0% found this document useful (0 votes)
27 views8 pages

State Load Dispatch Center, Airoli: Daily System Report

The document provides daily system report data for the Maharashtra state electricity transmission system on March 5, 2014. It includes information on daily and monthly electricity generation by various sources including thermal, hydro, gas, wind and solar. It also provides details on electricity exchanges with other states and sectors. Peak demand data is given showing morning, evening and night peaks. Frequency data for the day is also summarized.

Uploaded by

Tuku Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views8 pages

State Load Dispatch Center, Airoli: Daily System Report

The document provides daily system report data for the Maharashtra state electricity transmission system on March 5, 2014. It includes information on daily and monthly electricity generation by various sources including thermal, hydro, gas, wind and solar. It also provides details on electricity exchanges with other states and sectors. Peak demand data is given showing morning, evening and night peaks. Frequency data for the day is also summarized.

Uploaded by

Tuku Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

Maharashtra State Electricity Transmission

Company Ltd.

State Load Dispatch Center,


Airoli
Daily system Report
for
05/Mar/2014

0 of 7

State Load Dispatch Center,Airoli (MSETCL)


Daily system Report for 05/Mar/2014 WEDNESDAY
GENERATION (MUs)
II
EXCHANGES (MUs)

I
A) MSGENCO

Daily

1) Thermal
2) Hydro
3) Gas
Total MSGENCO
B) 1) JSW JAIGAD
2) WPCL
3) ADANI
4) Other CPP / IPP
5) Wind Generation
6) PENCH (MS)
7) SOLAR
C) 1) TPCL Thermal
2) TPCL Hydro
TOTAL TPCL
3) REL Thermal
D) STATE
1) Thermal

Monthly

123.205
9.768
6.380
139.353
17.857
4.526
24.343
16.978
4.041
0.154
0.784
14.839
3.662
18.501
11.744

(A2+B6+C2)
2) Hydro
(A3)
3) Gas
(B5)
4) Wind
5)CPP/IPP (B1+B2+B3+B4)
(B7)
6) SOLAR

149.788
13.584
6.380
4.041
63.704
0.784

TOTAL STATE

238.281

(A1+C1+C3)

E) Central Sector

588.666
52.600
33.869
675.135
87.545
22.762
113.774
84.510
29.250
0.807
4.972

Daily

1) Gujrat
2) Madhya Pradesh
3) Chattisgarh
4) Maharashtra Net
(Incl. 765kV Solapur-Raichur)

5) Goa
6) TAPS 1&2 Injection
7) RGPPL Injection
8) Pench (Excess)

# Total Cent. Sector


F) Other Exchanges
72.556 1) With TPCL (Excess)
11.931 G) Bilateral Power *
84.487 1) MSEDCL Bilateral
57.710
Include PX

718.932
65.338
33.869
29.250
219.160
4.972
1071.521

2) MUMBAI Bilateral
Include PX
3) MUMBAI Schedule

Monthly

-2.934
18.045
6.000
80.196

-15.476
94.653
36.540
384.400

-1.008

-7.881

-6.107
7.482
0.000
-0.154

-29.087
37.505
0.000
-0.807

102.528

507.728

-21.992

-96.013

5.246
-9.303
19.517
5.504
19.517

57.644
-17.457
90.422
19.313
90.442

288.572

1430.470

34.114

154.556

18.121

83.639

340.807

1668.665

H) ENERGY CATERED (MUs)


1) MSEDCL
2) TPCL
3) REL
TOTAL STATE

DETAILS OF MAHARASHTRA STATE PEAK DEMAND(MW)


PARTICULARS
MSGENCO Thermal
MSGENCO Hydro
MSGENCO Gas
MSGENCO Total Generation
Central Sector Receipt
WIND
CPP / IPP
SOLAR
Exchange with Mumbai
MSEDCL DEMAND MET
Load Shedding
MSEDCL DEMAND
TPCL GENERATION
R-INFRA GENERATION
TPCL+R-INFRA DEMAND
STATE DEMAND MET
STATE DEMAND
Frequency (Hz)

A. Morning Peak at 12
Hrs
5601
650
271
6522
5221
96
2781
128
-1187
13561
595
14156
1041
521
2749
16310
16905
50.03

B. Evening Peak at 20
Hrs
5201
231
262
5694
4626
312
2727
0
-1184
12175
25
12200
987
518
2689
14864
14889
50.17

C. Night Minimum at 3
Hrs
4865
164
263
5292
3232
165
2456
0
-588
10557
76
10633
497
408
1493
12050
12126
50.02

FREQUENCY PARTICULARS
MAXIMUM FREQ.

