Emergency:: DT Inlet: We Still Need To Tie A Couple of Steps of The Wing Wall Back To The Rock

1. Concrete pouring was completed for various structures along the river including the DT outlet. Rock bolting and anchoring activities were also finished. 2. Work is still needed to tie steps of the wing wall to the rock at the DT inlet. Drift anchor #2 needs to be completed urgently. Excavation and concreting works are ongoing. 3. A climber crane is being shifted to the dam site for erection works. Formwork and wall construction is underway at various locations along with reinforcement works. Desilting of basins by grouting is in progress.

Uploaded by

sivaguruk2
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views

Emergency:: DT Inlet: We Still Need To Tie A Couple of Steps of The Wing Wall Back To The Rock

1. Concrete pouring was completed for various structures along the river including the DT outlet. Rock bolting and anchoring activities were also finished. 2. Work is still needed to tie steps of the wing wall to the rock at the DT inlet. Drift anchor #2 needs to be completed urgently. Excavation and concreting works are ongoing. 3. A climber crane is being shifted to the dam site for erection works. Formwork and wall construction is underway at various locations along with reinforcement works. Desilting of basins by grouting is in progress.

Uploaded by

sivaguruk2
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

Emergency:

1.

DT outlet concrete cladding along river:


Total 27.08.10 In m concrete qty Remarks In m No ork !rom "ns"de Total% 7 anc&ors' () *a$s $rout"n$. due to #antry 60 1+ Rock *olt. Rock *olt act","t"es are concret"n$ completed. 27.08.10 In Nos. -

Concrete poured On up to 26.08.10 In m 60

2. DT Outlet anchors from inside the tunnel.


up to 26.08.10 In Nos. ) nos. No update. On Total Nos. ) Remarks

3. DT Inlet: We still need to tie a couple of steps of the wing wall ac! to the roc!. ". Drift anchor #o.2 at $%&': to e completed and concreted on topmost priority.
./ca,at"on R0 on 26.08.10 "n m 2(.+ ./ca,at"on R0 on 26.08.10 "n m 26.0 ./ca,at"on R0 on 26.08.10 "n m 4.0 1ull on 27.08.10 "n m Total "n Remarks m 2(.+ Total concrete 2ty3(04 m

%. Drift anchor #o. $ from access tunnel:


1ull on 27.08.10 "n m Total "n Remarks m 26.0 Re"n!orcement In pro$ress. Total "n m 4.0

(. Drift anchor #o. 3 from access tunnel:


1ull on 27.08.10 "n m Remarks

). *ower inta!e plugging:


Concrete poured On 27.08.10 Total qty In up to 26.08.10 In m In m m 7(8 7(8 ./ca,at"on R0 on 26.08.10 "n m (.0 Remarks

+. ,lima! raise clim er to e shifted to dam site and erection wor!s is under progress.
1ull on 27.08.10 "n m Total "n Remarks m (.0 5l"mak erect"on "n pro$ress

&. -la and wall at $%&' on the right an! . lowering of ench at $%").
6ocat"on Completed up to 26.08.10 7all 8R0% 94 to -)1 : on 27.08.10 "n m Total "n m 78 Cladd"n$ Remarks all

<la*

.6%1+40-1+41.8; 8R0%-)1 to -+2 : .6%1+40-1+41.8; R0% 97 to 91+

re"n!orcement !"/"n$ "n pro$ress 20.( Re"n!orcement "n pro$ress

/owering of ench at E/ $%"): On 27.08.10.at .6% 1+)6. 4m Shotcrete sprayed.

0ost urgent wor!s:


$. Desilting asin grouting.
Completed up 6ocat"o Total to 826.08.10; n len$t& "n m "n m (209 trans"t"on 0C-01 +0m8)0mu: s'10m d:s; 187 On 27.08.10 "n m Total "n m =alance "n m Remarks

187

18(

2. 12O road side crusher daily production and last on the road:
BRO road side crusher is being run. However blasts are being ta en on the road and boulders are being collected by !"#$ % #n&ra personnel.

3. -urge shaft: EOT erection and atching plant commissioning.


"rilling and blasting have been done. 'uc ing has been done. Road side wall rein&orcement &i(ing wor s is in progress. )ower House side wall shuttering wor is in progress. Batching plant bin shuttering wor is in progress.

". *ower 3ouse: EOT erection and commissioning.


Rail erection has been completed at *HS and rail erection is under progress at RHS. 30 wor!shop readiness to roll ferrules. Sheet &i(ing in ceiling is in progress. 4nit ( and % hando5er. +nit , pit handed over to 'r. B" -umar &or .arth 'at placement. .arth mat placement completed and mud mat concrete completed as per 'r. Saha.

%. 6ham er 2 at ,DIT %.
.rection o& Head /ear is ongoing. $he headgear has risen &rom .* 1014.11 to .* 1010.11.

(. ,*-1
No wor due to massive landslide occurred on 223143115 due to these "./ and ventilation &ans are collapsed. Slide muc engaged in &ront o& 6!$ portal and not yet cleared.

). *enstoc! hori7ontal shaft at power house for 4( and 4%


)enstoc &or +, 7 +0 e(cavation completed. )enstoc &or +4 e(cavation also completed.

+. 2i erection in T2T ( and e8ca5ation of T2T % into the power house

$R$ 0 will be used &or muc ing o& &urther )ower House e(cavation as per 'r. Saha.

&. 6ut off wall e9uipment mo5ement.


$ransporter still not provides the trailer &or loading.