0% found this document useful (0 votes)
25 views

State Load Dispatch Center, Airoli: Daily System Report

The document is a daily system report from the State Load Dispatch Center in Airoli, Maharashtra providing information on electricity generation and demand in the state for January 11, 2014. It details generation by source including thermal, hydro, gas and renewables. It also provides information on electricity exchanges with other states and regions, peak demand levels throughout the day, and frequency levels. Total generation was 231 million units with peak demand reaching 17,984 MW in the morning. Frequency levels remained stable between 49.97-50.28 Hz.

Uploaded by

Tuku Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views

State Load Dispatch Center, Airoli: Daily System Report

The document is a daily system report from the State Load Dispatch Center in Airoli, Maharashtra providing information on electricity generation and demand in the state for January 11, 2014. It details generation by source including thermal, hydro, gas and renewables. It also provides information on electricity exchanges with other states and regions, peak demand levels throughout the day, and frequency levels. Total generation was 231 million units with peak demand reaching 17,984 MW in the morning. Frequency levels remained stable between 49.97-50.28 Hz.

Uploaded by

Tuku Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

Maharashtra State Electricity Transmission

Company Ltd.

State Load Dispatch Center,


Airoli
Daily system Report
for
11/Jan/2014

0 of 8

State Load Dispatch Center,Airoli (MSETCL)


Daily system Report for 11/Jan/2014 SATURDAY
GENERATION (MUs)
II
EXCHANGES (MUs)

I
A) MSGENCO

Daily

1) Thermal
2) Hydro
3) Gas
Total MSGENCO
B) 1) JSW JAIGAD
2) WPCL
3) ADANI
4) Other CPP / IPP
5) Wind Generation
6) PENCH (MS)
7) SOLAR
C) 1) TPCL Thermal
2) TPCL Hydro
TOTAL TPCL
3) REL Thermal
D) STATE
1) Thermal

Monthly

115.659
17.820
6.036
139.515
19.693
5.532
28.050
9.740
3.204
0.531
0.910
14.703
3.580
18.283
5.790

(A2+B6+C2)
2) Hydro
(A3)
3) Gas
(B5)
4) Wind
5)CPP/IPP (B1+B2+B3+B4)
(B7)
6) SOLAR

136.152
21.931
6.036
3.204
63.015
0.910

TOTAL STATE

231.248

(A1+C1+C3)

E) Central Sector

1326.829
214.595
65.855
1607.279
216.166
37.334
374.850
118.573
41.190
4.101
9.001

Daily

1) Gujrat
2) Madhya Pradesh
3) Chattisgarh
4) Maharashtra Net
(Incl. 765kV Solapur-Raichur)

5) Goa
6) TAPS 1&2 Injection
7) RGPPL Injection
8) Pench (Excess)

# Total Cent. Sector


F) Other Exchanges
187.504 1) With TPCL (Excess)
44.411 G) Bilateral Power *
231.915 1) MSEDCL Bilateral
86.231
Include PX

1600.564
263.107
65.855
41.190
400.123
9.001
2379.840

2) MUMBAI Bilateral
Include PX
3) MUMBAI Schedule

Monthly

8.123
17.677
9.300
88.057

59.599
202.725
99.970
859.447

0.000

-1.690

-5.401
7.623
0.000
-0.531

-63.157
83.569
0.000
0.647

124.848

1242.800

-17.589

-192.716

30.046
0.000
16.326
5.947
17.961

190.492
-18.787
162.878
64.435
168.913

314.434

3458.578

27.765

339.117

13.896

171.740

356.095

3969.435

H) ENERGY CATERED (MUs)


1) MSEDCL
2) TPCL
3) REL
TOTAL STATE

DETAILS OF MAHARASHTRA STATE PEAK DEMAND(MW)


PARTICULARS
MSGENCO Thermal
MSGENCO Hydro
MSGENCO Gas
MSGENCO Total Generation
Central Sector Receipt
WIND
CPP / IPP
SOLAR
Exchange with Mumbai
MSEDCL DEMAND MET
Load Shedding
MSEDCL DEMAND
TPCL GENERATION
R-INFRA GENERATION
TPCL+R-INFRA DEMAND
STATE DEMAND MET
STATE DEMAND
Frequency (Hz)

A. Morning Peak at 12
Hrs
4905
2234
329
7468
5500
81
2738
145
-956
15002
803
15805
963
260
2179
17181
17984
50.13

B. Evening Peak at 17
Hrs
4932
1073
259
6264
5283
83
2729
25
-630
13778
419
14197
996
261
1887
15665
16084
50.01

C. Night Minimum at 3
Hrs
4613
112
215
4940
4731
243
2393
0
-609
11723
158
11881
445
198
1252
12975
13133
50.15

FREQUENCY PARTICULARS
MAXIMUM FREQ.

