API - 510 - 5 Days Preparation Course For Certification
API - 510 - 5 Days Preparation Course For Certification
API 510
5 5 Days Days preparation preparation course course for for certification certification
Sculpt Your Skills for the Inspection, Repair, Alteration, and Rerating of Pressure Vessel Systems!
19th - 23rd May 2014 | Kuala Lumpur, Malaysia 01st - 05th September 2014 | Bandung, Indonesia
INSTRUCTOR
Detailed explanations of all the information covered in the API 510 'Body of Knowledge' including ASME welding requirements for pressure vessels section IX and VIII ASME non-destructive testing principles and application of Section V Pressure vessel design review ASME Section VIII, weld sizes, vessel nozzle reinforcement, brittle fracture, weld efficiency factors, post weld heat treatment Pressure relieving devices, valves, bursting discs, setting, testing and inspection; API 510 inspection, repair and rerating of vessels, inspection intervals, inspection requirements, relationships to ASME codes. Corrosion, minimum thickness determination and remaining life calculations Inspection and degradation mechanisms of pressure vessels, corrosion and cracking mechanisms Erosion, common corrodents, hydrogen and H2S damage, alloy degradation.
SUPPORTED BY
PROGRAM OVERVIEW
To improve management control of process unit inspection, repair, alteration and rerating; and to reduce the potential for inspection delays resulting from regulatory requirements. -- API.org on API 570 Certification
(API) Code 510 Inspection, Repair, Alteration, and Rerating of Pressure Vessel Systems is recognized and used with confidence worldwide. The Piping Inspector Certification Program (PICP) is developed for the continual high level of efficiency and safety through emphasizing professional credibility and process integrity. Pressure Vessel system is one of the critical production assets in process industry. Organizations recognize the need to maintain authorized inspection agency and technically assess qualified pressure vessel engineers and inspectors to ensure facilities are at top performance. Therefore, API 510 certification is one of the most sought after professional competency that enables inspectors to be actively involved in the improvement of industry & environmental health and safety performance, reinforcement management control, compliance of inspection capabilities. With Mr. Uday Kales extensive involvements in the facilities inspection, as well as his practical coaching and mentoring approaches, this course not only prepare the candidates to pass API 510 examination with confident, it will also advance the appreciation of pressure vessel facilities and thus to broaden the technical knowledge base in order to avoid unplanned shutdown and reduce expenses!
IN-HOUSE SOLUTIONS
SAVE COST IMPROVE PERFORMANCE REDUCE RISK
PetroSync understands that in current economic climate, getting an excellent return on your training investment is critical for all our clients. This excellent training can be conducted exclusively for your organization. The training can be tailored to meet your specific needs at your preferred location and time. We will meet you anywhere around the globe. If you like to know more about this excellent program, please contact on +65 6415 4500 or email [email protected]
PROGRAM SCHEDULE
AUDIENCE
This course will specifically benefit Engineers, Supervisors, and Managers from the following disciplines: - Mechanical Engineering - Inspection - Maintenance & Operations - Technical & Engineering - QAQC and technical personnel with 2-3 years of experience in the management and planning of inspection and maintenance activities of pressure vessel system at upstream oil & gas facilities, refineries, process plants and petrochemical facilities.
08:00 Registration (Day1) 08:10 11:00 Session I 11:00 11:15 Refreshment & Networking 11:15 13:00 Session II 13:00 14:00 Networking Buffet Lunch 14:00 15:30 Session III 15:30 15:45 Refreshment & Networking 15:45 18:00 Session IV 18:00 End of Day
AGENDA OULTINE
MODULE - 2
DAY-1
MODULE 1
Welcome and Introduction Overview of API 510 Course
WELD SIZE FOR ATTACHMENT WELDS AT OPENINGS a) Conversion of a fillet weld throat dimension to leg dimension , conversion factor(0.707) b) Determine the required size of welds at openings (UW-16).
MODULE 3
NOZZLE REINFORCEMENT Key concepts of reinforcement, such as replacement of strength and limits of reinforcement. Credit for extra metal in shell and nozzle Calculate the required areas for reinforcement
MODULE 2
JOINT EFFICIENCIES a. Weld Joint Categories from UW-3; b. Type of radiography (full, spot, or none , RT-1, RT-2, etc.); c. Joint efficiency by reading Table UW-12; d. Joint efficiency for seamless heads and vessels Sections per UW-12 (d); and e. Joint efficiency for welded pipe and tubing per UW-12 (e).
