Unloading operation
Hazards/ Keywords Description/ Causes Consequences Safeguards Fatallity
1. Unloading arms - leakage from swivel joints 1. Leakage from swivel joints would be minor leakages 1. N2 purge and leak detection system N/A
2. Unloading arms - leakage from mechanical flange joints
2. Liquid spill or vapour release; potential fire; impact on
structure due to cold liquid spill
2. Operator monitoring 1
3. Unloading arms - disconnection under extreme weather condition 3. Emergency shutdown of unloading operation 1
4. One of the liquid unloading arms can be used as vapour return arm
during maintenance of vapour arm; periodic maintenance of arms/
swivel joints
5. Gas detection and low temp. detection; fire detection; fire water
monitors at the jetty at different elevation (remote operated)
6. Loading arm platform designed to withstand cold liquid spill
7. Arm position limit detection and activation of shutdown valves at
jetty end
8. Powered Emergency Release Coupler with valves at either end of
coupling results in isolation of both ship end and jetty end
9. Spill containment system at the jetty platform with high expansion
foam
10. Continuous water curtain during unloading localised at the ship
manifold area
1. Spill containment system & emergency shutdown system on the
ship
2. Fire protection system on the ship
3. Fire protection system at the jetty
4. Tugs with fire fighting capability
2. Hydraulic control is slow and controlled
3. Weather condition check
4. Cabling assisted connection to enable loading arm operation under
adverse conditions if required
1. Fall from gangway, jetty platform 1. Guard rails on platform and gangway
2. PPE (flotation devices)
3. Controlled access to the platform/ gangway
4. Controlled access to the arm coupling connection
5. PPE (hard hats) and controlled access
6. Operating Procedures
1. Tug assisted berthing with approach speed limits and indicators
2. Fenders designed for specified impact load
3. Mooring masters on the shore side to supervise the berthing
4. Local HK Pilots onboard LNG carriers during berthing
1. Maintenance of arm - replacement of seals (about once every 5
years) - undertaken between unloading operations and will require
scaffolding
2. Replacement of arm (expected about once every 20 years) - this will
require barge/ crane operation. Operation undertaken between
unloading operations
7. Emergency Egress 1. Emergency on the ship or the jetty 1. Potential injury if unable to escape
1. Normal access to the jetty and secondary egress to the mooring
dolphin
8
8. Others - jetty operator shelter 1. Weather shelter for operator presence during unloading operations 1. No significant issue N/A
N/A
3. Manual Operations
1. Arm movement and coupling connection between the arm and ship
manifold (done on the ship) thru hydraulic controls operated manually.
1. Impact of arm on the ship manifold due to operator
error or due to ship movement. Possible damage to the
arm connection coupler
1. Operator training 1
1.00E+00
2. Gangway positioning from the platform to the ship 2. Impact with the ship causing damage to the gangway
1. Loss of containment
3. Impact of cold liquid spill leaking from the connection
flange on the ship manifold area
4. Leak from piping and equipment at the jetty - drain vessel and/or
knock-out drum
2. Spill/ Fire on the carrier while berthed 1. Spill from connections on the ship deck
1. Radiation effects on the jetty structure and facilities and
personnel
8
4. Personnel Hazard 1. Possible injury
2. Contact with cold surfaces - coupling connection on the ship
(platform piping is insulated)
3. Ice falling off from the arm after disconnection
N/A
5. Impact while berthing
1. Impact of LNG carrier on the jetty while berthing due to higher than
operational approach speed limit
1. Damage to jetty structure; possible damage to piping
6. Maintenance
1. General personnel hazards associated with
maintenance activities, such as fall
1. Operating and safety procedures
8
N/A
Frequency Category Recommendations
0.019 Negligible
6.50E-04 Alarp
2.50E-04
7.80E-03 ALARP
3.20E-03 Negligible
ALARP
Alarp
Negligible
4.04E-04 Negligible
2.40E-04
3.40E-03
4.04E-04
Negligible
N/A Negligible
ALARP 3.27E-04
N/A
0.0035
Safe dore sorurce hal 20
0.0035
0.0032
0.000028668
0.000091573
5.28668E-05
0.00012282
0.00001535
0.000015506
0.00032678380
0.1
0.01