MINIMUM FREQ.

50.52 Hz at 13.00 Hrs 49.64 Hz at 18.43 Hrs

AVERAGE FREQ.

FREQ. BELOW 49.2 Hz

50.09

0 % of Time(min)

* Displayed for information, not added in total. # Total Cent. Sector includes MSEDCL and TPCL bilateral power.

Shift Engineer

Shift Incharge
1 of 8

State Load Dispatch Center,Airoli (MSETCL)


Daily and Progressive Generation,Maximum,Minimum,OLC Details for 11/Jan/2014
Generating
unit

Generation
Daily
(Mus)

Monthly Max
(Mus) (MW)

Min
(MW)

OLC
(MW)

Koradi

Total

Unit 5
Unit 6
Unit 7

3.03
3.34
3.51

14.47
33.93
37.46

Total

9.88

85.87

Unit 2
Unit 3
Unit 4
Unit 5

3.24
3.50
9.28
7.02

28.33
30.62
97.34
71.15

Total

23.04

227.43

Unit 3
Unit 4
Unit 5
Unit 6
Unit 7

0.00
3.16
0.00
3.86
3.90

0.00
37.19
31.03
46.97
46.20

Total

10.92

161.39

Unit 1
Unit 2
Unit 3
Unit 4
Unit 5
Unit 6
Unit 7

3.48
3.48
4.17
4.66
0.00
9.80
6.88

36.58
36.70
45.87
50.84
0.00
105.26
100.00

Total

32.47

375.24

Unit 3
Unit 4

5.09
4.99

45.72
55.21

Total

10.08

100.93

Unit 1
Unit 2
Unit 3
Unit 4
Unit 5

3.96
0.00
4.33
3.97
8.43

39.10
21.27
40.15
40.80
105.84

Total

20.70

247.17

138
156
160

100
129
135

125
135
350
275

0.45
0.00
0.24
0.08
0.28
0.36
0.00
0.00
0.91
2.31

4.38
0.00
0.24
0.84
2.54
2.99
2.02
0.27
11.13
21.40

Total

4.63

45.81

MalharPeth
Vankuswadi
ATIT
Kale
Satara
Shirala
K Mahankal
Supa
Vita
Dondaicha
Sakri
Nandurbar
Khandke
Khaparale

0.14
0.22
0.05
0.11
1.02
0.09
0.01
0.06
0.23
0.94
0.14
0.13
0.04
0.04

1.66
2.86
1.12
0.97
9.32
0.83
0.89
0.88
2.91
12.93
1.75
0.98
2.53
1.56

220
220

Total

3.20

41.19

440
165
0
190
190
400

JSW_JAIGAD
WARDHA
Adani
Other_CPPs

19.69
5.53
28.05
9.74

216.17
37.33
374.85
118.57

Total

63.02

746.92

Total

0.91

9.00

945

Total

0.91

9.00

Trombay 4
Trombay 5
Trombay 6
Trombay 7A
Trombay 7B
Trombay 8
TATA Hydro

0.00
10.27
0.00
2.82
1.61
0.00
3.58

0.00
111.17
0.00
15.92
11.84
48.56
44.41

Total

18.28

231.92

1&2

5.79

86.23

Total

5.79

86.23

150
150
419
719

0
123
0
156
156

0
120
0
155
105
380

Chandrapur

155
150
193
210
0
435
342

133
137
160
175
0
360
258

150
140
200
210
0
425
300
1425

Paras

229
230

189
190

Khaparkheda

175
0
195
183
390

150
0
170
145
329

Nasik

Min
(MW)