MINIMUM FREQ.

50.3 Hz at 21.45 Hrs 49.68 Hz at 06.46 Hrs

AVERAGE FREQ.

FREQ. BELOW 49.2 Hz

49.99

0 % of Time(min)

* Displayed for information, not added in total. # Total Cent. Sector includes MSEDCL and TPCL bilateral power.

Shift Engineer

Shift Incharge
1 of 7

State Load Dispatch Center,Airoli (MSETCL)


Daily and Progressive Generation,Maximum,Minimum,OLC Details for 05/Mar/2014
Generating
unit

Generation
Daily
(Mus)

Monthly Max
(Mus) (MW)

Min
(MW)

OLC
(MW)

Koradi

Generating
unit
Total

Unit 5
Unit 6
Unit 7

0.00
3.10
3.36

0.00
15.54
15.91

Total

6.46

31.45

Unit 2
Unit 3
Unit 4
Unit 5

2.72
3.07
9.54
8.06

15.71
16.00
19.22
41.82

Total

23.38

92.75

Unit 3
Unit 4
Unit 5
Unit 6
Unit 7

0.00
3.36
3.28
4.62
4.58

0.00
6.88
18.14
23.86
23.64

Total

15.84

72.52

Unit 1
Unit 2
Unit 3
Unit 4
Unit 5
Unit 6
Unit 7

3.10
0.00
3.98
4.37
9.66
9.42
7.66

15.91
13.71
14.11
21.91
20.88
46.42
42.62

Total

38.19

175.57

Unit 3
Unit 4

5.20
4.91

20.51
25.08

Total

10.11

45.59

Unit 1
Unit 2
Unit 3
Unit 4
Unit 5

3.62
3.54
3.99
0.00
9.42

18.18
17.16
20.19
9.73
47.13

Total

20.57

112.40

0
135
155

0
116
120

KDPH
VTRNA
TILLARI
BHTGR/VEER
BHIRA T.R.
RNGR+BHTSA
BHANDARDRA
ELDARY
SMLHY_PTN
GHATGHAR

0.90
0.00
0.39
0.00
0.07
0.33
0.80
0.00
0.94
1.94

2.98
0.00
2.00
0.00
0.51
1.73
3.81
0.00
4.61
8.77

Total

5.37

24.42

MalharPeth
Vankuswadi
ATIT
Kale
Satara
Shirala
K Mahankal
Supa
Vita
Dondaicha
Sakri
Nandurbar
Khandke
Khaparale

0.19
0.24
0.03
0.02
1.03
0.10
0.01
0.17
0.72
0.91
0.06
0.07
0.26
0.24

1.22
2.15
0.21
0.13
8.09
0.67
0.08
0.73
4.60
7.01
0.84
0.54
1.42
1.56

250
250

Total

4.04

29.25

500
180
180
195
0
500

JSW_JAIGAD
WARDHA
Adani
Other_CPPs

17.86
4.53
24.34
16.98

87.54
22.76
113.77
84.51

Total

63.70

308.59

Total

0.78

4.97

1055

Total

0.78

4.97

Trombay 4
Trombay 5
Trombay 6
Trombay 7A
Trombay 7B
Trombay 8
TATA Hydro

0.00
10.49
0.00
2.75
1.60
0.00
3.66

0.00
50.84
0.00
13.74
7.97
0.00
11.93

Total

18.50

84.49

1&2

11.74

57.71

Total

11.74

57.71

140
140
500
366
1146

Parli

0
158
144
250
250

0
132
128
170
165

0
143
137
190
190
660

Chandrapur

135
0
180
199
450
430
346

118
0
155
163
365
335
299

140
0
170
210
400
400
350
1670

Paras

249
231

190
154

Khaparkheda

180
170
180
0
490

125
135
156
0
322

Monthly Max
(Mus) (MW)
28.18

270
0
120
355
300

Daily
(Mus)
4.40

0
130
140

Bhusawal

130
135
470
360

Generation

Nasik

Min
(MW)

