RIPE Inflatable Packers manufactures and supplies inflatable packers for down-hole packer tests, casing repairs, hydraulic fracturing, water well abandonments and grouting procedures. RIPE also provides all related packer test equipment and accessories.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
162 views2 pages
73 DST Packer Test Tool
RIPE Inflatable Packers manufactures and supplies inflatable packers for down-hole packer tests, casing repairs, hydraulic fracturing, water well abandonments and grouting procedures. RIPE also provides all related packer test equipment and accessories.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2
GEO-Packers T M
DST PACKER T EST T OOL
G E O - P A C K E R 0 7 3 m m PO DST SINGLE PACKER T EST ING T OOL PQ73LP425E0.5 1. Pull th inneYT e assembly from the core barrel, leaving the drill string in place. 2. Elevate the drill strin9 off the drill hole bottomand I expose th permeaBlity zone. 3. Secure/ st bilise the drill `string in place. LINE. Install the sealing tight head. 5. Lower the packer through the sealing tight head and drilPtring, positioning into the core barrel. Install steel washers and rubber shies in the tight ead and tighten the compression cap. 7. Co ect the nylon inflation tube to the g 8. Slow inflate the permeability packer in i of until e desired pressure is met. Inject wa r through the tight head asse , packer into he test zone. .permeability ermeability est is run in under instruction b oject engin r. 1 1Once testing is omplete deflate the packer. 1, 12. M ake suee pack r is fully deflated before movin fromthe drill ho e. 13. Undo comp si n tight head and remove rubbe seals and stee shers. 14. Reinstall the compression cap and remove the packer. 15. Remove the seal ng tight head and then lower the inner tube assembl into position. SUB 16. Connect the dr I rods, lowering the drill string t the hole botto and restart drilling. 17. OHS procedu es must be followed. 18. flation an use of packers and packer equip h - - rators own risk. WIRELIVE CORING DIAMOND BIT SPEC Bit set ID s/air supp ly. rements CORED Hair-SIZE 84.96 mm 12 2 .3 ' f f lf r) Sik PODRILL ROD SPE !CATIONS WEIGHT g) VOLUME (Litres) 48.02 1 ' 2 55.10 Max Working pressure vs hole diameter Borehole diameter (mm) 76 80 85 90 95 100 105 110 115 12 0 12 5 13 0 13 5 140 145 150 Percentage Inf lation diameter 4.1 9.6 16.4 2 3 .3 3 0.1 3 7 43 .8 50.7 57.5 64.4 71.2 78 84.9 91.8 98.6 105.5 Inf lation pressure (bar) 110 100 90 80 70 60 55 50 40 3 5 3 0 3 0 2 5 2 5 2 5 2 0 Non conf ined Free air Inf lation Diameter (mm) 75 80 85 90 95 100 105 110 115 12 0 12 5 13 0 13 5 140 145 150 155 160 Inf lation pressure (bar) 0.5 1.2 1.4 1.7 2 2 .2 2 .4 2 .5 2 .7 3 3 .2 3 .5 4 4.5 5.5 6.5 8.5 12 Replacement Inflatable Packers and Elements Pty Ltd 29 Wheeler St Belmont 6104, Perth Western Australia T el: (+61 (08) 9475 0700 Fax: +61 (08) 9475 0770 [email protected] www.ripe-packers.com WA Australia Supplier Manuf acturer of Inf latable Packers for DST Well Packer Testing Permeability single/ double packer testing equipment and Services AU. Perm bility Packer Test Procedure GEO-Packers T M DST PACKER T EST T OOL G E O - P A C K E R 0 7 3 m m Pa DST DOUBLE PACKER T EST ING T OOL NFLATION / WIRELINE SEALING T IGHT HEAD PQ73LP425E0.5 RIG WIRELINE Pull th inneYT e assembly from the core barrel, leaving the drill string in place. 2. Elevate the drill strin9 off the drill hole bottomand expose th permeaBlity zone. 3. Secure/ st bilise the drill)ktring in place. Install the sealing tight head. 5. Lower the packer through the sealing tight head and drilPtring, positioning into the core barrel. Install steel washers and rubber shies in the tight ead and tighten the compression cap. 7. Co ect the nylon inflation tube to the g s/air supply. 4 ,e 8. Slow inflate the permeability packer in i rements of until e desired pressure is met. 1 . -PO CORE OLE Inject wa r through the tight head asse packer - 4 into he test zone. 1 0. ermeability est is run in under instruction b oject engin er. 1 1 Once testing is omplete deflate the packer. 1 2. M ake suds pack r is fully deflated before movin fromthe drill ho e. 1 3. Undo comp Si n tight head and remove rubbe seals and stee shers. 1 4. Reinstall the co pression cap and remove the packs 1 5. Remove the seal ng tight head and then lower the inner tube assembl into position. 1 6. Connect the dr' I rods, lowering the drill string t the hole botto and restart drilling. 7. OHS procedu es must be followed. flation an use of packers and packer equip h op rators own risk. r. 0 WIREL ORIN G DIAM OND BIT SP CORED HOLE SIZE 1 22.3 mm PO DRILL ROD SPECIFICATION S WEIG H T ( kg ) VOL E (Litres) 255.1 0 48.02 Max Working pressure vs hole diameter Borehole diameter ( mm) 76 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 Percentag e Inflation diameter 4.1 9.6 16.423.3 30.1 37 43.8 50.7 57.5 64.471.2 78 84.9 91.8 98.6 105.5 Inflation pressure ( bar) 110 100 90 80 70 60 55 50 40 35 30 30 25 25 25 20 N on confined Free air Inflation Diameter ( mm) 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 Inflation pressure ( bar) 0.5 1.2 1.4 1.7 2 2.2 2.42.5 2.7 3 3.2 3.5 44.5 5.5 6.5 8.5 12 Replacement Inflatable Packers and Elements Pty Ltd 29 Wheeler St Belmont 61 04, Perth Western Australia T el: (+6 1 (08) 9475 0700 Fax: +61 (08) 9475 0770 [email protected] www.ripe-packers.com WA Australia Supplier Manufacturer of Inflatable Packers for DST Well Packer Testing Permeability single/ double packer testing equipment and Services AU.