OLC
(MW)
1170

Hydro

19
0
65
4
41
15
0
0
45
250

18
0
0
3
0
15
0
0
35
0

18
0
0
4
41
0
0
0
26
0
89

Wind

CPP

890
232
1230

707
228
1040

811
1234
230
2275

SOLAR

Tata

Unit 3
Unit 4
Unit 5

4.28
4.29
0.00

46.37
46.63
35.79

Total

8.57

128.79

All Units

6.04

65.86

Total

6.04

65.86

190
189
0

165
168
0

190
190
0
380

Uran

333

210

210
210

PENCH (MS)

Pench (MS)

0.53

4.10

Total

0.53

4.10

27

4.75
6.21
2.24

50.06
89.40
29.33

10.96

139.45

580
1120
304

40
0
0

0
502
0
135
72
0
327

0
316
0
68
52
0
0

0
500
0
120
60
0
447
1127

REL

Koyna

Koyna 12&4 Total

Monthly Max
(Mus) (MW)

KDPH
VTRNA
TILLARI
BHTGR/VEER
BHIRA T.R.
RNGR+BHTSA
BHANDARDRA
ELDARY
SMLHY_PTN
GHATGHAR

Parli

0
158
0
167
169

Daily
(Mus)

168.79

410
140
155
420
310

Generation

13.19

130
130
150

Bhusawal

Stage 1-2
Stage 4
Stage 3

Generating
unit

600
250
320
850

263

198

250
250

Cent_Sect

Share

5140

Total

5140

Thermal
Thml+Gas
Hydro
Total
State Total
MS
PG
CL

115.66
121.70
17.82
139.52
231.25

1326.83
1392.68
214.60
1607.28
2379.84

4699
4909
1259
6168
14960

2 of 8

State Load Dispatch Center,Airoli (MSETCL)


Hourly Load Data As on 11/Jan/2014

TIME MSPGCL GEN.


Mum. MSEDCL LOAD MSEDCL TPCL + R
CPP /
CS
CS Mum.S
STATE FREQ.
SR.
TOTAL WIND
SOLAR
NET
DEM. SHEDDI DEM.
-INFRA
IPP
SHARE RECPT CH.
DEMAND (Hz)
NO. THM HY GAS
EXCH.
MET
NG
WITH LS DEMAND
1 4726

