This document outlines requirements for piling plan submissions in Singapore. It discusses several key requirements:
1. Types of information that must be included on piling plans such as pile type and capacity, site investigation details, pile depth and founding criteria.
2. Regulations and industry standards like the Building Control Regulations and Code of Practice for Foundations that provide guidelines for pile design, testing, and construction.
3. Best practices for designing and constructing pile foundations, including reducing reliance on end bearing capacity and applying safety factors to skin friction values.
The goal is to help engineers properly design and document pile foundations in compliance with local regulations.
This document outlines requirements for piling plan submissions in Singapore. It discusses several key requirements:
1. Types of information that must be included on piling plans such as pile type and capacity, site investigation details, pile depth and founding criteria.
2. Regulations and industry standards like the Building Control Regulations and Code of Practice for Foundations that provide guidelines for pile design, testing, and construction.
3. Best practices for designing and constructing pile foundations, including reducing reliance on end bearing capacity and applying safety factors to skin friction values.
The goal is to help engineers properly design and document pile foundations in compliance with local regulations.
Building and Construction Authority Requirements on piling plan submission Under BC (Amendment) Act 2007 & Regulations 2008 2 Types of piling submissions Bored cast-in place piles Barrettes Grouted micropiles 3 Types of piling submissions Driven piles Jacked-in piles 4 Objective To help Qualified Persons who prepare the piling plans to comply with requirements of BC (Amendment) Act 2007 & Regulations 2008 5 Overview 1. Submission checklist 2. BC Regulations 10(2) 3. SS CP4 : 2003 4. BCA / IES / ACES Advisory Note on Site investigation & Load test 5. Piling Annexes B, C, D 6. Good practices in design & construction 6 (1) Submi ssi on c hec k l i st 7 Submission checklist I. Piling plans endorsed by QP and AC II. Design reports by QP and AC III. Declaration forms by QP and AC IV. Site investigation report, endorsed & certified by a PE V. A plan showing the layout and location of the site, boundary line and neighbouring buildings VI. Impact assessment report, where applicable (eg. for foundations located within influence zone of sensitive structures, like MRT or CST tunnels) VII. Clearance letters, where applicable, from the relevant authority 8 Certifications by QP and AC on plans A C P E 9 Certifications by QP(geo) and AC(geo) on plans A C ( g e o ) P E ( g e o ) 10 11 Certification by PE for SI report 12 Pl an t o show Si t e Loc at i on Pl an t o show Si t e Loc at i on Proposed Construction Site S y e d A l w i R d D e s k e r R d J a l a n B e s a r s i t e S e r a n g o o n R o a d 13 An example of project close to sensitive structures C S T
t u n n e l Pile Raft for a 66-storey building P U B
d r a i n M R T
s t a t i o n C S T
t u n n e l MRT lines 14 (2) Bui l di ng Cont r ol Regul at i on 10(2) 15 Regulations 2003 Regulation 10(2) 16 Regulations 2008 Regulation 10(2) the estimated pile penetration depth for each design zone ; the location of piles and site investigation boreholes ; 17 Regulations 2008 Reg 10A(5) (Plans of foundation 30storeys) 18 Building Control Regulations 2008 Regulation 10(2) the estimated pile penetration depth for each design zone ; the location of piles and site investigation boreholes ; 19 (a) Pile type & material specification, pile joints, sectional details I. Do the plans show the pile types and material specification ? II. Do the plans show pile size and pile details? III. Do the plans show the pile capacity ? (i) allowable foundation capacity, before and after accounting for negative skin friction, (ii) allowable tension load, lateral load, where applicable. Items to be shown on piling plan 20 Pile capacity & Pile reinforcement Pile diameter Working load Pile reinforcement 21 Details of Pile reinforcement Anchorage length Lap length Full depth cage /12m cage Sectional details 22 Details of RC pile Sectional details Joint details Pilecap connection details 23 (b) Site investigation borehole I. Do the plans show location of site investigation boreholes? II. Is there any borehole within the footprint of each block ? III. Do number of boreholes exceed minimum ? IV. Is depth of any borehole beyond proposed pile penetration depth ? (see BCA/IES/ACES advisory note 2003) Items to be shown on piling plan For buildings of 10-storeys or more 24 Site investigation boreholes (1) Footprint of tower block Total = 5 boreholes 25 Total = 10 boreholes Site investigation