Management Information System
Management Information System
IMPLEMENTATION OF MIS
The choice of the system or the sub-system depends on its position in the total MIS plan, the size of the system,
the user understands of the system and the complexity and its interface with other systems. The designer first
develops systems independently and starts integrating them with other systems, enlarging the system scope
and meeting the varying information needs.
Determining the position of the system in the MIS is easy. The real problem in the degree of structure, and
formalization in the system and procedures which determine the timing and duration of development of the
system. Higher the degree of structured ness and formalization, greater is the stabilization of the rules, the
procedures, decision making and the understanding of the overall business activity. Here, it is observed that the
user’s and the designer interaction are smooth, and each other’s need are clearly understood and respected
mutually. The development becomes a methodical approach with certainty in input-process and outputs.
MIS is generally used by medium and larger scale organizations. However, small organizations are yet to
understand its application. There is dire need to build up computer culture by properly disseminating information
about computer applications and its benefits.
Implementation of MIS can be achieved by using any of the methods such as direct, parallel, modular or phase
in.
• Direct Approach
Direct installation of the new system with immediate discontinuance of the old existing system is reffered as
“cold turnkey” approach. This approach becomes useful when these factors are considered.
• Parallel Approach
The selected new system is installed and operated with current system. This method is expensive because of
duplicating facilities and personal to maintain both the systems. In this approach a target date must be fixed
when the operations of old system cease and new one will operate on its own.
• Modular Approach
This is generally recognized as “Pilot approach”, means the implementation of a system in the Organization on
a piece-meal basis.
• Phase-in-Implementation
This approach is similar to modular method but it differs because of segmentation of system, however, not the
organization. It has advantages that the rate of changes in a given Organization can be totally minimized and
the data processing resource can be acquired gradually over a period of time. System exhibits certain
disadvantages such as limited applicability, more costs incurred to develop interface with old system and a
feeling in the Organization that system is never completed.
Implementation Procedures
After designing the MIS it is essential that the organization should plan carefully for implementation. The
planning stage should invariably include the following:
Planning the implementation activities, acquisition of facilities, procedures development, generating files and
forms, testing the system and evaluating and maintenance of the system.
3. Establishing of MIS
For monitoring the progress of implementation and for proper control of activities, efficient information system
should be developed.
4. Acquisition of Facilities
For installation of new system or to replace current system the manager should prepare a proposal for approval
from the management by considering space requirement movement of personal and location for utility outlets
and controls.
5. Procedure Development
This is an important stop for implementation of the system including various activities such as evaluation
selection of hardware, purchase or development of software, testing and implementation strategies.
The MIS manager should generate files and formats for storing actual date. This requires checklist data, format
date storage forms and other remarks in database.
The performance should e evaluated in order to find out cost effectiveness and efficacy of the system with
minimum errors due to designs environmental changes or services.
Software Maintenances
The proper maintenance is the enigma of the system development and it holds software industry captive lying
up programming resources. There are some problems in maintenance such as regarding it as non rewarding
non availability of technicians and tools no cognizance of users about maintenance problem and cost lack of
standard procedures and guidelines. Most programmers feel maintenance as low level drudgery. If proper
attentions is paid over a period of time eventually less maintenance is required.
Types of Maintenance
The maintenance of system are classified into corrective/adaptive/perfective. Corrective maintenance means
repairing process or performance failures. Adaptive maintenance means changing the programming function
whereas perfective maintenance deals with enhancing the performance or modifying the program.
Documentation is major part of maintenance in system development. Maintenance staff receives requests from
the authorized user. Programming library should be maintained.
Several organizations having MIS generally go in for reducing maintenance costs and it consists of three major
phases.
Evaluation Methods
Evaluation of the MIS in an organization is integral part of the control processes. There are several evaluation
approaches such as quality assurance review compliance of audits budget performance review computer
personal productivity assessment computer performance evaluation service level monitoring user audit survey
post installation review and cost benefit analysis.
Evaluation performance measurement can be classified into two classes as effectiveness and efficiency. The
relationship between effectiveness and efficiency is that the format is a measure of goodness of out put and the
latter is a measure of the resources required to achieve the output.