112

214

5052

280

2540

4616

4736

-736

-662

11970

81

12051

1380

13431

50.14

2 4616

112

210

4938

263

2467

4570

4694

-660

-558

11828

158

11986

1266

13252

50.28

3 4613

112

215

4940

243

2393

4578

4731

-641

-609

11723

158

11881

1252

13133

50.15

4 4685

112

214

5011

216

2387

4323

4839

-630

-582

11896

166

12062

1220

13282

50.16

5 4668

117

214

4999

197

2517

4311

4806

-623

-595

11948

201

12149

1234

13383

50.15

6 4742

112

215

5069

127

2602

4735

5073

-643

-569

12328

571

12899

1287

14186

50.16

7 4767

232

214

5213

126

2636

4938

5307

-685

-540

12769

1051

13820

1418

15238

50.17

8 4851 1166

216

6233

93

2704

4734

5188

-536

-413

13834

1094

14928

1536

16464

50.05

9 4871 1892

316

7079

80

2735

42

4585

4894

-607

-588

14269

999

15268

1750

17018

49.97

10 4884 2235

324

7443

61

2731

88

4858

5453

-678

-699

15102

748

15850

1991

17841

50.01

11 4890 2187

333

7410

72

2730

107

4969

5360

-870

-892

14812

688

15500

2125

17625

50.09

12 4905 2234

329

7468

81

2738

145

5252

5500

-926

-956

15002

803

15805

2179

17984

50.13

13 4883 1612

283

6778

94

2748

145

5407

5707

-891

-894

14601

921

15522

2121

17643

50.03

14 4948 1102

265

6315

108

2725

138

5431

5920

-765

-751

14479

774

15253

1968

17221

50.15

15 4990 1027

242

6259

98

2735

107

5354

5901

-719

-700

14425

515

14940

1935

16875

50.10

16 4962 1281

241

6484

117

2709

100

5375

5739

-796

-619

14553

427

14980

1897

16877

50.03

17 4932 1073

259

6264

83

2729

25

5191

5283

-783

-630

13778

419

14197

1887

16084

50.01

18 4942

163

258

5363

59

2729

5013

4795

-694

-757

12221

451

12672

1925

14597

50.16

19 4933

166

258

5357

64

2740

5247

4821

-914

-829

12178

265

12443

2049

14492

50.01

20 4874

235

259

5368

99

2731

5399

5264

-972

-928

12560

289

12849

2127

14976

50.04

21 4845

179

251

5275

140

2609

5167

5513

-826

-978

12584

171

12755

2024

14779

50.00

22 4769

113

249

5131

160

2542

5089

5376

-762

-1053

12166

101

12267

1892

14159

50.11

23 4697

118

228

5043

183

2452

5212

5053

-893

-994

11737

31

11768

1703

13471

50.01

24 4677

128

229

5034

160

2386

5029

4895

-711

-793

11682

33

11715

1496

13211

50.16

115.6
17.82 6.04 139.53
3.20 63.02
0.91 119.38 124.85 -17.96 -17.59 314.44 11.12
325.56
41.66
367.22
7
NOTE : ALL VALUES IN MW
Mumbai Sch./Net Exch is shown with reference to MSETCL System. (+) indicates Mum. to MSETCL and (-) indicates
MSETCL to Mum. Mumbai Schedule is calculated for MSETCL periphery (taking 4% loss for import & 4.85% MSETCL loss
MUs

# Without Applying Load Diversity Factor

3 of 8

50.09

State Load Dispatch Center,Airoli (MSETCL)


Details of Generating Unit Outages/Trippings for 11/Jan/2014
Position as on 6.30 Hrs of 12/Jan/2014
Name of Generating
Unit

Capacity

Tripped
Date

Trippe
Sync.Date
d Time

Sync.
Time

210

13/02/2013

23.50

Continued. Water Shortage

500

14/07/2013

00.01

Continued.

250

04/01/2014

23.38

Continued. Annual Overhaul

Dabhol 1B

230

28/05/2013

22.02

Continued. Gas shortage.

Dabhol 3A

230

06/06/2013

08.28

Continued. Gas Shortage

Dabhol 2A

230

06/06/2013

09.10

Continued. Gas Shortage

Dabhol 1X

290

27/06/2013

21.46

Continued. Gas Shortage

Dabhol 1A

230

27/06/2013

21.47

Continued. Gas Shortage

Dabhol 2X

290

15/07/2013

15.09

Continued. Gas Shortage

Tata Trombay 6

500

19/07/2013

23.54

Continued. Economic shut down.

Dabhol 2B

230

08/08/2013

15.03

Continued. Gas Shortage

300

02/10/2013

00.45

Continued.

CPP JSW (J) U2

300

21/10/2013

00.00

Continued. Lack of Shedule.

Uran Unit 5

108

25/11/2013

21.33

Continued. Gas Shortage.

CPP WPCL U-2

135

13/12/2013

13.17

Continued. ID Fan problem

135

22/12/2013

00:07

Continued.

Dabhol 3X

290

29/12/2013

05.47

Continued. Gas Shortage

Dabhol 3B

230

29/12/2013

06.14

Continued. Gas Shortage

Uran Unit 8

108

03/01/2014

14.06

Continued. Gas Shortage

CPP INDIABULLS

270

04/01/2014

09.18

Continued. Coal Shortage

Khaparkheda Unit 2

210

07/01/2014

21.02

Continued. Heavy oil consumption.

660

08/01/2014

03.17

12/01/2014

09.37

Super heater & Value


Leakage.

Nasik Unit 5

210

09/01/2014

10.05

12/01/2014

00:50

B.T.L.

Parli Unit 5

210

09/01/2014

18.11

Continued. coal shortage

250

09/01/2014

22.54

Continued.

Emergency H/T,Fire at
turbine track.

120

10/01/2014

00.12

00.48

Hydac Pump Problem.

Expected
Date

Reason of Outage

PLANNED OUTAGE
Parli Unit 3
Chandrapur Unit 5
REL 1

Condenser replacement
work.

FORCED OUTAGE

CPP VIPL

CPP WPCL U-4

CPP Adani U-3

Tata Trombay 8
Uran Unit A0

11/01/2014

Turbine bearing vibration


high.