MODULE - 4
1 SCOPE OF API 510 1.1 General Application 1.2 Specific Applications 1.3 Recognized Technical Concepts 2 references
MODULE - 3
THICKNESS CALCULATIONS a) The required thickness of a cylindrical shell (UG-27(c)(1)); b) The vessel part MAWP for a cylindrical shell c) The required thickness of a head-Hemispherical, Ellipsoidal, Torispherical d) The vessel part MAWP for a head
MODULE - 5
3 definitions 4 owner/user inspection organization p g 4.1 General 4.2 Owner/user Organization Responsibilities Resp
MODULE - 4
STATIC HEAD a) Calculate static head pressure on any vessel part; b) Calculate total pressure (MAWP + static head) on any vessel part; c) Calculate maximum vessel MAWP given vessel parts MAWP and elevations
DAY-3
MODULE - 1
5 inspection, examination and pressure testing practices 5.1 Inspection Plans 5.2 Risk-based Inspection 5.3 Preparation For Inspection 5.4 Inspection For Types Of Damage Modes Of Deterioration And Failure
MODULE -5
EXTERNAL PRESSURE a) Calculate the maximum allowable external pressure; b) Calculate whether a cylindrical shell meets Code design for external pressure. IMPACT TESTING a) Determine the minimum metal me temperature of a material which is exempt from impact i testing (UG-20 (f), UCS-66,UCS-68(c).)
MODULE 2
5.5 General Types Of Inspection And Surveillance 5.6 Condition Monitoring Locations 5.7 Condition Monitoring Methods
DAY-2
MODULE - 1
PRESSURE TESTING a) Calculate a test pressure compensating for temperature. (UG-99 & UG-100) b) The precautions associated with hydrostatic and pneumatic testing, c) Steps in a hydrotest Procedure (UG 99 and UG 100) d) All steps in a pneumatic test procedure (UG 100 and UG 102)
MODULE - 3
5.8 Pressure Testing 5.9 Material Verification And Traceability 5.10 Inspection Of In-service Welds And Joints 5.11 Inspection Of Flanged Joints
MODULE - 4
6 interval/frequency and extent of inspection 6.1 General
6.2 Inspection During Installation And Service Changes 6.3 Risk-based Inspection 6.4 External Inspection 6.5 Internal And On-stream Inspection 6.6 Pressure-relieving Devices
DAY-5
MODULE - 1
API RP 576, Inspection of Pressure-Relieving Devices 1. Relief Devices a) Description of Types -- (API RP-576, Section 2) b) Causes of Improper Performance (API RP-576, Section 4) c) Reasons for Inspection and Frequency Determination (API RP 576, Sections 3 & 5) d) Inspection and Test Service Procedures (API RP-576, Sections 6 and 7)
MODULE - 5
7 inspection data evaluation, analysis, and recording 7.1 Corrosion Rate Determination 7.2 Remaining Life Calculations 7.3 Maximum Allowable Working Pressure Determination
MODULE - 6
7.4 Fitness For Service Analysis Of Corroded Regions 7.5 API RP 579 Fitness For Service Evaluations 7.6 Required Thickness Determination 7.7 Evaluation Of Existing Equipment With Minimal Documentation 7.8 Reports And Records
MODULE - 2
A. Article 1, General Requirements: B. Article 2, Radiographic Examination
MODULE - 3
C. Article 6, Liquid Penetrant Examination, D. Article 7, Magnetic Particle Examination (Yoke and Prod techniques only): E. Article 23, Ultrasonic Standards, Section SE797
DAY-4
MODULE - 4
API RP 576, Inspection of Pressure-Relieving Devices
MODULE - 1
8 repairs, alterations, and rerating of pressure vessels . 8.1 Repairs And Alterations Authorization Approval Materials Requirements Welding Requirements
1. Relief Devices a) Description of Types -- (API RP-576, Section 2) b) Causes of Improper Performance (API RP-576, Section 4) c) Reasons for Inspection and Frequency Determination (API RP 576, Sections 3 & 5) d) Inspection and Test Service Procedures (API RP-576, Sections 6 and 7)
MODULE - 2
Heat Treating Requirements Preheating Post weld Heat Treating Local Postweld Heat treatment Repairs to Stainless Steel Weld Overlay and Cladding Rerating
MODULE - 3
Introduction to ASME Sec. IX Welding Procedure tests Performance qualification tests Acceptance criteria Welding positions P-No, F-No and A-No. Review of: a. Welding Procedure Specification (WPS); and b. Procedure Qualification Record (PQR) And determine: a) Whether number and type of mechanical test listed on PQR are appropriate b) Whether the results of the tests are acceptable c) Whether all required essential and non-essential variables have been properly addressed.