boreholes (2) 26 Site investigation boreholes (3) Total = 26 boreholes 27 (c) Pile depth & (d) Pile founding criteria I. Do the plans show pile design zones (based on site investigation information) ? II. Do the plans show the following information ? (i) pile founding criteria (eg. pile founding depth / minimum embedment into competent stratum / pile set criteria / magnitude of jack in load) (ii) a description of soil / rock for founding layer. Items to be shown on piling plan 28 Pile design zones based on boreholes 29 Example 1 Pile founding criteria (in hard soil) 30 Example 2 Pile founding criteria (in hard soil & rock) 31 Example 3 Pile founding criteria (pile set) 32 (e) Geotechnical parameters I. Do the plans contain unit shaft friction and unit pile base resistance used for pile design ? II. Are soil strata / rock type given for the above ? Items to be shown on piling plan 33 Unit shaft friction & base resistance used in pile design 34 (f) Negative skin friction I. Is there a design evaluation of the possibility of negative skin friction ? (i.e. whether the soil is still undergoing consolidation at its final stress state ?) II. Has negative skin friction been considered in the design ? Items to be shown on piling plan 35 (g) Allowable settlements I. Are allowable total and differential foundation settlements shown on plan ? II. Are these allowable foundation settlements consistent with the design calculation ? 36 Sample variation of building settlement with time during superstructure erection Set t l ement i nc r eases w i t h bui l di ng hei ght . 10 th 1.5mm 20 th 3.0mm 30 th 4.5mm 40 th 6.5mm 43 rd 8.0mm 37 (h) Vibration limits I. Are allowable vibration limits specified on the plan ? 38 DIN 4150 : Part 3 Structural vibration in buildings Guideline on Limit of vibration Type 1 Type 2 Type 3 39 (i) Verification tests I. Do the plans contain the following information ? (i) number of tests, (ii) types of pile tests. II. Are types and number of tests provided complied with BCA/IES/ACES advisory note 2003 ? III. Is location of ultimate pile load test shown on plan, and correlated with borelog ? IV. Will the preliminary piles for the ultimate pile load test be instrumented, to verify the geotechnical parameters ? (Applicable to piles where strain gauges could be installed along the pile, eg. bored piles, hollow spun pile) 40 2 U L T
+
5 W L T
+
9 P D A E x c e e d e d
m i n i m u m
! 41 Preliminary pile to be instrumented 42 Items to be shown on piling plan a) Pile type & material specification, pile joints, sectional details b) Site investigation boreholes c) Estimated pile length for each design zone d) Minimum embedded depth into competent stratum e) Skin friction & End bearing for pile design f) Pile capacity before & after negative skin friction g) Allowable settlements h) Allowable vibration limits i) Pile load test & location A
r e c a p 43 (3) SS CP4 : 2003 (Code of Practice for Foundations) 44 Code of Practice CP4 : 2003 45 Design for pile foundations [CP4 Clause 7.3.1] Every pile design has to satisfy 3 conditions: 1. Adequate safety factor against failure 2. Settlement of foundation under working load should not affect the serviceability of structure 3. Safety of nearby buildings should not be put at risk 46 Pile Group Effect (CP4 Clause 7.3.4) I. Group settlement is greater than settlement of individual pile II. Differential settlement between two pile groups < 1:500 47 300 nos 1.8m piles within 60mx60m footprint An example where pile group effect is dominant with overlapping of stress bulbs of individual piles 48 Effect of lateral forces during basement excavation (CP4 Clause 7.4.5.3.2) If bored piles are subject to lateral forces, reinforcement should be adequately provided for bending moments. to full pile length or to where bending moment is negligible. 49 An example of effect of basement excavation on foundation piles 15m excav Marine clay Dwall GMP 4 struts 50 Table 1 Pile Ecc and Maximum Forces at Final Stage of Excavation Pile Position from Max ecc Max N Max BM Max SF Dwall [m] [mm] [kN] [kNm] [kN] Remarks L1 4 20 2029 615 -595 in GMP L2 12 18 1782 488 -346 in GMP L3 20 7 1753 229 -372 in GMP R1 4 36 2340 820 1030 in GMP R2 12 30 3592 -740 357 in GMP R3 20 24 3255 -645 236 in GMP Foundation piles move by 36mm, and experience bending moment of 820 kNm ! Foundation piles should be designed for the effect of basement excavation. 