OLC
(MW)
1170

Hydro

38
0
63
0
40
14
34
0
39
250

37
0
0
0
0
13
33
0
39
0

18
0
60
0
40
15
20
0
0
0
153

Wind

CPP

764
192
1213

687
183
801

691
190
1234
465
2580

SOLAR

Tata

Unit 3
Unit 4
Unit 5

0.00
4.37
4.29

15.45
21.54
21.39

Total

8.66

58.38

All Units

6.38

33.87

Total

6.38

33.87

0
200
190

0
170
168

0
190
190
380

Uran

274

261

270
270

PENCH (MS)

Pench (MS)

0.15

0.81

Total

0.15

0.81

45

2.96
0.68
0.76

14.36
8.96
4.86

Koyna 12&4 Total

3.64

23.32

345
250
160

40
0
0

0
316
0
114
66
0
0

0
500
0
120
60
0
447
1127

REL

Koyna

Stage 1-2
Stage 4
Stage 3

0
502
0
115
67
0
362

600
250
320
850

525

395

500
500

Cent_Sect

Share

5040

Total

5040

Thermal
Thml+Gas
Hydro
Total
State Total
MS
PG
CL

123.20
129.58
9.77
139.35
238.28

588.67
622.54
52.60
675.14
1071.52

5681
5951
1323
7274
16521

2 of 7

State Load Dispatch Center,Airoli (MSETCL)


Hourly Load Data As on 05/Mar/2014

TIME MSPGCL GEN.


Mum. MSEDCL LOAD MSEDCL TPCL + R
CPP /
CS
CS Mum.S
STATE FREQ.
SR.
TOTAL WIND
SOLAR
NET
DEM. SHEDDI DEM.
-INFRA
IPP
SHARE RECPT CH.
DEMAND (Hz)
NO. THM HY GAS
EXCH.
MET
NG
WITH LS DEMAND
1 4938