INSTRUCTOR
Rosen Europe (The Netherlands) Banagas (Bahrain) TATA (India) Al Jubail Fertilizer Company Technip (Bahrain) Equate Petrochemicals (Kuwait) TUV Akadamie Middle East (UAE, Saudi Arabia and Qatar) Inspection and Test Nigeria Ltd Dacon Inspection Ltd HBJ pipeline up-gradation projects
With his extensive involvement in various projects, Mr. Uday is also an enthusiastic and knowledgeable mentor, who has been a faculty in training, examination, qualification and certification of API 510 & 570, ASME B31.3, API653, welding and NDT in the Middle East, Africa and Asia. He is a charted engineer with a Masters in Mechanical Engineering.
INVESTMENT PACKAGES
Please checklist the package that you are attending!
API 510 Pressure Vessel Package 19th - 23rd May 2014 Kuala Lumpur, Malaysia 01st - 05th September 2014 Bandung, Indonesia Early Bird Standard Price
PROGRAMME CONSULTANT
Contact Email Phone Fax : Cay Aagen : [email protected] : +65 6415 4500 : +65 6826 4322
Group Discount
3 or more at 10% disc from Standard Price and the same organization at the same time
* To enjoy the offer, full payment must be made before the deadline. * For 5 or more delegates, please inquire for more attractive package. * Prices include lunches, refreshments and training materials. Discounts cannot be combined with other promotional offers. * Important: Please note that registration without payment will incur a SGD 200 administration fee.
DELEGATE DETAILS
1st Delegate Name
Mr Email: Department:
Mrs
Ms
Dr
Others
DATA PROTECTION
The information you provide will be safeguarded by PetroSync that may be used to keep you informed of relevant products and services. As an international group we
Mr Email: Department:
Mrs
Ms
Dr
Others
may transfer your data on a global basis for the purpose indicated above. If you do not want us to share your information with other reputable companies, please tick this box.
Mr Email: Department:
Mrs
Ms
Dr
Others
CANCELLATION POLICY
You may substitute delegates at any time as long as reasonable advance notice is given to PetroSync. For any cancellation received in writing not less than fourteen (14)
INVOICE DETAILS
Attention Invoice to: ______________________________________________________________________________ Direct Line Number: ______________________________ Fax: _____________________________________________ Company:____________________________________________ Industry : __________________________________ Address: _______________________________________________________Postcode: _________________________ Country: ________________________Email: __________________________________________________________
Please note: - Indicate if you have already registered by Phone Fax Email Web - If you have not received an acknowledgement before the training, please call us to confirm your booking.
working days prior to the training course, you will receive a credit voucher worth total transaction with less a SGD 200 administration fee and any related bank or credit card charges. Delegates who cancel less than fourteen (14) working days of the training course, or who do not attend the course, are liable to pay the full course fee and no refunds will be granted.
PAYMENT METHODS
By Credit Card : Please debit my credit card: Card Number: Visa MasterCard AMEX Security Code: Expiry Date:
CERTIFICATE OF ATTENDANCE
70% attendance is required for PetroSync's Certificate of Attendance.
Name printed on card: _____________________________________________________________________ By Direct Transfer : Please quote invoice number(s) on remittance advice PetroSync LLP Bank details: Account Name: PetroSync LLP Bank Number: 7144 Branch Code: 013 Account No: 13-1-005531-6 Name of Correspondent Bank : Standard Chartered Bank, 6 Battery Road, Singapore 049909 SWIFT Code of Correspondent Bank: SCBLSGSGXXX All bank charges to be borne by payer. Please ensure that PetroSync LLP receives the full invoiced amount.
VENUE
All of our training courses are held in 4-5 star venues. The training venues are carefully selected by their location, training and their refreshment facilities. You will only learn in comfortable and convenient environments. Hotel accommodation and travel cost are not included in the registration fees. A special event hotel room rate will be arranged with the hotel and a hotel room reservation form will be provided upon confirmation of your attendance.
Conrma on
I agree to PetroSyncs payment terms and cancellation policy.
Signature :
PAYMENT TERMS
____________________________________________________________________________
: Payment is due in full at the time of registration. Full payment is mandatory for event attendance.
Incorrect Details Please accept our apologies for mail or email that is incorrectly addressed. Please email us at [email protected] and inform us of any incorrect details. We will amend them accordingly.
To Register