This document provides a cheat sheet of formulas and information for construction engineering. It includes basics on earthwork construction and layout such as conversions and slope formulas. It also covers estimating quantities and costs using different take-off methods. Finally, it summarizes equipment production rates for dozers, graders, scrapers, loaders, excavators, compactors, and dump trucks.

Uploaded by

Cresanelle Polo
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views

Construction Engineering Formula Cheat Sheet

This document provides a cheat sheet of formulas and information for construction engineering. It includes basics on earthwork construction and layout such as conversions and slope formulas. It also covers estimating quantities and costs using different take-off methods. Finally, it summarizes equipment production rates for dozers, graders, scrapers, loaders, excavators, compactors, and dump trucks.

Uploaded by

Cresanelle Polo
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

Construction Engineering Formula Cheat Sheet

Earthwork Construction and Layout


Basic Conversions
1 cubic yard = 27 cubic feet
Basic must know properties
Density of Water = 62.42 pounds per CF (pcf), 1,000 !"iter = 1,000#!$
%
&cono$ic 'au" Distance( )are Do*er up to %00 ft( +craper %00 , -00 ft( .ruc#s / -00 ft
&0ca1ation and e$ban#$ent
2enera" .rape*oida" For$u"a3 4rea = (50!2 6 51 6 52 6 76 5(n81) 6 5n!2) 0 9
41erae end area :et5od = ; = ((41642)!2) < )
=ris$oida" :et5od = ;p = )<(41644:642) ! 6
=yra$id :et5od = ; = 4) ! %
>orro9 =it ;o"u$es
Conica" +poi" =i"e = ;o" = (4b 0 ') ! %( D = (7.64; ! tan )
1!%
( ' = (D!2) tan (95ere 4b=base area(
'=pi"e 5ei5t(D=dia$eter( = an"e of repose (de)
.rianu"ar +poi" >an# = ;o" = Cross section 4rea 0 ) ( > = (4;!() 0 tan )
1!%
( ' = (> 0 tan ) ! 2 ( ;= pi"e 1o"u$e( >=
base 9idt5 ( ' = pi"e 5t( ) = pi"e "ent5 ( = an"e of repose (de)
Density of Water = ?
9ater
= :
9
!;
9

:oisture Content (9) = :
9
!:
s
Deree of +aturation (+) = ;
9
!;
1

.ota" or Wet Density of +oi" (?
9et
) = :!; 95ere :

= :
9
6 :
s (
; = ;
9
6 ;
s
6 ;
a
Density of +o"ids = :
s
!;
s

+pecific 2ra1ity = 2
s
= ?
so"ids
!?
9ater ( or =
:
s
!(;
s
< ?
9ater
)
=orosity (n) = ;
1
!;
t (
;
1
= ;o"u$e of ;oids = ;
9
6 ;
a
( ;
t
= .ota" ;o"u$e = ;
s
6;
9
6 ;
a

;oid @atio (e) = ;
1
!;
s

Dry Density of +oi" (?
dry
) = :
s
!;
Dry Density of +oi" (?
dry
) = ?
9et
! (169)( (?
dry
) = (?
9ater
<2
s
) ! (16(9!+)<2
s
)
(?
dry
)=(?
9ater
< 2
s
)!(16e)
+pecific 2ra1ity = +