239

264

5441

137

2477

3252

3525

-627

-800

10780

35

10815

1696

12511

49.97

2 5065

164

264

5493

157

2618

3177

3093

-593

-551

10810

76

10886

1563

12449

50.01

3 4865

164

263

5292

165

2456

3396

3232

-565

-588

10557

76

10633

1493

12126

50.02

4 4869

164

264

5297

156

2316

3359

3422

-527

-565

10626

76

10702

1457

12159

49.98

5 4913

199

264

5376

156

2389

3372

3565

-540

-561

10925

76

11001

1453

12454

49.90

6 5026

355

264

5645

166

2626

3607

3844

-588

-701

11580

86

11666

1593

13259

49.95

7 5214

414

263

5891

197

2735

4029

4241

-542

-634

12463

127

12590

1649

14239

49.81

8 5473

424

263

6160

198

2628

15

4515

4593

-628

-560

13063

317

13380

1790

15170

49.97

9 5575

448

274

6297

129

2779

39

4593

4659

-727

-755

13191

402

13593

2130

15723

50.00

10 5650

796

274

6720

80

2569

74

4772

5091

-912

-991

13588

195

13783

2509

16292

49.98

11 5555

960

270

6785

88

2729

102

4963

5090

-1121

-1160

13638

423

14061

2720

16781

49.95

12 5601

650

271

6522

96

2781

128

5012

5221

-1168

-1187

13561

595

14156

2749

16905

50.03

13 5386

528

272

6186

104

2730

128

4887

5160

-1177

-1167

13141

740

13881

2714

16595

49.97

14 5222

752

272

6246

134

2708

141

4703

4604

-1082

-1077

12756

641

13397

2576

15973

49.96

15 5156

683

274

6113

139

2712

96

4872

4779

-1061

-1112

12727

470

13197

2585

15782

49.97

16 5191

562

263

6016

165

2755

32

4890

4819

-1063

-1126

12661

335

12996

2595

15591

49.97

17 5093

314

264

5671

162

2665

19

4915

4816

-1009

-1174

12159

73

12232

2586

14818

50.01

18 4894

196

261

5351

165

2595

10

4089

4078

-857

-1152

11047

13

11060

2541

13601

50.02

19 4899

400

262

5561

187

2714

3947

4323

-869

-1174

11611

14

11625

2500

14125

49.99

20 5201

231

262

5694

312

2727

4682

4626

-889

-1184

12175

25

12200

2689

14889

50.17

21 4961

386

263

5610

259

2621

4451

4721

-841

-986

12225

25

12250

2460

14710

49.96

22 4912

408

263

5583

184

2720

3687

3883

-739

-978

11392

25

11417

2244

13661

50.08

23 4807

168

263

5238

307

2837

3434

3504

-668

-892

10994

17

11011

2075

13086

50.04

24 4739

163

263

5165

198

2817

3606

3639

-724

-917

10902

10

10912

1870

12782

50.10

123.2
9.77 6.38 139.35
4.04 63.70
0.78 100.21 102.53 -19.52 -21.99 288.57
4.87
293.44
52.24
345.68
0
NOTE : ALL VALUES IN MW
Mumbai Sch./Net Exch is shown with reference to MSETCL System. (+) indicates Mum. to MSETCL and (-) indicates
MSETCL to Mum. Mumbai Schedule is calculated for MSETCL periphery (taking 4% loss for import & 4.85% MSETCL loss
MUs

# Without Applying Load Diversity Factor

3 of 7

49.99

State Load Dispatch Center,Airoli (MSETCL)


Details of Generating Unit Outages/Trippings for 05/Mar/2014
Position as on 6.30 Hrs of 06/Mar/2014
Name of Generating
Unit

Capacity

Tripped
Date

Trippe
Sync.Date
d Time

Sync.
Time

Expected
Date

210

13/02/2013

23.50

Continued. Water Shortage

Dabhol 1B

230

28/05/2013

22.02

Continued. Gas shortage.

Dabhol 3A

230

06/06/2013

08.28

Continued. Gas Shortage

Dabhol 2A

230

06/06/2013

09.10

Continued. Gas Shortage

Dabhol 1X

290

27/06/2013

21.46

Continued. Gas Shortage

Dabhol 1A

230

27/06/2013

21.47

Continued. Gas Shortage

Dabhol 2X

290

15/07/2013

15.09

Continued. Gas Shortage

Tata Trombay 6

500

19/07/2013

23.54

Continued. Economic shut down.

Dabhol 2B

230

08/08/2013

15.03

Continued. Gas Shortage

300

02/10/2013

00.45

Continued.

Dabhol 3X

290

29/12/2013

05.47

Continued. Gas Shortage

Dabhol 3B

230

29/12/2013

06.14

Continued. Gas Shortage

Uran Unit 8

108

03/01/2014

14.06

Continued. Gas Shortage

250

09/01/2014

22.54

Continued.

Uran Unit B0

120

29/01/2014

17.50

Continued. Gas Shortage.

Uran Unit 7

108

29/01/2014

18.05

Continued. Gas Shortage.

CPP WPCL U-1

135

30/01/2014

12.45

Continued. turbine vibration

CPP WPCL U-2

135

18/02/2014

00.02

Continued. Ash Conveying problem

Koradi Unit 5

200

23/02/2014

04.04

Continued. ID Fan Problem.

CPP JSW (J) U2

300

28/02/2014

17.52

Continued. No Schedule.

CPP Adani U-3

660

02/03/2014

04.23

Khaparkheda Unit 4

210

03/03/2014

09.32

Continued. B.T.L.

Koyna ST-IV 2

250

03/03/2014

11.50

Continued. Attend W pht/f oil leakage.

Nasik Unit 3

210

04/03/2014

18.10

Continued. Boiler Tube Leakage

Chandrapur Unit 2

210

04/03/2014

21.06

Continued. Boiler Tube Leakage

Bhusawal Unit 2

210

05/03/2014

21.57

Continued. Boiler Tube Leakage

Reason of Outage

PLANNED OUTAGE
Parli Unit 3
FORCED OUTAGE

CPP VIPL

Tata Trombay 8

05/03/2014

15.32

Turbine bearing vibration


high.