Generation Water Cooler


Leakage.

4 of 8

State Load Dispatch Center,Airoli (MSETCL)


Details of Line outages/Trippings for 11/Jan/2014
Position as on 6.30 Hrs of 12/Jan/2014

Name of Line

Tripped
Date

Tripped Synchronise Synchronise


Time
d Date
d Time

Reason of Outage

InterState
Voltage Level :

220KV

Borivali -Tarapur
Voltage Level :

Outage Type
07/12/2013

10.15

Continued.

220KV

Mahalakshmi - Amona
Voltage Level :
400KV
Solapur PG 765 KV Raichur - I
Kolhapur - Mapusa - I
Kolhapur-Solapur(PGCIL)I
Dhule-Sar'Sarovar - I

MUMBAI STRENGTHENING WORK

Outage Type
11/01/2014

08;51

11/01/2014

15;22

FORCED OUTAGE

To Clean Polluted Disk Insulator.

Outage Type

HAND TRIPPED

10/01/2014

07.31

10/01/2014

16.09

11/01/2014

08;19

Over Voltage.

10/01/2014

16.40

11/01/2014

09:36

Over Voltage.

10/01/2014

21.52

11/01/2014

06;39

Over Voltage.

Kolhapur - Mapusa - II

11/01/2014

15:52

12/01/2014

07.50

Over Voltage.

Kolhapur-Solapur (PG) II

11/01/2014

16:16

12/01/2014

07.59

Over Voltage.

Dhule-Sar'Sarovar - II

11/01/2014

20.08

12/01/2014

07.59

Over Voltage.

Kolhapur - Mapusa - II

12/01/2014

16.08

Continued.

Over Voltage

Karad - Solapur (PGCIL)


12/01/2014
Kolhapur-Solapur(PGCIL)12/01/2014
I
Dhule-Sar'Sarovar - II
12/01/2014

17.02

Continued.

Over Voltage

21.40

Continued.

Over Voltage

21.58

Continued.

Over Voltage

Voltage Level :

220KV

Wardha - Deoli (PGCIL)


Voltage Level :

Continued.

PLANNED OUTAGE

Outage Type
05/12/2013

19.30

Continued.

132KV

Kanhan - Pench - I

Outage on Talchar-Kolhar HVDC line.

11/01/2014

HAND TRIPPED

To control wardha-Yeotmal O/L

Outage Type HAND TRIPPED


Completion of Khaperkheda-Kanhan
Continued. Outage and Withdeawal of Pench
Suport.

19:17

IntraState
Voltage Level :
400KV
400/132 KV 200 MVA ICT
11/11/2013
- II @ Khadka
440/220 KV 315 MVA ICT11/01/2014
II @ BBLSR
Voltage Level :
220KV

Outage Type
09.07
09:00

Continued.
11/01/2014

PLANNED OUTAGE

Repl.of Old 200 MVA ICT Under LES

Q.M. Work,SFRA,Relay Testing Work


etc.
Outage Type PLANNED OUTAGE

18:49

Pusad-Nanded
Ghodbandar - Bhoisor
(MSETCL)

05/12/2013

06.03

Continued.

220KV Ghatodi S/S LILO Work.

07/12/2013

10.38

Continued.

MUMBAI STRENGTENING WORK

Khaparkheda - Kanhan

08/01/2014

11.51

Continued.

Khaparkheda - Suryalaxmi 08/01/2014

12.36

Continued.

Bus Section III @


Temghar.

11/01/2014

07:04

11/01/2014

12;16

Temghar - Padgha

11/01/2014

07:38

11/01/2014

11;50

Trombay-Dharavi-VI

11/01/2014

08:06

11/01/2014

18:56

Nivali-N'koyna
Half Bus Section at
Vankuswade

11/01/2014

09:08

11/01/2014

14:05

11/01/2014

10:05

11/01/2014

21:35

Dismantiling of old existing tower


conductor & E/W & stringing of new
conductor & E/W from B+0 to B+9.
Dismantiling of old existing tower
conductor & E/W & stringing of new
conductor & E/W from B+0 to B+9.
Attending Critical Hot Spot.
Attending Critical Hot Spot at Bus
Section-3.
Cable Sealing and Erection Work.
CT Tan Delta and R.M. Work.
Replacement of B-ph Jaw of Main Bus
Isolator of M'pith Bay.
5 of 8

State Load Dispatch Center,Airoli (MSETCL)


Details of Line outages/Trippings for 11/Jan/2014
Position as on 6.30 Hrs of 12/Jan/2014

Name of Line

Tripped
Date

Tripped Synchronise Synchronise


Time
d Date
d Time

Reason of Outage

Jambhul - Anandnagar

11/01/2014

10:36

11/01/2014

19:00

Old Disc. Insulator Replacement.

