4600 - Cold Formed Steel Structures Code Material Specifications: Peer sections are roll formed from zinc coated steel strip which conforms to AS 1397. Material: G2 Z275, Yield Strength - Fy = 300 Mpa and coating grade Z275 (275 g / m2 zinc).
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 44 of 47
SECTIONAL PROPERTIES TABLE SP-05 TH75-115, TH50-115 Top Hats - Section Properties
Peer Part No
Depth
Width
Thick -ness
Shear Centre
Centroid
Yield Strength
Area
Second Moment of Area IX-X x 103 mm4 40.8 34.6 IY-Y x 103 mm4 236.8 107.7
D mm TH75-115 TH50-115 35 35
B mm 75 50
YS mm 14.9 13.3
XC mm 56.4 43.9
YB mm 20.8 18.6
YT mm 14.2 16.4
Peer Part No
Torsion Constant
Section Modulus
Radius of Gyration
Form Factor
Warping Constant
Rx mm 14.2
Ry mm 34.1
0.884
TH50-115
77.0
86.2
2112
1859
2455
14.1
24.5
0.946
9.59
Section Properties calculated in accordance with AS 1538 and AS 4600 - Cold Formed Steel Structures Code Material Specifications: Peer sections are roll formed from zinc coated steel strip which conforms to AS 1397. Material: G2 Z275, Yield Strength - Fy = 300 Mpa and coating grade Z275 (275 g / m2 zinc).
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 45 of 47
Notes
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 46 of 47
Notes
Peer Industries PIF-MSC-011 Rev 06 28/07/09 Concealed ceiling systems technical manual
Page CCS 47 of 47