< e = 2
s
< 9
=orosity (n) = e!(16e)
;oid @atio (e) = n!(18n)
;
Co$pacted
= ;
>an#ed
(1 , +'@ABC42&)
;
)oose
= ;
>an#ed
(16+W&)))
+9e"" D = ((D> , D)) ! D)) 0 100 ( +9e"" = (D> , D))!D)
+5rin#ae D = ((DC , D>) ! D)) 0 100 ( +5rin#ae = (DC , D>)!D)
D) = Dry )oose unit 9t (pcf) ( D> = Dry >an# unit 9t (pcf) ( DC = Dry co$pacted unit 9t(pcf)
;"oose = ;c (16+9"")!(18 +5rin#ae) ( ;ban# = ;c ! (18+5rin#ae)
+ite )ayout and Contro"
'ei5t of Anstru$ent ('A) = Cno9n e"e1ation 6 >ac#si5t (>+)
.urnin =oint (.=) = 'ei5t of Anstru$ent ('A) , Foresi5t (F+)
.riono$etric )e1e"in &"e1ation at un#no9n "ocation = e"e1ation at #no9n 6 'A 6 (s"ope distance sin (an"e of
s"ope)) , distance fro$ #no9n to un#no9n "ocation
.ra1erse 4rea3 :et5od of Coordinates .5e area is 4 = E (+u$ of fu"" "ine products , +u$ of bro#en "ine products)
&art59or# :ass Diara$s
@isin section = cut( Fa""in section = fi""( *ero s"ope = $o1in fro$ cut to fi"" or 1ice 1ersa
Estimating Quantities and Cost
Quantity take-off methods
.renc5in3 >e carefu" to fu""y understand 95at t5e di$ensions represent, Fse 5ori*onta" An8An and ;ertica" Gut8Gut
&sti$atin H bric#s in 9a"" 3 net 9a"" (sf) = 2ross surface 4rea of Wa"" (sf) , 4rea of open surface (sf) t5en find
surface area of bric# 9it5 $ortar (sf) (net 9a"" ! +4 of one bric#) 0 H ro9s = bric#s in 9a""
;o"u$e of $ortar per bric# = ($ortar t5ic#ness)(bric# 9idt5)("ent5 6 5ei5t 6 $ortar t5ic#ness)
>oard feet = .5ic#ness(in) 0 Widt5 (in) 0 )ent5 (in) ! 144
@ebar = W5en findin t5e nu$ber of rebar bars in 9a"" = (t5e "ent5 of 9a"" ! spacin of bars) 6 1
Cost esti$atin
&nineerin econo$ics
=resent!Future ;a"ue3 F= =(16i)
n
or = = F! (16i)
n
(
i= (F!=)
1!n
, 1
+eries =ay$ent 3 ==4I(16i)
n
8 1J!IA (16i)
n
J ( F=4I(16i)
n
8 1J!IiJ
Future!=resent ;a"ue and 4rit5$etic radient3 F=2!iI((16i)
n
8 1)!i)8nJ ( ==2(i(16i)
n
8 iB 8 1)!(i
2
(16i)
n
J
Depreciation3
+trai5t )ine :et5od 3 Dn = (Anitia" Cost , +a"1ae ;a"ue)! B
+u$ of t5e years Diit :et5od3 Dn = (n
2
6 n)! 2
Dec"inin ba"ance :et5od3 Dn = 2 0 (1!n)
Construction Operations and ethods
)iftin and @iin
+o"1e for Center of 2ra1ity3 40 = (41)(01) 6 (42)(02) 6 7 6 (4n)(0n) ( 95ere 4= .ota" 4rea
0 = distance to t5e Co2 in t5e 0 direction, 41 and 42 = 4rea!;o"u$e or :ass( 01 and 02 = distance to t5e Co2