Main Bus at Kalyani

11/01/2014

10:52

11/01/2014

13:26

To Attend CT Oil Leakage.

Lonikand - Bhosari
220/132 KV 200 MVA T/F
- II @ Lonand
Parli-Usmanabad

11/01/2014

10:56

11/01/2014

18:55

Disc. Insulator Replacement.

12/01/2014

07.04

12/01/2014

10.45

HV side CT Leakage

12/01/2014

08.20

12/01/2014

11.03

Hot Spot

Dahanu-Bhoisor
12/01/2014
220/132 KV 200 MVA ICT
12/01/2014
- I @ Borivali
Voltage Level :
400KV

08.33

12/01/2014

17.53

Maint.work

09.33

12/01/2014

18.19

R.M.Work

Deepnagar-Waluj I

03/12/2013

12:08

Continued.

Over Voltage.

New Koyna - Dabhol - I

01/01/2014

02.54

Continued.

H/T For O/V.

Bhusawal - Deepnagar - II
Talegaon PG Aurangabad - II
Karad - Kolhapur - II

03/01/2014

15.47

Continued.

For Change Over.

09/01/2014

13.41

Continued.

over voltage

10/01/2014

15.54

11/01/2014

07:24

Over Voltage.

Karad-Jaigad I

10/01/2014

16.14

11/01/2014

07:41

Over Voltage.

Bhusawal- Aurangabad

10/01/2014

17.07

Continued.

Over Voltage.

Lonikand- Koyna Stage IV

10/01/2014

21.08

11/01/2014

07:35

Over Voltage.

Karad - Kolhapur - I

11/01/2014

15:47

12/01/2014

07.48

Over Voltage.

Karad-Jaigad I

11/01/2014

17:35

12/01/2014

09.40

Over Voltage.

Lonikand- Koyna Stage IV

11/01/2014

21:49

12/01/2014

08.25

Over Voltage.

Karad - Kolhapur - II

12/01/2014

15.55

Continued.

Over Voltage

Karad-Jaigad I

12/01/2014

16.25

Continued.

Over Voltage

Lonikand- Koyna Stage IV

12/01/2014

21.43

Continued.

Over Voltage

Voltage Level :

Outage Type

220KV

Outage Type

Chikhali - Jalna - II

06/01/2014

19.47

Continued.

Chikhali - Jalna - I

06/01/2014

19.47

Continued.

Kanhan - Bhandara - I

08/01/2014

11.16

11/01/2014

Kanhan - Bhandara - II

08/01/2014

11.20

11/01/2014

11/01/2014

19:17

Dabhol-Nagothane - II
31/12/2013
400/220 KV,500MVA ICT 11/01/2014
III at Parly
Karad-Kolhapur-II
11/01/2014

02.29

Nagothane-Dabhol-I

Voltage Level :

132KV

Mansar - Pench
Voltage Level :

400KV

12/01/2014

HAND TRIPPED

HAND TRIPPED

Paras-Chikhali line O/L

Paras-Chikhali O/L
In view of 220KV K'kheda-Kanhan and
18:52
K'kheda-Suralaxmi ckt under outage.
In view of 220KV K'kheda-Kanhan and
19:00
K'kheda-Suryalaxmi ckt under outage.
Outage Type HAND TRIPPED
Completion of Khaperkheda-Kanhan
Continued. Outage and Withdeawal of Pench
Suport.
Outage Type TRIPPED
Continued.

Over Voltage.

09;57

11/01/2014

10:10

Monkey Climbed on 500 MVA ICT.

17:44

12/01/2014

07.58

Over Voltage.