Emergency H/T,Fire at
turbine track.

Preheater T/L.

4 of 7

State Load Dispatch Center,Airoli (MSETCL)


Details of Line outages/Trippings for 05/Mar/2014
Position as on 6.30 Hrs of 06/Mar/2014

Name of Line

Tripped
Date

Tripped Synchronise Synchronise


Time
d Date
d Time

Reason of Outage

InterState
Voltage Level :

220KV

Outage Type

Borivali -Tarapur

07/12/2013

10.15

Nasik-Navsari-I

05/03/2014

09.12

Continued.
05/03/2014

17.28

PLANNED OUTAGE

MUMBAI STRENGTHENING WORK


PMM Work

Voltage Level :
400KV
Talegaon PG- Aurangabad
25/02/2014
- II
Kolhapur - Mapusa - I
04/03/2014

22.53
17.03

05/03/2014

Dhule-Sar'Sarovar - I

04/03/2014

21.42

05/03/2014

06.44

Over Voltage

Padgha-Bhoisor (PGCIL)

05/03/2014

01.08

05/03/2014

08.18

Y Phase Decapping at Loc.No.791

Kolhapur - Mapusa - I

05/03/2014

16.45

Continued.

Over Voltage

Dhule-Sar'Sarovar - II

05/03/2014

21.55

Continued.

Over Voltage

Voltage Level :

400KV

Outage Type HAND TRIPPED


Over Voltage,RFC 20.16Hrs on
Continued.
02.03.14
09.21
Over Voltage

Outage Type

TRIPPED

Solapur-Solapur(PGCIL)

26/02/2014

19.39

Continued.

Distance Protection.

Karad - Solapur (PGCIL)

26/02/2014

19.54

Continued.

Distance Protection.

Koradi-Bhilai

04/03/2014

06.11

05/03/2014

07.47

Distance Prot.

IntraState
Voltage Level :

400KV

Bus Coupler @ Bhusawal


80 MVAR Bus Reactor @
Nagothane
A Bus at Nagothane
Voltage Level :

Outage Type PLANNED OUTAGE


For Replacement Of OLD MOCB
Continued.
Under Jaica-2 Outage.

25/02/2014

10.30

05/03/2014

09.35

05/03/2014

20.12

Isolator Alignment work

05/03/2014

10.36

05/03/2014

20.04

Isolator Alignment work

220KV

Outage Type

PLANNED OUTAGE

Pusad-Nanded
Ghodbandar - Bhoisor
(MSETCL)

05/12/2013

06.03

Continued.

220KV Ghatodi S/S LILO Work.

07/12/2013

10.38

Continued.

MUMBAI STRENGTENING WORK

Borivali - Ghodbandar - II

05/02/2014

10.14

Continued.

Panama - Pedambe

05/03/2014

08.35

05/03/2014

17.20

Tower Erection of Loc.8 & M/C


Stringing.
Replacement of Old Insulator String

Beed-Patoda I

05/03/2014

09.30

05/03/2014

15.20

Tan Delta Testing of Line CTs

Warora - Rly TSS - II

05/03/2014

11.05

05/03/2014

14.44

Tan Delta Measurement of CTs

Usmanabad-Barshi

05/03/2014

14.50

05/03/2014

18.30

Tan Delta of CT

Warora - RLY TSS CKT - I 05/03/2014

15.50

05/03/2014

20.12

Tan Delta Measurement of CTs

Kalwa - Siemens

16.28

05/03/2014

18.17

CRM Testing

Voltage Level :

05/03/2014
400KV

Parli - Solapur
Voltage Level :

Outage Type
05/03/2014

15.41

05/03/2014

400KV

18.22

FORCED OUTAGE

Replacement of CVT Jumper

Outage Type HAND TRIPPED


Over Voltage.(RFC 20.35 Hrs on
Continued.
16.02.14)
Continued. Over Voltage.

New Koyna - Dabhol - I

06/02/2014

00.02

Dabhol-Nagothane - II

28/02/2014

21.35

Karad-Kolhapur-II

04/03/2014

16.09

05/03/2014

07.40

Over Voltage

Karad-Jaigad I

04/03/2014

16.39

05/03/2014

07.41

Over Voltage

Lonikand- Koyna Stage IV

04/03/2014

21.52

05/03/2014

07.20

Over Voltage

Karad - Kolhapur - II

05/03/2014

16.06

Continued.