Crane se"ection erection and stabi"ity
Crane +tabi"ity3 Factor of +afety aainst topp"in = @esistin $o$ent ! .opp"in $o$ent
.opp"in :o$ent = (Wei5t of )oad(W))) 0 (Distance fro$ topp"in pt to )oad)())) 6 Wei5t of boo$(W>) 0
Distance to Center of >oo$()>)
@esistin :o$ent = = (Wei5t of Counter Wei5t (WC)) 0 (Distance fro$ topp"in pt to Counter9ei5t)()C) 6 Wei5t
of Crane >ody(W2) 0 Distance to Center of Crane >ody()2)
De9aterin and =u$pin
&Kuip$ent =roduction
Do*er3 .ota" .i$e = L ! (= 0 B) 3 L = Luantity of $ateria" to be $o1ed( = = 5our"y production rate per do*er( B =
Bu$ber of Do*ers
2rader3 .ota" .i$e = (= 0 D) ! (+ 0 &)3 == nu$ber of passes reKuired( D = distance tra1e"ed in eac5 pass, in $i"es or
feet( + = speed of rader, in $p5 or fp$ ($u"tip"y $p5 by MM to con1ert to fp$( & = efficiency factor
+craper3 .ota" ti$e (5ours) = L ! = 0 B L = tota" 1o"u$e to $o1e(>CN), = = 5our"y production rate (>CN!5r), B =
nu$ber of scrapers
)oader3 :a0i$u$ production rate ()CN per 5our) = 5eaped buc#et capacity 0 buc#et fi"" factor 0 60 $inutes! "oader
cyc"e ti$e ($in) Bet production rate ()CN per 5our) = $a0i$u$ production rate ()CN per 5our) 0 efficiency factor
&0ca1ator3 K = ((%600 sec!5our 0 > 0 & 0 =)! C) 0 ;o"u$e Correction K = ;o"u$e of soi" e0ca1ated and du$ped in a
truc# by t5e e0ca1ator (CN!5r), > = >uc#et struc# capacity (CN), & = >uc#et efficiency factor, = = =roducti1ity factor,
C = Cyc"e ti$e for O0 deree an"e and opti$u$ dept5
Co$pactor3 =roduction (CCN per 5our) = (16.% 0 W 0 + 0 ) 0 &) ! B W = co$pacted 9idt5 per pass (in feet), + =
co$pactor speed($p5), )= co$pacted "ift t5ic#ness(in), & = efficiency, B = nu$ber of passes reKuired
Co$pactor3 Co$pactors reKuired = FD 0 +CF ! C= FD = a$ount of fi"" de"i1ered ()CN per 5our), +CF = soi"
con1ersion factor ()CN3>CN), C= = co$pactor production (CCN per 5our)
Du$p .ruc#3 Bu$ber of truc#s reKuired = 1 6 truc# cyc"e ti$e ($inutes) ! "oader cyc"e ti$e ($inutes)
=roducti1ity ana"ysis and i$pro1e$ents
.e$porary &rosion Contro"
A;. +c5edu"in (17.-D3 P7 4fternoon Kuestions and 1!2 $ornin)
< Construction +eKuencin
C=: Bet9or# 4na"ysis
4cti1ity .i$e 4na"ysis
< @esource +c5edu"in
< .i$e Cost .rade off
;. :ateria" Lua"ity Contro" and =roduction(10D3 4 4fternoon Kuestions and 1 $ornin)
< :ateria" .estin (e. concrete, soi"s, asp5a"t)
We"din and >o"tin .estin
Lua"ity Contro" =rocess (L4!LC)
Concrete :i0 Desin 8 (LQ4)
;A. .e$porary +tructures (12.-D3 P - 4fternoon Kuestions and 1 $ornin)
< Construction )oads
For$9or#
Fa"se9or# and +caffo"din
+5orin and @es5orin
Concrete $aturity and ear"y strent5 e1a"uation
>racin
4nc5orae
Cofferda$ (syste$s for te$porary e0ca1ation support)
Codes and standards (e.. 4$erican +ociety of Ci1i" &nineers(4+C&%7), 4$erican Concrete Anstitute(4CA %47), 4$erican Forest and =aper
4ssociation , BD+, :asonry Wa"" >racin +tandard)
;AA. Wor#er 'ea"t5, +afety, and &n1iron$ent (7.-D3 P% 4fternoon Kuestions)
G+'4 @eu"ations
+afety :anae$ent
+afety +tatistics (e.., incident rate, &:@)
;AAA. Gt5er .opics (10D3 P4 4fternoon Kuestions)
.5ese topics are actua""y so$e of t5e dept5 sections for t5e ot5er &nineerin $odu"es. 4s you can see t5ere is a "ot of $ateria" to study for Rust four
Kuestions t5at 9i"" be as#ed. .5ese t5ins are 9ort5 "oo#in o1er but A 9ou"dnSt spend to $uc5 ti$e studyin t5ese sections.
2round9ater and 9e"" fie"ds (2round9ater contro" inc"udin drainae, Construction De9aterin)
+ubsurface e0p"oration and sa$p"in (dri""in and sa$p"in procedures)
&art5 retainin structures (a. :ec5anica""y stabi"i*ed eart5 9a"", b. +oi" and roc# anc5ors)
Deep foundations (a. =i"e "oad test, b. =i"e insta""ation)
)oadins (a. Wind, b. +no9, c. )oad pat5s)
:ec5anics of $ateria"s(=roressi1e Co""apse) 8 in8dept5 course
:ateria"s (a. Concrete(=restressed concrete, post tensioned), b. .i$ber)
.raffic safety( Wor# *one safety)