17.05

12/01/2014

18.59

Over Voltage

Voltage Level :
220KV
Talandge - Sawantwadi 29/10/2013
II.
Murud - Girawli.
11/01/2014

17.30
09:46

11/01/2014

10:20

Monkey Climbed on 500 MVA ICT.

Parli-Usmanabad

09:47

11/01/2014

10:26

Monkey Climbed on 500 MVA ICT.

Voltage Level :

11/01/2014
132KV

Outage Type
Continued.

TRIPPED

Dist Prot.

Outage Type

TRIPPED
6 of 8

State Load Dispatch Center,Airoli (MSETCL)


Details of Line outages/Trippings for 11/Jan/2014
Position as on 6.30 Hrs of 12/Jan/2014

Name of Line

Tripped
Date

Tripped Synchronise Synchronise


Time
d Date
d Time

Reason of Outage

Shivaji Nagar - Dhule

11/01/2014

07:07

11/01/2014

07:35

Shivaji Nagar - Sakri

11/01/2014

07:07

11/01/2014

07;40

Girwali - Kej

11/01/2014

09;50

11/01/2014

10:12

Tiwsa-Talegaon Ckt.

11/01/2014

18;27

11/01/2014

19;43

Talegaon - Mazargaon

12/01/2014

01.15

12/01/2014

02.10

At 220 Kv Shivaji Nagar S/stn. 33 Kv


Bus Section CT Burst due to which ckt
tripped.
At 220 Kv Shivaji Nagar S/stn. 33 Kv
Bus Section CT Burst due to which ckt
tripped.
Monkey Climbed on 500 MVA ICT.
Distance Protection Operated Zone-1
B-E Fault.
Over Current

Beed- Raimoha

12/01/2014

06.48

12/01/2014

07.09

Distance Protection

Kej - Kallam

12/01/2014

08.00

12/01/2014

08.12

Back Up relay operated

7 of 8

State Load Dispatch Center,Airoli (MSETCL)


Details of On Line Capacity for 12/Jan/2014
Generating unit
Koradi
Unit 5
Unit 6
Unit 7
Bhusawal
Unit 2
Unit 3
Unit 4
Unit 5
Parli
Unit 3
Unit 4
Unit 5
Unit 6
Unit 7
Chandrapur
Unit 1
Unit 2
Unit 3
Unit 4
Unit 5
Unit 6
Unit 7
Paras
Unit 3
Unit 4
Khaparkheda
Unit 1
Unit 2
Unit 3
Unit 4
Unit 5
Nasik
Unit 3
Unit 4
Unit 5
Uran
All Units
PENCH (MS)
Pench (MS)
Koyna
Stage 1-2
Stage 4
Stage 3
Hydro
KDPH
VTRNA

Derated Capacity
(MW)

OLC (MW)

Generating unit

200
210
210
620

110
150
135
395

210
210
500
500
1420

130
150
419
301
1000

210
210
210
250
250
1130

0
130
0
172
168
470

210
210
210
210
500
500
500
2340

150
140
150
180
0
425
360
1405

250
250
500

220
220
440

210
210
210
210
500
1340

180
0
190
190
450
1010

210
210
210
630

190
190
190
570

852
852

230
230

53
53

0
0

600
1000
320
1920

600
250
320
1170

40
60

18
0

TILLARI
BHTGR/VEER
BHIRA T.R.
RNGR+BHTSA
BHANDARDRA
ELDARY
SMLHY_PTN
GHATGHAR
Wind
MalharPeth
Vankuswadi
ATIT
Kale
Satara
Shirala
K Mahankal
Supa
Vita
Dondaicha
Sakri
Nandurbar
Khandke
Khaparale
CPP
JSW_JAIGAD
WARDHA
Adani
Other_CPPs
SOLAR
Total
Tata
Trombay 4
Trombay 5
Trombay 6
Trombay 7A
Trombay 7B
Trombay 8
TATA Hydro
REL
1&2
Cent_Sect
Share

Derated Capacity
(MW)

OLC (MW)

60
21
80
20
45
23
12
250
611

60
3
41
0
0
0
26
0
148

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1200
405
1980
300
3885

790
250
1234
2274

0
0
150
500
500
120
60
250
444
2024

0
500
0
120
60
0
447
1127

500
500

250
250

3455
3455

5324
5324

21280