Over Voltage

Karad-Jaigad I

05/03/2014

16.41

Continued.

Over Voltage

400 KV Bus Coupler @

05/03/2014

18.50

05/03/2014

20.27

Air Leakage of Bus Coupler CB


5 of 7

State Load Dispatch Center,Airoli (MSETCL)


Details of Line outages/Trippings for 05/Mar/2014
Position as on 6.30 Hrs of 06/Mar/2014

Name of Line

Tripped
Date

Lonikand- Koyna Stage IV

06/03/2014

Tripped Synchronise Synchronise


Time
d Date
d Time

Reason of Outage

Kalwa
Voltage Level :

Over Voltage

Outage Type
05/03/2014

17.01

Continued.

220KV

Vita - Lamboti
Voltage Level :

Continued.

400KV

Karad-Lamboti
Voltage Level :

00.21

Over Voltage

Outage Type
05/03/2014

16.49

05/03/2014

132KV

21.25

TRIPPED
TRIPPED

Insulator Flashover

Outage Type

TRIPPED

Paras - Warwat Bakal

05/03/2014

06.28

05/03/2014

06.41

Distance Protection

Nanded - Vishnupuri - II

05/03/2014

19.00

05/03/2014

21.00

Backup Protection

Dhule - Dhule - I
220KV Dhule - 132KV
Dhule - II

05/03/2014

22.17

05/03/2014

23.45

05/03/2014

22.17

05/03/2014

22.46

Distance Protection
Y Phase Bus PT Burst at 220KV Dhule
S/S.

6 of 7

State Load Dispatch Center,Airoli (MSETCL)


Details of On Line Capacity for 06/Mar/2014
Generating unit
Koradi
Unit 5
Unit 6
Unit 7
Bhusawal
Unit 2
Unit 3
Unit 4
Unit 5
Parli
Unit 3
Unit 4
Unit 5
Unit 6
Unit 7
Chandrapur
Unit 1
Unit 2
Unit 3
Unit 4
Unit 5
Unit 6
Unit 7
Paras
Unit 3
Unit 4
Khaparkheda
Unit 1
Unit 2
Unit 3
Unit 4
Unit 5
Nasik
Unit 3
Unit 4
Unit 5
Uran
All Units
PENCH (MS)
Pench (MS)
Koyna
Stage 1-2
Stage 4
Stage 3
Hydro
KDPH
VTRNA

Derated Capacity
(MW)

OLC (MW)

200
210
210
620

0
130
130
260

210
210
500
500
1420

0
140
380
375
895

210
210
210
250
250
1130

0
131
126
170
168
595

210
210
210
210
500
500
500
2340

140
0
190
210
450
430
350
1770

250
250
500

250
250
500

210
210
210
210
500
1340

180
180
195
0
500
1055

210
210
210
630

0
190
190
380

852
852

270
270

Generating unit
TILLARI
BHTGR/VEER
BHIRA T.R.
RNGR+BHTSA
BHANDARDRA
ELDARY
SMLHY_PTN
GHATGHAR
Wind
MalharPeth
Vankuswadi
ATIT
Kale
Satara
Shirala
K Mahankal
Supa
Vita
Dondaicha
Sakri
Nandurbar
Khandke
Khaparale
CPP
JSW_JAIGAD
WARDHA
Adani
Other_CPPs
SOLAR
Total
Tata
Trombay 4
Trombay 5
Trombay 6
Trombay 7A
Trombay 7B
Trombay 8
TATA Hydro
REL
1&2
Cent_Sect
Share

53
53
600
1000
320
1920

600
250
320
1170

40
60

18
0

Derated Capacity
(MW)

OLC (MW)

60
21
80
20
45
23
12
250
611

60
0
40
0
35
0
0
0
153

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1200
405
1980
300
3885

691
185
1695
495
3066

0
0
150
500
500
120
60
250
444
2024

0
500
0
120
60
0
447
1127

500
500

500
500

3455
3455

5222
5222

21280

7 of 7

16963

You might also like