51 (4) BCA / IES / ACES Advisory note (for buildings of 10-storeys or more) 52 Requirements for Site Investigation - 5 metre into hard stratum with N>100 - 3 times pile diameters beyond pile founding level. (b) Depth of boreholes - 1 borehole per 300 m 2 - 1 borehole at 10 to 30m spacing - Minimum 3 boreholes (a) Number of boreholes Minimum requirement to establish the soil strata and ground variation 53 Example of soil profile for Bukit Timah Formatio (1) Rockhead varies from RL 102m to RL88m (2) The quality of bedrock varies greatly. Min. 5m into hard stratum 54 Example of soil profile for Jurong Formation Min. 3 pile diameters below intended pile founding level 55 Requirements for pile load tests 2 numbers or 2% of working piles installed, whichever is greater. (c) Non-destructive integrity test. (Note: This is for the purpose of quality control, and high-strain type should be used for bored piles) 2 numbers or 1% of working piles installed or 1 for every 50 metres length of proposed building, whichever is greater. (b) Working load test 1 number or 0.5% of the total piles whichever is greater. (a) Ultimate load test on preliminary pile (preferably instrumented) Pile Test Schedule Type of Load Test 56 Load measurement for pile load tests (CP4 Clause 7.5.5.2.1) Load should be measured by a calibrated load gauge & a calibrated pressure gauge 57 (5) Pi l i ng Annex es (for buildings of 10-storeys or more) 58 Piling Annex B Certificate of supervision of pile load test Q P B u i l d e r S i t e
s u p e r v i s o r Q P ( g e o ) 59 Piling Annex C Interim certificate of supervision of piling works Q P B u i l d e r S i t e
s u p e r v i s o r Q P ( g e o ) 60 Piling Annex D Certificate for monitoring building settlement S i g n e d
b y
Q P S i g n e d
b y
Q P ( g e o ) 61 (6) Some good pr ac t i c es i n pi l e desi gn & c onst r uc t i on 62 a) Reduce over-reliance on pile base resistance 1) Applying a minimum safety factor to skin friction, for bored piles, where soft toe may occur 63 a) Reduce over-reliance on pile base resistance 2) In erractic soil condition, eg limestone area 3 5 m 3-m thick cavity limestone limestone 64 (b) Preliminary pile at borehole location Borehole Ultimate test pile 65 (c) J udicious location of strain gauges Taking into account : - change of soil layers - thickness - variability To aid interpretation eg. measurement of skin friction at various soil /rock layers 66 (d) Innovative Investigative preliminary pile Preliminary piles may be formed with voids at base or soft toes to determine ultimate shaft resistance CP4 Clause 7.5.4.1 67 (e) Investigative preliminary piles installed using similar construction method as working production piles Dry hole method Wet hole method CP4 Clause 7.5.4.1 68 (f) Proper transfer of load to Kentledge frame Use stiffener for effective transfer 69 g) Minimum distance between test pile & Kentledge leg Distance between Kentledge leg to surface of test pile 1.3 m (CP4 Clause 7.5.5.2.1) 70 (h) No preloading on piles before test 71 Pile Size Working Load Nos No. of Method of (mm) (kN) Load Test Test ASM - 135 0 - 1000 5800 147 0 - 1200 8400 99 1 Kentledge 1500 13200 115 2 Kentledge 1800 19000 159 3 Bi-Directional 2000 23500 96 1 Bi-Directional 2200 28500 88 1 Bi-Directional 2500 36800 62 1 Bi-Directional 2800 41600 22 1 Bi-Directional 3000 53000 16 0 - Total : 939 10 (i) Conduct working load test at location where it matters Examples : (1) Piles within the tower footprint (2) Piles carrying larger load 72 (j) No preselection of pile for working load test 73 (k) Keep rock/soil sample at site for verification 74 (l) Impose quality control measure at site 1) Pile bore stability 2) Pile base cleanliness 3) Tests on stabilizing fluids 75 (l) Impose quality control measures at site 4) Sufficient cooling time for weld to gain strength 76 (m) Check & verify obvious change in pile depth Eg: (1) Site investigation (2) Load tests 77 Recap of Some Good Practices a) Reduce over-reliance on pile base resistance b) Preliminary pile at borehole location c) Judicious location of strain gauges d) Innovative preliminary pile e) Preliminary pile installed using same method as working piles f) Proper load transfer to Kentledge frame g) Minimum distance between test pile & Kentledge leg h) No preloading on piles before test i) Conduct working load test at location where it matters j) No preselection of pile for working load test k) Check & verify obvious change in pile depth l) Keep soil/rock samples at site for verification m) Impose quality control at site 78 Summary 1. Requirements of piling plan submission under recent BC amendment Act and Regulations 2. Requirements for foundations of buildings more than 10-storeys 3. Good practices in design, load tests & construction 79 Concluding remark QP who prepare plans and calculations for piling plans have to comply with the requirements of BC Act and regulations Standard Certification by QP on plans and calculations I .... certify that they have been prepared in accordance with the provisions of the Building Control Regulations, the Building Control Act and any other written law pertaining to buildings and construction for the time being in force. 80 Thank you ! THE END